Usage:
8-16B (7MR),
8-16B (2JN),
8-16B (3GL),
8-16B (5PL),
10-20WB (2MN),
10-20WB (3FL),
10-20WB (3KL),
10-20WB (2KN),
10-20B (2LN),
10-20B (2KN),
10-20B (3EL),
10-20B (3HL) Extend-a-Mat Screeds
Description of Change: With the increasing number of mix designs and the introduction of super pave, the current strike off design may not be acceptable.
Adaptable To: The older style deflector can be added to the current production screeds.
Installation Procedure:
1. Remove the current front deflector angles.
2. Fabricate four (4) pieces of 10 gauge bar stock material as outlined in pictures below.
3. Weld bar stock material to the front deflector as shown in pictures.
NOTE: Left Hand (LH) and Right Hand (RH) Deflectors are different.
8-16B Right Hand Deflector
8-16B Left Hand Deflector
10-20B/10-20WB Right Hand Deflector
10-20B/10-20WB Left Hand Deflector