Fuel Injection Pump - Install
Show/hide table
Required Tools | |||
Tool | Part Number | Part Description | Qty |
A | 267-2647 | Stop Plug | 1 |
B | 9S-4180 | Plug | 1 |
C | 294-3031 | Special Bolt | 1 |
D | 364-0628 | Special Plug | 1 |
228-7089 | O-Ring Seal | 1 |
Show/hide table
NOTICE |
---|
Keep all parts clean from contaminants. Contaminants may cause rapid wear and shortened component life. |
- Ensure that the No. 1 cylinder is at the top center compression stroke. Refer to Testing and Adjusting, "Finding Top Center Position for No. 1 Piston".
Show/hide table
Illustration 1 g01352571 Note: Ensure that Tooling (A) or Tooling (C) is installed prior to installation of the fuel injection pump. Use Tooling (A) for the fuel injection pumps with timing pin on the bottom of the fuel injection pump. Use Tooling (C) for the fuel injection pumps with timing pin on the side of the fuel injection pump.
- Align fuel injection pump (11) in the correct orientation relative to the front housing. Connect hose assembly (7).
- Install fuel injection pump (11). Move fuel injection pump (11) straight into the front housing to properly engage the gear. Install bolts (10).
- Install the support assembly and nuts (9). Connect harness assemblies (8).
Note: For fuel injection pumps with the timing pin on the bottom of the fuel injection pump, proceed to Step 5. After completing Step 5, proceed to Step 7.
Note: For fuel injection pumps with the timing pin on the bottom of the fuel injection pump, proceed to Step 6.
Show/hide tableIllustration 2 g01365142 - Remove Tooling (A) and install Tooling (B). Tighten Tooling (B) to a torque of
4.5 ± 0.5 N·m (40.0 ± 4.0 lb in) .Show/hide tableIllustration 3 g06003747 Show/hide tableIllustration 4 g06003883 - Remove Tooling (C) and install Tooling (D). Tighten Tooling (D) to a torque of
9 ± 1 N·m (80 ± 9 lb in) . - Install bolts (2). Connect tube assembly (6) and tube assembly (5).
- Install tube assembly (4), tube assembly (3), and tube assembly (1).
End By:
- Install the air compressor. Refer to Disassembly and Assembly, "Air Compressor - Remove and Install".
Caterpillar Information System:
325D and 329D Excavators and 325D Material Handler Machine System Specifications Control Valve (Auxiliary) - Medium Pressure
C13 Engine Pistons and Connecting Rods - Install
C13 Engine Pistons and Connecting Rods - Remove
325D and 329D Excavators and 325D Material Handler Machine System Specifications Solenoid Valve (Work Tool, 4-Function)
3500B Industrial Engines with the ADEM 3 Electronic Control Module Diagnostic Code List
C9 On-highway Engine Turbocharger Oil Lines
C13 Engine Inlet and Exhaust Valve Springs - Remove and Install
C7 On-Highway Engine Lifter Group - Remove and Install
C9 On-highway Engine Engine Oil Pan
C11 and C13 Petroleum Engines Rocker Arm - Assemble
C11 and C13 Petroleum Engines Rocker Arm - Disassemble
725C, 725C2, 730C, 730C2 and 730C, 730C2 EJECTOR Articulated Truck Systems Gear Pump (Transmission)
UPS 120, UPS 150, UPS 250, UPS 300, UPS 301, UPS 500, UPS 600, UPS 750 and UPS 900 Uninterruptible Power Supplies DC Bus Voltage - Calibrate
TH31-C9I, TH31-C9P, TH31-C9T, TH35-C11I, TH35-C13I, TH35-C13T, TH35-C15I and TH35-C15T Petroleum Power Train Packages and TH31-E61 and TH35-E81 Petroleum Transmissions Power Train Electronic Control System Programmable Parameters
C7 PETROLEUM Petroleum Engine Unit Injector Hydraulic Pump - Remove
C175-16 Locomotive Engine Engine Design
C7 PETROLEUM Petroleum Engine Unit Injector Hydraulic Pump - Install
C7 On-Highway Engine Water Pump - Remove
C7 On-Highway Engine Water Pump - Install
C7 On-Highway Engine Vibration Damper and Pulley - Remove and Install
C7 Industrial Engines Camshaft Bearings - Remove
C7 Industrial Engines Pistons and Connecting Rods - Install
C7 Industrial Engines Housing (Front) - Install
C175-16 and C175-20 Generator Set Engines Fuel Filter (Primary)