HH45, HH55, HH65 and HH75 Harvester Heads Tree Harvester Head Caterpillar


Bank Valve (Main Hydraulic) - Assemble

Usage:

HH45 2JZ

Assembly Procedure

Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts. Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are worn or damaged, use new parts for replacement.




    Illustration 1g00643337

  1. Install new O-rings on the valve sections. Place the valve sections between manifold (15) and end plate (14) .

  1. Coat all interior parts with clean hydraulic oil.

  1. Install three through bolts (13) in the main control valve. Install the washers and the nuts.

  1. Install fitting (11) and seal ring (12) into end plate (14) .



    Illustration 2g00453216

  1. Install check valve assembly (9) or relief valve assembly (10) in the side of valve section (6) with the solenoid. Refer to illustrations 3, 4, 5, and 6.



    Illustration 3g00643746

    Locations of check valves for HH45, HH55, and HH65




    Illustration 4g00643747

    Locations of line relief valves for HH45, HH55, and HH65




    Illustration 5g00643736

    Locations of check valves for HH75




    Illustration 6g00643737

    Locations for line relief valves for HH75

  1. Install check valve assembly (9) or relief valve assembly (10) in the side of valve section (6) with the housing.



    Illustration 7g00643412

  1. Install the O-ring into housing (8) .



    Illustration 8g00643413

  1. Install five O-rings into solenoid valve (5) .



    Illustration 9g00452275

  1. Attach spool assembly (7) to the lever in housing (8) .

  1. Install spool assembly (7) in valve section (6) .

  1. Install four screws that attach housing (8) to valve section (6) .

  1. Install four screws that attach solenoid valve (5) to valve section (6) .

  1. Repeat Step 5 through Step 12 for the remaining valve sections in the main control valve.



    Illustration 10g00452259

  1. Place pressure reducing valve (3) in position on the main control valve.

  1. Install two bolts that attach pressure reducing valve (3) to the main control valve.

  1. Place variable pressure reducing valve (2) in position on the main control valve.

  1. Install two bolts and nuts that attach variable pressure reducing valve (2) to the main control valve.

  1. Pressure reducing valve (1) is attached to the main control valve by two screws in adjacent housings (8). Remove the two screws and place Pressure reducing valve (1) in position.

  1. Install the two screws that attach Pressure reducing valve (1) to the main control valve.

End By: Install the main control valve. Refer to Disassembly and Assembly, "Main Control Valve - Install".

Caterpillar Information System:

416D Backhoe Loader Lifting and Tying Down the Machine
416D Backhoe Loader Heating and Air Conditioning Control - If Equipped
416D Backhoe Loader Mirror
2000/08/14 Correction to Disassembly and Assembly, SENR6726 , "Axle Shaft Assemblies" {3260}
2000/08/14 New Step Assembly Eliminates the Bottom Step {7254}
416D Backhoe Loader Cab Door
416D Backhoe Loader Windows
416D Backhoe Loader Alternate Exit
416D Backhoe Loader Service Brake Control
416D Backhoe Loader Accelerator Control
416D Backhoe Loader Transmission Neutral Lock Control
Machine Security System Electronic Control Module (ECM) - Replace
2000/08/28 New Hydraulic Oil Coolers with Copper-Nickel Alloy Tubes Resist Corrosion {1374}
2000/08/28 New Hydraulic Oil Coolers with Copper-Nickel Alloy Tubes Resist Corrosion {1374}
TH62, TH63, TH82, TH83 and TH103 Telehandlers Machine Systems Solenoid Valve - Remove and Install
TH103 Telehandler Power Train Transmission Pressures - Test and Adjust
TH62, TH63, TH82 and TH83 Telehandlers Braking System Brake Cylinder (Master) - Test and Adjust
HH45, HH55, HH65 and HH75 Harvester Heads Tree Harvester Head Bank Valve (Main Hydraulic) - Disassemble
TH62, TH63, TH82, TH83 and TH103 Telehandlers Machine Systems Bank Valve - Install
HH45, HH55, HH65 and HH75 Harvester Heads Tree Harvester Head Bank Valve (Main Hydraulic) - Install
HH45, HH55, HH65 and HH75 Harvester Heads Tree Harvester Head Bank Valve (Main Hydraulic) - Remove
2000/08/07 A New Auger Chain Case Wear Plate Assembly Is Now Available {6631, 6820}
HH45, HH55, HH65 and HH75 Harvester Heads Tree Harvester Head Lubrication Oil Pump (Feed Roller Arm) - Assemble
HH45, HH55, HH65 and HH75 Harvester Heads Tree Harvester Head Lubrication Oil Pump (Feed Roller Arm) - Disassemble
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.