Disassembly Procedure

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
(A)     1P-2420     Transmission Repair Stand     1    
(B)     138-7573     Link Bracket     2    
(C)     154-6181     Forcing Screw     2    
(D)     138-7574     Link Bracket     2    
(E)     5F-7366     Forcing Screw     1    
1P-5546 Crossblock     1    
1U-9889 Crossblock     1    
1P-0520 Driver Group     1    
6V-7888 Puller Leg     2    
1H-3112 Puller Assembly     1    
1P-5551 Adjustable Screw Assembly     1    

Start By:

  1. Remove the final drive. Refer to Disassembly and Assembly, "Final Drive - Remove" in this manual.

    Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of the component should be thoroughly cleaned. This will prevent dirt from entering the internal mechanism.

  1. Put an alignment mark across the sections of the final drive for assembly purposes. The parts must be reinstalled in the part's original locations.



    Illustration 1g00708089

  1. Fasten the final drive to Tooling (A), as shown. The combined weight of the final drive and final drive sprocket is 272 kg (600 lb).

  1. Remove bolts (1) and the washers that hold the cover in position.



    Illustration 2g00708090

  1. Remove the setscrews from the cover. Fasten Tooling (B) and a hoist to cover (2), as shown. Remove the cover. The weight of the cover is approximately 27 kg (60 lb).



    Illustration 3g00708091

  1. Remove thrust plate (3) from cover (2) .

  1. Remove two plugs (4) from cover (2) .



    Illustration 4g00708235

  1. Remove O-ring seals (5) from both plugs (4) that were in the cover.



    Illustration 5g00708092

  1. Remove spacer (6) from carrier assembly (7) .

  1. Remove sun gear (8) from carrier assembly (7) .

  1. Remove carrier assembly (7) by lifting the carrier assembly straight up. The weight of the carrier assembly is approximately 23 kg (51 lb).



    Illustration 6g00708095

  1. Disassemble carrier assembly (7), as follows.

    1. Drive spring pin (10) into planetary shaft (9) with a hammer and a punch.



      Illustration 7g00708144

    1. Remove planetary shaft (9) with spring pin (10) from the carrier assembly.

    1. Remove spring pin (10) from planetary shaft (9) with a hammer and a punch.



      Illustration 8g00708218

    1. Remove two thrust washers (11) and planetary gear (13) from the carrier assembly.

    1. Remove bearing (12) from planetary gear (13) .

  1. Repeat Steps 11.a through 11.e in order to remove the other two planetary gears from the carrier assembly.



    Illustration 9g00708162

  1. Remove sun gear (14) from carrier assembly (15) .



    Illustration 10g00708325

  1. Remove spacer (16) .



    Illustration 11g00708184

    Note: It will be necessary to pry ring gears (17) away from main housing (18) in order to install the lifting slings.

  1. Fasten lifting slings and a hoist to ring gears (17), as shown. Remove the ring gears from main housing (18). The weight of the ring gears is 48 kg (106 lb).



    Illustration 12g00708360

  1. Use a screwdriver or a chisel in order to separate the two ring gears (17) .

    Note: The two ring gears are held together with 1U-8846 Sealant. It may be necessary to heat the ring gears in order to soften the sealant. Do not heat over 135 °C (275 °F) for more than thirty minutes.




    Illustration 13g00708172

  1. Position a 12.7 mm (0.50 inch) shackle under carrier assembly (15) .

  1. Fasten a lifting sling and a hoist to the shackle.

  1. Slowly lift carrier assembly (15) from the final drive. The weight of the carrier assembly is 42 kg (93 lb).

  1. Disassemble carrier assembly (15), as follows.



      Illustration 14g00708175

    1. Drive spring pin (20) into planetary shaft (19) with a hammer and a punch.



      Illustration 15g00708370

    1. Remove planetary shaft (19) with spring pin (20) from the carrier assembly.

    1. Remove spring pin (20) from planetary shaft (19) with a hammer and a punch.



      Illustration 16g00708220

    1. Remove two thrust washers (21) and planetary gear (23) from the carrier assembly.

    1. Remove two bearings (22) from the planetary gear.

  1. Repeat Steps 20.a through 20.e in order to remove the other two planetary gears from the carrier.



    Illustration 17g00708186

  1. Remove O-ring seal (24) from main housing (18) .



    Illustration 18g00708187

  1. Remove bolts (25) from gear (26) .



    Illustration 19g00708202

  1. Use Tooling (C) in order to remove gear (26) from main housing (18) .

    Note: The motor housing will separate from the main housing (18) once gear (26) is removed. Make sure that the motor housing is supported.




    Illustration 20g00708211

  1. Remove shims (27) from the main housing.



    Illustration 21g00708212

  1. Fasten Tooling (D) and a hoist to main housing (18), as shown.

  1. Use a hammer and a punch in order to separate main housing (18) and the final drive sprocket from the motor housing (28). The combined weight of the main housing and final drive sprocket is approximately 84 kg (185 lb).



    Illustration 22g00708214

  1. Remove Duo-Cone seal (29) from motor housing (28) .

  1. Remove alignment pins (30) .



    Illustration 23g00708215



    Illustration 24g00708216

  1. Remove Duo-Cone seal (31) from main housing (18) .

  1. Use Tooling (E) in order to remove bearings (32) and (33) from the main housing.

  1. If necessary, remove the final drive sprocket from the main housing.

    Reference: Refer to Disassembly and Assembly, "Final Drive Sprocket - Remove and Install" in this manual for the removal of the final drive sprocket from the main housing.

Caterpillar Information System:

G3612 and G3616 Engines Engine Support - Remove and Install
2002/02/01 Correction To Disassembly and Assembly Module, SENR5535-04, "G3612 and G3616 Engines" , "Cylinder Head - Remove" {1100}
CIPI UNDERCARRIAGE Arrangements: 9Q-5195, 9Q-5197, 9Q-5198, 9Q-5232, 9Q-5504, 9Q-5643, 9Q-5651, 9Q-5727, 9Q-5728, 9Q-5729, 9Q-5730, 9Q-5731, 9Q-5747, 9Q-5876, 180-4029, and 213-3892 Track Roller (Single Flange)
CIPI UNDERCARRIAGE Arrangements: 9Q-5262, 191-4041, and 204-9207 Track Adjuster
C7 and C9 On-Highway Engines Ignore Brake/Clutch Switch Circuit - Test
3126B and 3126E On-highway Engines Intermittent Cruise Control, Idle, or PTO Kickout
325C Excavator Machine System Specifications Recoil Spring
CIPI UNDERCARRIAGE Arrangements: 9Q-5195, 9Q-5197, 9Q-5198, 9Q-5232, 9Q-5504, 9Q-5643, 9Q-5651, 9Q-5727, 9Q-5728, 9Q-5729, 9Q-5730, 9Q-5731, 9Q-5747, 9Q-5876, 180-4029, and 213-3892 Recoil Spring
3126B and 3126E On-highway Engines Cruise Control, Idle, or PTO Can Not Be Set
C12 Marine Engine Cooling System - Test
CIPI UNDERCARRIAGE Arrangements: 9Q-5195, 9Q-5197, 9Q-5198, 9Q-5232, 9Q-5504, 9Q-5643, 9Q-5651, 9Q-5727, 9Q-5728, 9Q-5729, 9Q-5730, 9Q-5731, 9Q-5747, 9Q-5876, 180-4029, and 213-3892 Front Idler
CIPI UNDERCARRIAGE Arrangements: 9Q-5195, 9Q-5197, 9Q-5198, 9Q-5232, 9Q-5504, 9Q-5643, 9Q-5651, 9Q-5727, 9Q-5728, 9Q-5729, 9Q-5730, 9Q-5731, 9Q-5747, 9Q-5876, 180-4029, and 213-3892 Final Drive - Install
318C and 319C Excavators Machine System Specifications Track Roller (Single Flange)
2002/05/01 New Starting Motors Used {1453}
CPT372 Truck Mounted Pumper Control Panel
2002/02/01 A New Systems Operation/Testing And Adjusting Module, RENR5889, "Standby Pump Panel" Is Available {0758}
C7 and C9 On-Highway Engines Powertrain Data Link Circuit - Test
3512B Engine for SPF343, SPS343, and SPT343 Pumpers CAT Data Link
3054, 3054B and 3056 Marine Engines Rocker Shaft and Pushrod - Remove
2002/02/01 New Special Instruction, REHS1178, "Operating Instructions For The 4P-4788 Electrical Converter Gp And The 4P-4789 Electrical Converter Gp" Is Available {1421}
3054, 3054B and 3056 Marine Engines Rocker Shaft and Pushrod - Install
CIPI UNDERCARRIAGE Arrangements: 9Q-5195, 9Q-5197, 9Q-5198, 9Q-5232, 9Q-5504, 9Q-5643, 9Q-5651, 9Q-5727, 9Q-5728, 9Q-5729, 9Q-5730, 9Q-5731, 9Q-5747, 9Q-5876, 180-4029, and 213-3892 Final Drive - Assemble
Procedure For Sealing Cracks In The Air Plenum That Are On The Top Surface Of The Cylinder Block{1201} Procedure For Sealing Cracks In The Air Plenum That Are On The Top Surface Of The Cylinder Block{1201}
324D and 326D Excavators Machine System Specifications Track Roller Mounting
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.