C9 Marine Engines and C9 Marine Generator Sets Caterpillar


Cylinder Liner - Install

Usage:

C9 C9A

Installation Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
2P-8260  Cylinder Liner Installation Group 
5P-3975  Rubber Lubricant 


NOTICE

Keep all parts clean from contaminants.

Contaminants may cause rapid wear and shortened component life.


    Note: Refer to the Testing and Adjusting, "Cylinder Liner Projection" topic in order to check the cylinder liner projection.



    Illustration 1g01143829

  1. Apply Tooling (C) to the new liner seal (2). Install liner seal (2) in the machined groove on cylinder liner (1).

  2. Position cylinder liner (1) in the cylinder block. Use Tooling (B) to press the cylinder liner in place.

End By:

  1. Install the pistons and connecting rods. Refer to Disassembly and Assembly, "Piston and Connecting Rods - Install".
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.