Assembly Procedure
Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts. Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are worn or damaged, use new parts for replacement. All disassembly and all assembly procedures must be performed on a clean work surface and in a clean hydraulic area. Keep cleaned parts covered and protected at all times.
Note: O-rings, gaskets, and seals should always be replaced. A used O-ring may not have the same sealing properties as a new O-ring. Use 1U-6396 O-Ring Assembly Compound during the assembly procedure.
Note: Apply a light film of hydraulic oil to all components before assembly.
Show/hide table
|
|
|
Illustration 1 | g00729579 |
- Install three plugs (20) and the O-ring seals into the valve body.
Show/hide table
|
|
|
Illustration 2 | g00729577 |
- Install plug (16) and the O-ring seal into the valve body. Install plug (17) and air purge valve (18) into the valve body. Install three plugs (19) and the O-ring seals into the valve body.
Show/hide table
|
|
|
Illustration 3 | g00729575 |
- Install four check valves (14) into the valve body. Install plug (15) and the O-ring seal into the valve body.
Show/hide table
|
|
|
Illustration 4 | g00729563 |
- Install pressure reduction valve (13) into the valve body.
Show/hide table
|
|
|
Illustration 5 | g00729558 |
- Install O-ring seal (12) onto the brake port.
Show/hide table
|
|
|
Illustration 6 | g00729555 |
- Install brake port (11) into the valve body.
Show/hide table
|
|
|
Illustration 7 | g00729549 |
- Install O-ring seal (10), O-ring seal (9), and backup ring (8) onto the check valve.
Show/hide table
|
|
|
Illustration 8 | g00729536 |
- Install check valve (7) into the valve body.
Show/hide table
|
|
|
Illustration 9 | g00729488 |
- Install solenoid valve (4) into valve body (6). Install two solenoid valves (5) into the valve body.
Show/hide table
|
|
|
Illustration 10 | g00729479 |
- Install two coils (2) and two coils (3) onto the solenoids. Install three nuts (1) onto the solenoids.
End By:
Install the control valve (trailer and towing hitch) onto the machine.