Cab - Install
Show/hide table
Required Tools | |||
---|---|---|---|
Tool | Part Number | Part Description | Qty |
A | 138-7575 | Link Bracket | 4 |
- Attach Tooling (A) to the top of cab (1), as shown.
Show/hide table
Illustration 2 g00843969 - Attach a suitable hoist and lifting slings to Tooling (A), as shown.
Show/hide table
Illustration 3 g00844012 - Use the hoist in order to install cab (1), as shown. The weight of cab (1) is
1150 kg (2500 lb) .Show/hide tableIllustration 4 g00844008 - Install left rear cab mount (34). Repeat this procedure for the right rear cab mount.
Show/hide table
Illustration 5 g00843989 - Install right front cab mount (31).
- Install bracket assembly (33), two bolts (32) and the washers.
Show/hide table
Illustration 6 g00843981 - Install left front cab mount (30).
Show/hide table
Illustration 7 g00843969 - Remove the hoist and lifting slings from Tooling (A).
Show/hide table
Illustration 8 g00843964 - Remove Tooling (A) from the top of the cab. Repeat this procedure for each of the remaining three corners.
Show/hide table
Illustration 9 g00843961 - Connect ground strap (28).
- Install nut (29) and the washer.
Show/hide table
Illustration 10 g00843957 - Connect parking brake cable (25) to bracket (27).
- Tighten nut (26).
Show/hide table
Illustration 11 g00843951 - Connect parking brake cable (25) to bracket (24).
- Install pin (23) and cotter pin (22).
Show/hide table
Illustration 12 g00843947 - Install service brake (21). Install two nuts (20) and the washers.
Show/hide table
Illustration 13 g00843935 - Install metering pump (19). Install four bolts (18) and the washers.
Show/hide table
Illustration 14 g00843931 - Connect bracket (17) to cab (1).
- Install bolt (16), the washer, and the clip.
Show/hide table
Illustration 15 g00843929 - Connect two brackets (15) to cab (1).
- Install two bolts (14) and the washers.
Show/hide table
Illustration 16 g00843915 - Connect two hoses (13) to the back of the washer fluid bottle.
Show/hide table
Illustration 17 g00843912 Top of Hydraulic Tank - Install wire tie (12).
Show/hide table
Illustration 18 g00843909 Right Side of Cab - Connect five hose assemblies (9).
- Connect hose assembly (10).
- Install three bolts (11), the washers, and the clips.
Show/hide table
Illustration 19 g00843900 - Install pin (8) to the door latch, as shown.
Show/hide table
Illustration 20 g00843890 Back of Cab - Connect six wiring harnesses (6) to the back of cab (1).
- Install bolt (7), the washer, and the clip.
Show/hide table
Illustration 21 g00843888 Back of Cab - Connect hose assembly (4) and (5) to the back of cab (1).
Show/hide table
Illustration 22 g00843883 Back of Cab - Install bolt (2), the washers, and the clip.
- Connect two heater hoses (3) to the back of cab (1).
Show/hide table
Illustration 1 | g00843964 |
End By:
- Separate the steering frame lock. Refer to Disassembly and Assembly, "Steering Frame Lock - Separate and Connect".
Caterpillar Information System:
988G Wheel Loader Power Train Torque Converter and Pump Drive Housing
793C XQ Off-Highway Truck Fan Drive Hydraulic System Suction Fan
69D and 769D Off-Highway Trucks and 771D Quarry Truck Machine Systems Air Tank (Primary) - Remove and Install
69D and 769D Off-Highway Trucks and 771D Quarry Truck Machine Systems Check Valve (Primary Air Tank) - Remove and Install
2001/12/24 A New Fan Drive/Steering Pump Improves the Service Life {4306, 5070}
2001/11/19 Field Replacement of Remanufactured Starting Motors and Remanufactured Alternators {1405, 1453}
CP-433E, CS-423E and CS-433E Vibratory Compactors Machine Systems Smooth Drum Scraper - Remove and Install
69D and 769D Off-Highway Trucks and 771D Quarry Truck Machine Systems Relief Valve (Primary Air Tank) - Remove and Install
PM-465 Cold Planer Track Tension - Check/Adjust
966G Series II Wheel Loader and 972G Series II Wheel Loader Machine Systems Cab - Remove
735 Articulated Truck Power Train Differential and Bevel Gear (Front and Rear) - Disassemble
950G Series II Wheel Loader, 962G Series II Wheel Loader and IT62G Series II Integrated Toolcarrier Engine Supplement Radiator and Fan Group - Remove
2002/04/22 A New Bearing is Available for the Steering Cylinder {4303}
CP-433E, CS-423E and CS-433E Vibratory Compactors Machine Systems Bumper - Remove and Install - CS-423E and CS-433E
MT735, MT745, MT755 and MT765 Agricultural Tractors Engine Supplement Refrigerant Compressor - Remove and Install
3054 and 3056 Industrial and Generator Set Engines Automatic Timing Advance Unit - Test
PM-465 Cold Planer Rotor Coolant Level - Check
550B Wheel Harvester, 560B Wheel Harvester, 570B Wheel Harvester and 580B Wheel Harvester Hydraulic System Piston Motor (Swing Drive)
950G Series II Wheel Loader, 962G Series II Wheel Loader and IT62G Series II Integrated Toolcarrier Engine Supplement Radiator and Fan Group - Install
2001/11/26 An Improved Bracket Improves the Position of the Left Armrest {7307, 7312}
950G Series II Wheel Loader, 962G Series II Wheel Loader and IT62G Series II Integrated Toolcarrier Engine Supplement Engine Compartment Shield - Remove and Install
735 Articulated Truck Power Train Differential and Bevel Gear (Front and Rear) - Assemble
2001/12/03 New Hoist Cylinder Improves the Service Life of the Cylinder and the Seal {5102}
2001/12/10 A New Kit is Available for use on Turbocharged 3054 Engines for C Series and D Series Backhoe Loaders. {1058}