Speed/Timing Sensor - Remove and Install
- Disconnect harness assembly (1) and remove speed/timing sensor (2).
Show/hide table
Illustration 1 | g03836878 |
- Install speed/timing sensor (2) in the reverse order of removal.
- Tighten speed/timing sensor (2) to a torque of
37 ± 4 N·m (27 ± 3 lb ft) .
- Tighten speed/timing sensor (2) to a torque of
Caterpillar Information System:
C9.3 Marine Engine Fuel Pressure Sensor - Remove and Install
C280-08 Tier 4 Engine Air Inlet Shutoff - Remove and Install
C280-08 Tier 4 Engine Turbocharger - Remove and Install
C280-08 Tier 4 Engine Aftercooler - Remove and Install
C280-08 Tier 4 Engine Exhaust Manifold - Remove and Install
C9.3 Marine Engine Engine Oil Pressure Sensor - Remove and Install
3516E Generator Set Engine Sensor Calibration Required - Test
C9.3 Marine Engine Coolant Temperature Sensor - Remove and Install
G3606 and G3608 Engines Aftercooler - Disassemble
3512C and 3516C Industrial Engines Air Lines
C280 Marine Engines Circuit Breaker - Test
3512C and 3516C Industrial Engines Engine Oil Filter
C3.3B and C3.8 Engines for Caterpillar Built Machines Relay - Test - ECM Main Relay
C9.3 Marine Engine Inlet Manifold Temperature Sensor - Remove and Install
C9.3 Marine Engine Inlet Manifold Pressure Sensor - Remove and Install
C9.3 Marine Engine Belt Tensioner - Remove and Install
C9.3 Marine Engine Engine Control Module - Remove and Install
3512C and 3516C Industrial Engines Air Lines
3512C and 3516C Industrial Engines Fuel Injection Lines
3512C and 3516C Industrial Engines Fuel Injection Lines
3512C and 3516C Industrial Engines Water Lines
PM820, PM822, and PM825 Cold Planer Machine Interlocks
C9.3 Marine Engine Electric Starting Motor - Remove and Install - 24V Electric
3406E Engine Cylinder Head - Install