CIPI UNDERCARRIAGE Arrangements: 9Q-5195, 9Q-5197, 9Q-5198, 9Q-5232, 9Q-5504, 9Q-5643, 9Q-5651, 9Q-5727, 9Q-5728, 9Q-5729, 9Q-5730, 9Q-5731, 9Q-5747, 9Q-5876, 180-4029, and 213-3892 Caterpillar


Final Drive - Assemble

Usage:

OEMS L5E

Assembly Procedure

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
(A)     1P-2420     Transmission Repair Stand     1    
(B)     138-7573     Link Bracket     2    
(C)     126-3994     Duo-Cone Seal Installer     1    
(D)     138-7574     Link Bracket     2    

    Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts. Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are worn or damaged, use new parts for replacement. All disassembly and all assembly procedures must be performed on a clean work surface and in a clean hydraulic area. Keep cleaned parts covered and protected at all times.

    Note: O-rings, gaskets, and seals should always be replaced. A used O-ring may not have the same sealing properties as a new O-ring. Use 1U-6396 O-Ring Assembly Compound during the assembly procedure.

    Note: Apply a light film of hydraulic oil to all components before assembly.

  1. Install the final drive sprocket if the sprocket was removed from the main housing.

    Reference: Refer to Disassembly and Assembly, "Final Drive Sprocket - Remove and Install" in this manual for the installation of the final drive sprocket.




    Illustration 1g00708215

  1. Apply 5P-3931 Anti-Seize Compound to the outer diameter of the bearings.

  1. Install bearings (32) and (33) in the original locations in the main housing (18) with a press.

  1. Make sure that bearing (32) and bearing (33) contact the counterbore in the main housing.

  1. Use the following procedure to preload the bearings and determine the correct thickness of shims.



      Illustration 2g00713058

    1. Fasten Tooling (D) and a hoist to main housing (18). Install the main housing on the motor housing.

    1. Put the main housing and the motor housing in a suitable press.



      Illustration 3g00709278

      (a) Bearing surface

      (b) Housing surface

    1. Use a suitable press and a spacer in order to apply a load of 4000 kg (8820 lb) on the bearings. Rotate the housing in order to seat the bearings.

    1. Reduce the load on the bearings to 1000 ± 100 kg (2200 ± 220 lb).

    1. Use a depth micrometer in order to measure the step length between the bearing surface and the housing surface. Take measurements at several different locations around the housing. Compute the average of the measured dimensions and record the number. Call this dimension (Y) .



      Illustration 4g00709276

    1. Use a depth micrometer in order to measure the step length of the coupling gear (26). Take measurements at several different locations around the gear. Compute the average of the measured dimensions and record the number. Call this dimension (X) .

    1. The thickness of the shims is equal to (X - Y) ± 0.05 mm (0.002 inch).

      Note: Use no more than two shims. If two shims are required, install the thinner shim next to the gear.

    1. Remove the main housing from the motor housing.



    Illustration 5g00713142

  1. Use Tooling (C) in order to install Duo-Cone seal (31) in main housing (18) .

    Reference: Refer to Disassembly and Assembly, "Duo-Cone Conventional Seals - Install" in this manual.

    Note: The rubber seals and all surfaces that make contact with the seals must be clean and dry. After installation of the seals, put clean SAE 30 oil on the contact surfaces of the metal seals.




    Illustration 6g00713147

  1. Use Tooling (C) in order to install Duo-Cone seal (29) in motor housing (28) .



    Illustration 7g00708214

  1. Apply 5P-3931 Anti-Seize Compound to the surfaces that contact pins (30).

  1. Install alignment pins (30) .

    Note: Do not damage the Duo-cone seals in the main housing or in the motor housing during the assembly of the two components. After installation of the main housing on the motor housing, there will be a small gap between the components. The gap is caused by the Duo-Cone seals. This gap will be eliminated during installation of gear (26).




    Illustration 8g00713058

  1. Fasten Tooling (D) and a hoist to main housing (18). Install the main housing on the motor housing.



    Illustration 9g00708211

  1. Install shims (27) that were determined in Step 5.g in the main housing.

    Note: If two shims are required, install the thinner shim next to the gear.




    Illustration 10g00708187

  1. Install gear (26) .

  1. Install bolts (25) in gear (26). Install the bolts in an even pattern until the gear is seated against the bearing. Tighten the bolts in a crisscross pattern. Tighten the bolts to a torque of 270 ± 40 N·m (200 ± 30 lb ft).



    Illustration 11g00708186

  1. Install O-ring seal (24) to main housing (18) .



    Illustration 12g00708175

  1. Assemble carrier assembly (15), as follows.



      Illustration 13g00708220

    1. Install two bearings (22) in planetary gear (23) .

    1. Install two thrust washers (21) and planetary gear (23) in the carrier assembly.

    1. Use a deburring tool in order to remove the metal burr from the openings in the carrier. Install planetary shaft (19) in the carrier assembly.

    1. Drive spring pin (20) into planetary shaft (19) with a hammer and a punch.



      Illustration 14g00513451

    1. Orient the split in spring pin (20) vertically to the carrier. Align the split in the spring pin to the top or to the bottom. Make a stake mark on each side of the spring pin hole in the carrier. Each stake mark should be approximately 1.5 mm (0.06 inch) from the outside diameter of the spring pin hole.

  1. Repeat Steps 15.a through 25.e in order to install the other two planetary gears in the carrier.



    Illustration 15g00708172

  1. Install a lifting sling through the middle of carrier assembly (15). Fasten a 12.7 mm (0.50 inch) shackle to the lifting sling. Fasten a hoist to the lifting sling.

  1. Install carrier assembly (15) on the final drive. The weight of the carrier assembly is 42 kg (93 lb).

  1. Remove the shackle, the lifting sling, and the hoist.



    Illustration 16g00713148

  1. Apply 1U-8846 Sealant to the mating surface of ring gear (17b) .

  1. Install ring gear (17a) on ring gear (17b) .



    Illustration 17g00708184

  1. Fasten lifting slings and a hoist to ring gears (17), as shown. Install the ring gears to main housing (18). The weight of the ring gears is 48 kg (106 lb).



    Illustration 18g00708325

  1. Install spacer (16) in the carrier assembly.



    Illustration 19g00708162

  1. Install sun gear (14) in carrier assembly (15) .



    Illustration 20g00708095

  1. Assemble carrier assembly (7), as follows.



      Illustration 21g00708218

    1. Install bearing (12) in planetary gear (13) .

    1. Install two thrust washers (11) and planetary gear (13) in the carrier assembly.

    1. Install planetary shaft (9) in the carrier assembly.

    1. Drive spring pin (10) into planetary shaft (9) with a hammer and a punch.



      Illustration 22g00513451

    1. Orient the split in spring pin (10) vertically to the carrier. Align the split in the spring pin to the top or to the bottom. Make a stake mark on each side of the spring pin hole in the carrier. Each stake mark should be approximately 1.5 mm (0.06 inch) from the outside diameter of the spring pin hole.

  1. Repeat Steps 25.a through 25.d in order to install the other two planetary gears in the carrier assembly.



    Illustration 23g00708092

  1. Install carrier assembly (7) in the ring gear. The weight of the carrier assembly is 23 kg (51 lb).

  1. Install sun gear (8) in carrier assembly (7) .

  1. Install spacer (6) in carrier assembly (7) .



    Illustration 24g00708235

  1. Install new O-ring seals (5) on plugs (4) that were in the cover.



    Illustration 25g00708091

  1. Install two plugs (4) in cover (2). Tighten the plugs to a torque of 80 ± 10 N·m (60 ± 7 lb ft).

  1. Install thrust plate (3) in cover (2) .

  1. Apply 1U-8846 Sealant to the mating surface of the ring gear.



    Illustration 26g00708090

  1. Fasten Tooling (B) and a hoist to cover (2), as shown. Install the cover. The weight of the cover is 27 kg (60 lb).

  1. Remove Tooling (B). Install the setscrews in cover (2) .



    Illustration 27g00708089

  1. Install bolts (1) and the washers that hold the cover in position. Tighten the bolts in a crisscross pattern. Tighten the bolts to a torque of 270 ± 40 N·m (200 ± 30 lb ft).

  1. Remove the final drive from Tooling (A). The combined weight of the final drive and final drive sprocket is 272 kg (600 lb).

End By: Install the final drive. Refer to Disassembly and Assembly, "Final Drive - Install" in this manual.

Caterpillar Information System:

3054, 3054B and 3056 Marine Engines Rocker Shaft and Pushrod - Install
2002/02/01 New Special Instruction, REHS1178, "Operating Instructions For The 4P-4788 Electrical Converter Gp And The 4P-4789 Electrical Converter Gp" Is Available {1421}
3054, 3054B and 3056 Marine Engines Rocker Shaft and Pushrod - Remove
3512B Engine for SPF343, SPS343, and SPT343 Pumpers CAT Data Link
C7 and C9 On-Highway Engines Powertrain Data Link Circuit - Test
2002/02/01 A New Systems Operation/Testing And Adjusting Module, RENR5889, "Standby Pump Panel" Is Available {0758}
CPT372 Truck Mounted Pumper Control Panel
2002/05/01 New Starting Motors Used {1453}
318C and 319C Excavators Machine System Specifications Track Roller (Single Flange)
CIPI UNDERCARRIAGE Arrangements: 9Q-5195, 9Q-5197, 9Q-5198, 9Q-5232, 9Q-5504, 9Q-5643, 9Q-5651, 9Q-5727, 9Q-5728, 9Q-5729, 9Q-5730, 9Q-5731, 9Q-5747, 9Q-5876, 180-4029, and 213-3892 Final Drive - Disassemble
G3612 and G3616 Engines Engine Support - Remove and Install
2002/02/01 Correction To Disassembly and Assembly Module, SENR5535-04, "G3612 and G3616 Engines" , "Cylinder Head - Remove" {1100}
Procedure For Sealing Cracks In The Air Plenum That Are On The Top Surface Of The Cylinder Block{1201} Procedure For Sealing Cracks In The Air Plenum That Are On The Top Surface Of The Cylinder Block{1201}
324D and 326D Excavators Machine System Specifications Track Roller Mounting
3408E and 3412E Engines for Caterpillar Built Machines Electric Starting Motor
C12 Marine Engines Electric Starting Motor
C-9 Engine for TK711, TK721, TK722, TK732, TK741, TK751, and TK752 Track Feller Bunchers CID 0001 FMI 11 Cylinder #1 Injector fault
C-9 Engine for TK711, TK721, TK722, TK732, TK741, TK751, and TK752 Track Feller Bunchers CID 0002 FMI 11 Cylinder #2 Injector fault
C-9 Engine for TK711, TK721, TK722, TK732, TK741, TK751, and TK752 Track Feller Bunchers CID 0003 FMI 11 Cylinder #3 Injector fault
C-9 Engine for TK711, TK721, TK722, TK732, TK741, TK751, and TK752 Track Feller Bunchers CID 0004 FMI 11 Cylinder #4 Injector fault
C-9 Engine for TK711, TK721, TK722, TK732, TK741, TK751, and TK752 Track Feller Bunchers CID 0005 FMI 11 Cylinder #5 Injector fault
2002/02/25 Introduction of a New Tappet Plug {1209}
2002/02/01 Introduction of a New Tappet Plug {1209}
C12 Marine Engines Magnetic Pickup
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.