C7 On-Highway Engine Caterpillar


Lifter Group - Remove and Install

Usage:

C7 C7S

Removal Procedure

Start By:

  1. Remove the rocker shaft and pushrods. Refer to Disassembly and Assembly, "Rocker Shaft and Pushrod - Remove".

  2. Remove the fuel manifold. Refer to Disassembly and Assembly, "Fuel Control Manidfold (ARD) - Remove".

  3. Remove the electronic control module. Refer to Disassembly and Assembly, "Electronic Control Module - Remove and Install".


    NOTICE

    Keep all parts clean from contaminants.

    Contaminants may cause rapid wear and shortened component life.




    Illustration 1g01262653

  1. Remove bolts (2) and (4). Remove clips (3) and (5). Remove tube assemblies (1).


    Illustration 2g01262654

  2. Disconnect harness assemblies (6) and (7) from the speed sensors.


    Illustration 3g01262655

  3. Remove bolts (8). Remove lifter group (9).


    Illustration 4g01262656

  4. Place identification marks on each lifter in order to identify the proper location on the side cover for installation.

    Note: Ensure that the sleeves of the side covers remain in the side covers.

  5. Remove bolts (10) and the dowels that hold lifter arms (11) and lifter shaft (12) to each side cover. Remove gasket (13).

Installation Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
1U-8846  Gasket Sealant 
9S-3263  Thread Lock Compound 


    NOTICE

    Keep all parts clean from contaminants.

    Contaminants may cause rapid wear and shortened component life.




    Illustration 5g01262656

  1. Apply Tooling (A) to the gasket surface of the side cover. Install gasket (13).

  2. Install lifter arms (11) on lifter shaft (12).

  3. Position lifter shaft (12) over the dowels on the side cover. Ensure that the oil holes in the lifter shaft are facing the side cover. Apply Tooling (B) on the threads of bolts (10) that hold lifter shaft (12) to the side cover. Install bolts (10). Tighten bolts (10) to a torque of 13 ± 3 N·m (115 ± 27 lb in). Tighten the two center bolts. Then tighten the end bolts.

  4. Lubricate the lifters with clean engine oil.


    Illustration 6g01262655


    Illustration 7g01160766

  5. Install lifter group (9). Install bolts (8). Tighten bolts (8) in a numerical sequence. Tighten bolts (8) to a torque of 28 ± 7 N·m (21 ± 5 lb ft).


    Illustration 8g01262654

  6. Connect harness assemblies (6) and (7) to the speed sensors.


    Illustration 9g01262653

  7. Install tube assemblies (1). Install clips (3) and (5). Install bolts (2) and (4).

End By:

  1. Install the electronic control module. Refer to Disassembly and Assembly, "Electronic Control Module - Remove and Install".

  2. Install the fuel manifold. Refer to Disassembly and Assembly, "Fuel Control Manidfold (ARD) - Install".

  3. Install the rocker shaft and pushrods. Refer to Disassembly and Assembly, "Rocker Shaft and Pushrod - Install".

Caterpillar Information System:

C9 On-highway Engine Engine Oil Pan
C11 and C13 Petroleum Engines Rocker Arm - Assemble
C11 and C13 Petroleum Engines Rocker Arm - Disassemble
725C, 725C2, 730C, 730C2 and 730C, 730C2 EJECTOR Articulated Truck Systems Gear Pump (Transmission)
3500B Industrial Engines with the ADEM 3 Electronic Control Module Electrical Connectors and Functions
C7 On-highway Engine Air Lines - Aftertreatment Regeneration Device
C7 On-Highway Engine Fuel Injection Pump - Remove
CX31 On-Highway Transmission Oil Filter (Transmission)
C7 and C9 On-highway Engines Emissions Certification Film
CX28 On-Highway Transmission Drive Plate
C7 PETROLEUM Petroleum Engine Water Temperature Regulator - Remove and Install
C7 On-Highway Engine Rocker Shaft and Pushrod - Install
C13 Engine Inlet and Exhaust Valve Springs - Remove and Install
C9 On-highway Engine Turbocharger Oil Lines
3500B Industrial Engines with the ADEM 3 Electronic Control Module Diagnostic Code List
325D and 329D Excavators and 325D Material Handler Machine System Specifications Solenoid Valve (Work Tool, 4-Function)
C13 Engine Pistons and Connecting Rods - Remove
C13 Engine Pistons and Connecting Rods - Install
325D and 329D Excavators and 325D Material Handler Machine System Specifications Control Valve (Auxiliary) - Medium Pressure
C7 On-Highway Engine Fuel Injection Pump - Install
UPS 120, UPS 150, UPS 250, UPS 300, UPS 301, UPS 500, UPS 600, UPS 750 and UPS 900 Uninterruptible Power Supplies DC Bus Voltage - Calibrate
TH31-C9I, TH31-C9P, TH31-C9T, TH35-C11I, TH35-C13I, TH35-C13T, TH35-C15I and TH35-C15T Petroleum Power Train Packages and TH31-E61 and TH35-E81 Petroleum Transmissions Power Train Electronic Control System Programmable Parameters
C7 PETROLEUM Petroleum Engine Unit Injector Hydraulic Pump - Remove
C175-16 Locomotive Engine Engine Design
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.