Fuel Tank - Install
- Check all of the O-ring seals and the components for wear or damage. Replace the components, if necessary.
- Lubricate all of the O-ring seals lightly with the lubricant that is being sealed.
Show/hide table
Illustration 1 g00485122 - Attach a suitable lifting device to the fuel tank, as shown. Secure the lifting device to a hoist.
Show/hide table
Illustration 2 g00485123 - Position the fuel tank on the frame assembly. The weight of the fuel tank is
236 kg (520 lb) . - Install U-bolt (13), two nuts (14) and the hard washers. Repeat this procedure for the remaining U-bolt. Do not tighten nuts (14) at this time.
Show/hide table
Illustration 3 g00485085 - Install chassis wire harness (12) through the rear of the fuel tank. Ensure that the electrical connector exits the opposite side of the fuel tank.
- Connect float sender wiring harness (11) to chassis wire harness (12) at the electrical connection.
Show/hide table
Illustration 4 g00485084 - Insert float sender wiring harness (11) and the electrical connector in the fuel tank, as shown.
Show/hide table
Illustration 5 g00485082 - Install two mountings (9). Install the bolt, the hard washer and locknut (10). Tighten all mounting bolts and nuts at this time.
Show/hide table
Illustration 6 g00485081 - Connect two hose assemblies (7) and (6) to the fuel tank.
- Turn ball valve (8) to the ON position.
Show/hide table
Illustration 7 g00485080 - Install two clips (5), the hard washers and two bolts (4).
Show/hide table
Illustration 8 g00485059 - Install a new tie strap (2) that is located behind fuel tank (3) on the inside of the frame assembly, as shown.
Show/hide table
Illustration 9 g00484500 - Apply 5P-3413 Pipe Sealant on pipe plug (1). Install pipe plug (1) to the bottom of the fuel tank.
- Fill the fuel tank. Prime the fuel system. Refer to Operation and Maintenance Manual, "Fuel System - Prime" for the correct priming procedure.
End By:
- Remove the retaining ring and pin (body). Refer to Disassembly and Assembly, "Retaining Ring and Pin (Body) - Remove and Install".
Caterpillar Information System:
D250E Series II, D300E Series II, D350E Series II and D400E Series II Articulated Trucks Power Train Electronic Control System CID 0722 FMI 03 Solenoid Valve (Secondary Brake) Voltage Above Normal - Test
IT14G Integrated Toolcarrier and 914G Wheel Loader Machine Systems Priority Valve - Remove
D250E Series II, D300E Series II, D350E Series II and D400E Series II Articulated Trucks Power Train Electronic Control System CID 0715 FMI 04 Pressure Switch (Retarder Brake) Voltage Below Normal - Test
561M Pipelayer Transmission Hydraulic Control
IT14G Integrated Toolcarrier Attachment Auxiliary Control (Third Lever Function) - Fourth Valve Function
D250E Series II, D300E Series II, D350E Series II and D400E Series II Articulated Trucks Power Train Electronic Control System CID 0715 FMI 03 Pressure Switch (Retarder Brake) Voltage Above Normal - Test
561M Pipelayer Bevel and Transfer Gears
24H Motor Grader Transmission Electronic Control System And Hydraulic Calibrations Caterpillar Monitoring System
69D and 769D Off-Highway Trucks and 771D Quarry Truck Machine Systems Fuel Tank - Remove
D250E Series II, D300E Series II, D350E Series II and D400E Series II Articulated Trucks Power Train Electronic Control System CID 0709 FMI 06 Solenoid Valve (Lockup Clutch) Current Above Normal - Test
IT14G Integrated Toolcarrier and 914G Wheel Loader Machine Systems Metering Pump (Steering) - Install
D250E Series II, D300E Series II, D350E Series II and D400E Series II Articulated Trucks Power Train Electronic Control System CID 0709 FMI 05 Solenoid Valve (Lockup Clutch) Current Below Normal - Test
IT62G Series II Integrated Toolcarrier Quick Coupler Operation
D250E Series II, D300E Series II, D350E Series II and D400E Series II Articulated Trucks Power Train Electronic Control System CID 0722 FMI 05 Solenoid Valve (Secondary Brake) Current Below Normal - Test
IT14G Integrated Toolcarrier and 914G Wheel Loader Machine Systems Priority Valve - Install
IT14G Integrated Toolcarrier and 914G Wheel Loader Machine Systems Secondary Steering Valve - Remove
IT14G Integrated Toolcarrier and 914G Wheel Loader Machine Systems Secondary Steering Valve - Install
IT14G Integrated Toolcarrier and 914G Wheel Loader Machine Systems Hydraulic Oil Cooler - Remove and Install
IT14G Integrated Toolcarrier and 914G Wheel Loader Machine Systems Air Conditioner and Heater Fan Motor - Remove and Install
554 and 574 Forwarders Power Train Piston Motor (Power Train)
IT14G Integrated Toolcarrier and 914G Wheel Loader Machine Systems Bank Valve - Remove
784C and 785C Off-Highway Truck/Tractors Power Train Brake Oil Overheating Troubleshooting
24H Motor Grader Braking System Accumulator Charging Valve
5130, 5130B and 5230 Excavators, 784B, 785B, 785C, 789B, 789C, 793B and 793C Off-Highway Truck/Tractors and 992G, 994 and 994D Wheel Loaders Vital Information Management System (VIMS) Normal Operation