Removal Procedure
Show/hide table
Table 1
Required Tools     |
Tool     |
Part Number     |
Part Description     |
Qty     |
A     |
135-7575     |
Link Bracket     |
2     |
Start By:
- Connect the steering frame lock. Refer to Disassembly and Assembly, "Steering Frame Lock - Separate and Connect" for the machine that is being serviced.
- Remove the sweeps. Refer to Disassembly and Assembly, "Sweeps - Remove and Install" for the machine that is being serviced.
- Remove the muffler. Refer to Disassembly and Assembly, "Muffler - Remove and Install" for the machine that is being serviced.
- Remove the refrigerant condenser. Refer to Disassembly and Assembly, "Referigerant Condenser - Remove and Install" for the machine that is being serviced. Removal of the inlet line and removal of the outlet line are not necessary.
Show/hide table
|
NOTICE |
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop Products Guide" for tools and supplies suitable to collect and contain fluids on Caterpillar products. Dispose of all fluids according to local regulations and mandates. |
|
Show/hide table
|
Hot oil and hot components can cause personal injury. Do not allow hot oil or hot components to contact skin. At operating temperature, the engine coolant is hot and under pressure. Steam can cause personal injury. Check the coolant level only after the engine has been stopped and the cooling system pressure cap is cool enough to touch with your bare hand. Remove the cooling system pressure cap slowly to relieve pressure. Cooling system conditioner contains alkali. Avoid contact with the skin and eyes to prevent personal injury. |
|
Note: Put identification marks on all lines, on all hoses, on all wires, and on all tubes for installation purposes. Plug all lines, hoses, and tubes. This helps to prevent fluid loss and this helps to keep contaminants from entering the system.
- The radiator assembly is located at the front of the machine.
- Drain the cooling system. Refer to the Operation and Maintenance Manual, SEBU7140, "Cooling System Coolant (DEAC) - Change" for the correct procedure. The capacity of the cooling system is 56 L (14.8 US gal).
Show/hide table
|
|
|
Illustration 1 | g00583775 |
- Remove two bolts (2) and plate (1). Repeat this step for the remaining plate on the other side of the machine.
Show/hide table
|
|
|
Illustration 2 | g00583863 |
- Remove eight bolts (3) and hood (4). Use two persons to remove hood (4). The weight of hood (4) is 39 kg (85 lb).
Show/hide table
|
|
|
Illustration 3 | g00583893 |
- Loosen two clamps (5) and disconnect hose assembly (6) .
- Remove baffle (8), tube (7), and hose assembly (6) as one unit. Use two persons to remove baffle (8). The weight of baffle (8) is 20 kg (45 lb).
Show/hide table
|
|
|
Illustration 4 | g00583896 |
- Remove four bolts (9) and eight bolts (10) .
- Remove two-piece guard assembly (11) .
Show/hide table
|
|
|
Illustration 5 | g00584137 |
- Remove six nuts (13) and fan spider assembly (12). Use two persons to remove fan spider assembly (12). The weight of fan spider assembly (12) is 27 kg (60 lb).
Show/hide table
|
|
|
Illustration 6 | g00584213 |
- Cut cable straps (16) that secure hose (17) .
- Remove sixteen bolts (14) and shroud assembly (15). Use two persons to remove shroud assembly (15). The weight of shroud assembly (15) is 20 kg (45 lb).
Show/hide table
|
|
|
Illustration 7 | g00584280 |
- Loosen two clamps (18) and remove tube (19) .
- Disconnect two transmission oil cooler lines (20) .
Show/hide table
|
|
|
Illustration 8 | g00584310 |
- Loosen clamp (21) and remove hose (22) .
Show/hide table
|
|
|
Illustration 9 | g00584370 |
- Install Tooling (A) on the radiator top tank assembly. Attach a hoist and suitable lifting slings, as shown.
- Remove two bolts (24) and open radiator guard (23) .
Show/hide table
|
|
|
Illustration 10 | g00584381 |
- Remove four bolts (26). Use the hoist to remove radiator (25). The weight of radiator (25) is 208 kg (460 lb).
Installation Procedure
Show/hide table
Table 2
Required Tools     |
Tool     |
Part Number     |
Part Description     |
Qty     |
A     |
135-7575     |
Link Bracket     |
2     |
Show/hide table
|
|
|
Illustration 11 | g00584381 |
Show/hide table
|
|
|
Illustration 12 | g00584370 |
- Install tooling (A) on the radiator top tank assembly. Attach a hoist and suitable lifting slings, as shown.
- Use the hoist to install radiator (25). Install four bolts (26). The weight of radiator (25) is 208 kg (460 lb).
- Close radiator guard (23) and install two bolts (24) .
Show/hide table
|
|
|
Illustration 13 | g00584310 |
- Install hose (22) and tighten clamp (21) .
Show/hide table
|
|
|
Illustration 14 | g00584280 |
- Connect two transmission oil cooler lines (20) .
- Install tube (19) and tighten two clamps (18) .
Show/hide table
|
|
|
Illustration 15 | g00584213 |
- Install shroud assembly (15) and sixteen bolts (14). Use two persons to install shroud assembly (15). The weight of shroud assembly (15) is 20 kg (45 lb).
- Install cable straps (16) that secure hose (17) .
Show/hide table
|
|
|
Illustration 16 | g00584137 |
- Install fan spider assembly (12) and six nuts (13). Use two persons to install fan spider assembly (12). The weight of fan spider assembly (12) is 27 kg (60 lb).
Show/hide table
|
|
|
Illustration 17 | g00583896 |
- Install two-piece guard assembly (11) .
- Install eight bolts (10) and four bolts (9) .
Show/hide table
|
|
|
Illustration 18 | g00583893 |
- Install baffle (8), tube (7), and hose assembly (6) as one unit. Use two persons to install baffle (8). The weight of baffle (8) is 20 kg (45 lb).
- Connect hose assembly (6) on both ends and tighten clamps (5) .
Show/hide table
|
|
|
Illustration 19 | g00584501 |
- Install hood (4). Use two persons to install hood (4). The weight of hood (4) is 39 kg (85 lb).
- Install eight bolts (3). Three bolts (27) secure baffle to the hood (4) .
Show/hide table
|
|
|
Illustration 20 | g00583775 |
- Install plate (1) and two bolts (2). Repeat this step for the remaining plate on the other side of the machine.
- Fill the cooling system. Refer to the Operation and Maintenance Manual, SEBU7140, "Cooling System Coolant (DEAC) - Change" for the correct procedure. The capacity of the cooling system is 56 L (14.8 US gal).
End By:
- Install the refrigerant condenser. Refer to Disassembly and Assembly, "Referigerant Condenser - Remove and Install" for the machine that is being serviced.
- Install the muffler. Refer to Disassembly and Assembly, "Muffler - Remove and Install" for the machine that is being serviced.
- Install the sweeps. Refer to Disassembly and Assembly, "Sweeps - Remove and Install" for the machine that is being serviced.
- Separate the steering frame lock. Refer to Disassembly and Assembly, "Steering Frame Lock - Separate and Connect" for the machine that is being serviced.