Usage:
17Jul2012 |
After Failure Only | PRODUCT SUPPORT PROGRAM FOR REPLACING/REPAIRING THE BOOM ON CERTAIN E2-SERIES BACKHOE LOADERS |
|
6501 | PS52258 |
NOTE: | This Program can only be administered after a failure occurs. The decision whether to apply the Program is made by the dealer. When reporting the repair, use "PS52258" as the Part Number and "7755" as the Group Number. Use "96" as the Warranty Claim Description Code and use "Z" as the SIMS Description Code. |
NOTE: | The information supplied in this service letter may not be valid after the termination date of this program. Do not perform the work outlined in this Service Letter after the termination date without first contacting your Caterpillar product analyst. |
TERMINATION DATE |
31Jul2014 |
PROBLEM
The weld around the nose casting on the existing boom assembly can crack causing the weld to fail on certain E2-Series Backhoe Loaders. |
AFFECTED PRODUCT
Model | Identification Number |
*******Group 1******* | |
442E | EME00150-00256 |
444E | NBA00150-00382 |
*******Group 2******* | |
422E | MAW00150-01686 |
428E | DPH00150-00687, 689-4141 |
432E | JBA00150-02459 |
434E | SEF00150-00288, 319-556 SJL00150-00398, 426-666 |
PARTS NEEDED
Qty |
Part Number | Description |
*******Group 1******* | ||
1 | 3194505 | BOOM AS |
In order to allow equitable parts availability to all participating dealers, please limit your initial parts order to not exceed 1% of dealership population. This is an initial order recommendation only, and the ultimate responsibility for ordering the total number of parts needed to satisfy the program lies with the dealer. | ||
*******Group 2******* | ||
1 | 3582307 | BOOM AS |
In order to allow equitable parts availability to all participating dealers, please limit your initial parts order to not exceed 1% of dealership population. This is an initial order recommendation only, and the ultimate responsibility for ordering the total number of parts needed to satisfy the program lies with the dealer. |
ACTION REQUIRED
Refer to REHS7704, Special Instruction, "Special Instruction For Repairing The Welded Joint Of The Boom Nose Section On E2 - Series Backhoe Loaders" , for the Rework Procedure. Inspect the boom. The boom assembly will either need to be replaced or repaired. The new boom assemblies also have the improved weld process as per the Special Instruction, this will prevent future failures. Refer to Image1, Image2, and Image3. Image1 is a view of the boom nose casting weld failure. Image2 is a view of the old design single pass cap. Image3 is a view of the new weld design on the nose casting. The double pass cap is a new design that will reduce the risk of poor quality weld. |
Image1 |
Image2 |
Image3 |
SERVICE CLAIM ALLOWANCES
*******Group 1******* | ||||||
0-24 mo |
||||||
25-35 mo |
NOTE: This is a 10.0-hour job for Group 1
If there has been a previous repair, part age/hours will apply. Retain a copy of the previous repair invoice in the dealer's records for audit purposes, and specify repair date and machine hours in the "Additional Comments" section of the warranty claim. |
||||||
If the boom is being repaired instead of being replaced, an additional 20.0 hours salvage labor may be added for completing this work. |
*******Group 2******* | ||||||
0-24 mo |
||||||
25-36 mo |
NOTE: This is a 10.0-hour job for Group 2
If there has been a previous repair, part age/hours will apply. Retain a copy of the previous repair invoice in the dealer's records for audit purposes, and specify repair date and machine hours in the "Additional Comments" section of the warranty claim. |
||||||
If the boom is being repaired instead of being replaced, an additional 20.0 hours salvage labor may be added for completing this work. |
PARTS DISPOSITION
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling. |