Removal Procedure
Start By:
- Release the hydraulic system pressure. Refer to Disassembly and Assembly, "Hydraulic System Pressure - Release".
Personal injury can result from hydraulic oil pressure and hot oil. Hydraulic oil pressure can remain in the hydraulic system after the engine has been stopped. Serious injury can be caused if this pressure is not released before any service is done on the hydraulic system. Make sure all of the attachments have been lowered, oil is cool before removing any components or lines. Remove the oil filler cap only when the engine is stopped, and the filler cap is cool enough to touch with your bare hand. |
NOTICE |
---|
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop Products Guide" for tools and supplies suitable to collect and contain fluids on Caterpillar products. Dispose of all fluids according to local regulations and mandates. |
Note: Put identification marks on all lines for installation purposes. Plug all lines. This will help to prevent fluid loss and this helps to keep contaminants from entering the system.
Note: The fuel tank and the hydraulic tank are removed for photographic purposes.
- Remove lines (1) and (2) .
Illustration 1 | g00575350 |
Note: The battery cover is removed for photographic purposes.
Illustration 2 | g00575379 |
- Use a suitable lifting strap to support the boom swing cylinder.
Illustration 3 | g00575384 |
- Remove bolt (3) and spacer (4) .
- Remove pin assembly (5) from the boom swing cylinder with a brass punch.
- Remove bolt (6) and spacer (7) .
Illustration 4 | g00575393 |
- Remove pin assembly (8) from the boom swing cylinder.
- Use a suitable lifting strap to remove boom swing cylinder (9) from the upper structure. Weight of the boom swing cylinder is 30 kg (66 lb).
Illustration 5 | g00575395 |
Installation Procedure
Note: Be sure that the pins and the pin bores are thoroughly clean prior to installation of the boom swing cylinder.
- Apply a thin coat of 1P-0808 Multipurpose Grease on the diameter of the pin bores and the pins. Use a suitable lifting strap to support boom swing cylinder (9) into position. Weight of the boom swing cylinder is 30 kg (66 lb).
Illustration 6 | g00575395 |
- Install pin assembly (8), spacer (7), and bolt (6) to the boom swing cylinder. Tighten the bolt.
Illustration 7 | g00575393 |
- Install pin assembly (5), spacer (4), and bolt (3) to the boom swing cylinder. Tighten the bolt.
Illustration 8 | g00575384 |
- Connect lines (2) and (1) to the boom swing cylinder.
Note: The battery cover is removed for photographic purposes.
Illustration 9 | g00575379 |
Note: The fuel tank and the hydraulic tank are removed for photographic purposes.
Illustration 10 | g00575350 |