AP1055F Asphalt Paver Machine Systems Caterpillar


Auger Conveyor - Calibrate

Usage:

AP-1055F RLM

------ WARNING! ------

Diesel engine exhaust contains products of combustion which may cause personal injury.

Always start and operate the engine in a well ventilated area, and, if in an enclosed area, vent the exhaust to the outside.


------ WARNING! ------

Personal injury can result from rotating and moving parts. Stay clear of all rotating and moving parts.

Never attempt adjustments while the machine is moving or the engine is running unless otherwise specified.

The machine must be parked on a level surface and the engine stopped.

Attach a "Do Not Operate" or similar warning tag to the start switch and controls before servicing, repairing, or making adjustments to the machine.


------ WARNING! ------

Personal injury or death can result from sudden machine movement.

Sudden movement of the machine can cause injury to persons on or near the machine.

To prevent injury or death, make sure that the area around the machine is clear of personnel and obstructions before operating the machine.


------ WARNING! ------

Injury to personnel can result if they are not in the operator's view. Allow only essential personnel near the machine, and make sure the personnel are in the operator's view when testing, to prevent injury. Make sure checks are done in an open area.


------ WARNING! ------

To prevent injury or death, never work under a machine while a test is being performed.


Specifications

Table 1
Machine Test Parameters 
Date  Product or Component SN 
Measurement Location  Measurement  Actual 
Engine High Idle Test Speed  2200 rpm   
Hydraulic oil temperature for test  43 ± 6 °C (110 ± 10 °F)   

Table 2
Test Specifications 
Date  Product or Component SN 
Location  Specification  Actual 
The auger shaft speed.  150 ± 5 rpm   

Introduction

This procedure outlines the steps used to calibrate the speed settings for the right auger conveyor or the left auger conveyor. To check the auger conveyor speed, refer to AP1055F Asphalt Paver Machine Systems Testing and Adjusting, "Conveyor Speed (Auger)-Check".

Note: Use this procedure to set the initial current for the auger solenoids and to calibrate the material height dials. The paver must have either paddle or sonic material height sensors installed for automatic operation of the auger to function. In order to calibrate the paddle sensors, start by preparing the machine for calibration. Refer to, "Calibration Preparation". If the left auger is to be calibrated, refer to "Calibration Procedure", "Left Auger Conveyor". If the right auger is to be calibrated, refer to "Calibration Procedure", "Right Auger Conveyor".

Required Tools

Table 3
Required Tools 
Tool  Item  Qty  Part No  Description 
  351-8635  Tachometer Kit 

Calibration Preparation

  1. Drive the machine to a smooth, horizontal surface.


    Illustration 1g03667723

  2. Move propel lever (4) to the NEUTRAL position.

  3. Press parking brake switch (5) in order to change the status of the parking brake to "engaged". When the parking brake status is "engaged", LED (2) next to the parking brake switch will be illuminated.

  4. Use travel mode switch (3) to select the PAVE mode. When the travel mode switch is set to PAVE mode, an LED next to PAVE symbol (1) will be illuminated.


    Illustration 2g03667730

  5. Press the up arrow on screed raise/lower switch (6) to lift the screed. Completely raise the screed.


    Illustration 3g03661783

  6. Engage screed service lock mechanism (7) on both sides of the machine.


    Illustration 4g03668199

  7. Use screed float switch (8) to place the screed in the FLOAT position. When the screed is in the FLOAT position, an LED next to the screed float switch will illuminate. Allow the tow arms to rest on screed service lock mechanism (7).


    Illustration 5g03668667

  8. Press the extend arrow on right screed extend switch (10) to place the right screed extender in the EXTEND position. Release the switch when the right screed extender is fully extended.

  9. Press the extend arrow on left screed extend switch (9) to place the left screed extender in the EXTEND position. Release the switch when the left screed extender is fully extended.


    Illustration 6g03668677

  10. Press the up arrow on auger height switch (11) to place the auger in the RAISE position. Fully raise the augers.


    Illustration 7g03668679

  11. Press the down arrow on throttle control switch (13) once in order to operate the engine in low idle.


    Illustration 8g03483124

  12. Shut off the engine. Either place machine power switch (14) in the OFF position or press and hold push to start switch (12) for 3 seconds. An LED next to the push to start switch will flash when the engine is in shutdown mode.

    Note: The engine may run for several minutes when placed in the shutdown mode.

  13. If the engine was shut down using the push to start switch (12), move machine power switch (14) to the OFF position.


    Illustration 9g03483205

  14. Install a small piece of reflective tape (15) from Tool (A) on left auger shaft (16).

    Note: If the right auger is being tested, place a small piece of reflective tape (15) on the right auger shaft (not shown).

Calibration Procedure

  1. Move machine power switch (14) to the ON position.

  2. Press push to start switch (12) for 2 seconds in order to start the engine. An LED next to the push to start switch will flash when the engine is in start mode. When the engine has started, the LED will remain illuminated.

    Note: Only one attempt to start the engine is allowed per key cycle. A new key cycle will need to be done in order to restart the process.

  3. Operate the engine at low idle for a few minutes.

  4. Press the up arrow on throttle control switch (13) in order to place the engine in high idle. The engine speed should increase to 2200 rpm.


    Illustration 10g03668688

  5. Monitor the hydraulic oil temperature on operator display (17). Operate the machine until the oil temperature reaches 43 ± 5.6 °C (110 ± 10 °F).

Left Auger Conveyor



    Illustration 11g03656727

  1. Touch Service icon (18).


    Illustration 12g03656736

  2. Select "Calibrations" (19).

  3. Touch "OK" icon (20).


    Illustration 13g03656741

  4. Select "Feeder Solenoid" (21).

  5. Touch "OK" icon (20).


    Illustration 14g03656755

  6. Select "Left Auger" (22).

  7. Touch "OK" icon (20).


    Illustration 15g03656759

  8. Read the on screen warnings (23). Use down arrow (24) in order to scroll through the warnings.


    Illustration 16g03656781

  9. After fulfilling the requirements of on screen warnings (23), touch "OK" icon (20).


    Illustration 17g03656790

  10. Read the on screen notices (25). Touch "OK" icon (20).


    Illustration 18g03656795

  11. Follow set up instructions (26). Use down arrow (24) in order to scroll through the machine setup.

    1. Press the up arrow on throttle control switch (13) in order to place the engine in high idle. The engine speed should increase to 2200 rpm.

    2. Press parking brake switch (5) in order to change the status of the parking brake to "engaged". When the parking brake status is "engaged", LED (2) next to the parking brake switch will be illuminated.


      Illustration 19g03668695

    3. Press left auger auto switch (27) in order to engage the auto mode.

      When the left auger auto switch is in the auto mode, an LED next to auto switch will be illuminated.

    4. Use travel mode switch (3) to select the PAVE mode. When the travel mode switch is set to PAVE mode, an LED next to PAVE symbol (1) will be illuminated.


      Illustration 20g03668698

    5. Actuate trigger (28) and place propel lever (4) in the FORWARD position.


    Illustration 21g03656798

  12. After fulfilling the requirements of setup instructions (26), touch (Next) icon (29).


    Illustration 22g03656842


    Illustration 23g03656846

  13. Press function selection button (32), on the screed, in order to select material height (31). An LED light next to material height will be illuminated. Slowly rotate multi function dial (30) until the auger is barely turning.

  14. Touch (Next) icon (29).


    Illustration 24g03656847

  15. Slowly rotate multi function dial (30) until the auger is until the auger speed is no longer increasing. Touch (Next) icon (29).


    Illustration 25g03656848

  16. The display should now read "Calibration Successful" (33). Touch "OK" icon (20).

  17. Press function selection button (32), on the screed, in order to select material height (31). An LED light next to material height will be illuminated. Rotate multi function dial (30) clockwise until the speed of the left auger shaft reaches 150 ± 10 rpm. Use Tool (A) to measure the speed.


    Illustration 26g03657002

  18. Touch home icon (34) to exit the calibration screen.

  19. Move propel lever (4) to the NEUTRAL position.

  20. Press left auger auto switch (27) to place the left auger in the OFF position.

  21. Press the down arrow on throttle control switch (13) once in order to operate the engine in low idle.

  22. Shut off the engine. Press and hold push to start switch (12) for 3 seconds. An LED next to the push to start switch will flash when the engine is in shutdown mode.

    Note: The engine may run for several minutes when placed in the shutdown mode.

  23. After the engine has shut down, move machine power switch (14) to the OFF position.

Right Auger Conveyor



    Illustration 27g03656727

  1. Touch Service icon (18).


    Illustration 28g03656736

  2. Select "Calibrations" (19).

  3. Touch "OK" icon (20).


    Illustration 29g03656741

  4. Select "Feeder Solenoid" (21).

  5. Touch "OK" icon (20).


    Illustration 30g03657058

  6. Select "Right Auger" (35).

  7. Touch "OK" icon (20).


    Illustration 31g03657069

  8. Read the on screen warnings (36). Use down arrow (24) in order to scroll through the warnings.


    Illustration 32g03657072

  9. After fulfilling the requirements of on screen warnings (36), touch "OK" icon (20).


    Illustration 33g03657079

  10. Read the on screen notices (34). Touch "OK" icon (20).


    Illustration 34g03657084

  11. Follow set up instructions (38). Use down arrow (24) in order to scroll through the machine setup.

    1. Press the up arrow on throttle control switch (13) in order to place the engine in high idle. The engine speed should increase to 2200 rpm.

    2. Press parking brake switch (5) in order to change the status of the parking brake to "engaged". When the parking brake status is "engaged", LED (2) next to the parking brake switch will be illuminated.


      Illustration 35g03668699

    3. Press right auger auto switch (39) in order to engage the auto mode.

      Note: When the right auger auto mode switch is in the auto mode, an LED next to the auto switch will be illuminated.

    4. Use travel mode switch (3) to select the PAVE mode. When the travel mode switch is set to PAVE mode, an LED next to PAVE symbol (1) will be illuminated.


      Illustration 36g03668698

    5. Actuate trigger (28) and place propel lever (4) in the FORWARD position.


    Illustration 37g03657091

  12. After fulfilling the requirements of setup instructions (38), touch "Next" icon (26).


    Illustration 38g03656842


    Illustration 39g03657095

  13. Press function selection button (32), on the screed, in order to select material height (31). An LED light next to material height will be illuminated. Slowly rotate multi function dial (30) until the auger is barely turning.

  14. Touch "Next" icon (26).


    Illustration 40g03657102

  15. Slowly rotate multi function dial (30) until the auger is until the auger speed is no longer increasing. Touch "Next" icon (26).


    Illustration 41g03657137

  16. The display should now read "Calibration Successful" (40). Touch "OK" icon (20).

  17. Press function selection button (29), on the screed, in order to select material height (28). An LED light next to material height will be illuminated. Rotate multi function dial (27) clockwise until the speed of the left auger shaft reaches 150 ± 10 rpm. Use Tool (A) to measure the speed.


    Illustration 42g03657002

  18. Touch home icon (34) to exit the calibration screen.

  19. Move propel lever (4) to the NEUTRAL position.

  20. Press right auger auto switch (39) to place the left auger in the OFF position.

  21. Press the down arrow on throttle control switch (13) once in order to operate the engine in low idle.

  22. Shut off the engine. Press and hold push to start switch (12) for 3 seconds. An LED next to the push to start switch will flash when the engine is in shutdown mode.

    Note: The engine may run for several minutes when placed in the shutdown mode.

  23. After the engine has shut down, move machine power switch (14) to the OFF position.

Caterpillar Information System:

C13 Engine for Caterpillar Built Machines Pressure Sensor (NRS Absolute) - Remove and Install
794 AC Off-Highway Truck Systems Slack Adjuster
794 AC Off-Highway Truck Systems Brake Control Valve - Dual Brake Valve
794 AC Off-Highway Truck Systems Service and Parking Brake
794 AC Off-Highway Truck Systems Foot Brake Control
794 AC Off-Highway Truck Systems Control Manifold (Brake)
AP1055F Asphalt Paver Machine Systems Fan Speed (Ventilation) - Test
C13 Engine for Caterpillar Built Machines Pressure Sensor (NRS Differential) - Remove and Install
980M Tier 3, 982M Tier 3 and 980L Tier 3 Wheel Loader Power Train Torque Converter to Transmission, Output Transfer Gears - Connect
980M Tier 3, 982M Tier 3 and 980L Tier 3 Wheel Loader Power Train Transmission to Output Transfer Gears - Connect
Rework Procedure to Update AP800D Asphalt Pavers with 25KW Generator Group {4450} Rework Procedure to Update AP800D Asphalt Pavers with 25KW Generator Group {4450}
424B Backhoe Loader Machine Systems Tilt Cylinder - Remove and Install
794 AC Off-Highway Truck Systems Brake Control - Service Brake
794 AC Off-Highway Truck Systems Brake Accumulator
AP1055F Asphalt Paver Machine Systems Drag Conveyor - Calibrate
826K Landfill Compactor, 825K Soil Compactor and 824K Wheel Dozer Power Train Ladder and Walkway - Remove and Install
AP1055F Asphalt Paver Machine Systems Conveyor Drive Chain (Auger) - Check and Adjust
730C2 and 725C2 Articulated Truck Power Train Transmission - Remove and Install
980M and 982M Wheel Loaders Power Train, Steering, Braking, Hydraulic, and Machine Systems Pilot Pressure - Test and Adjust
980M and 982M Wheel Loaders Diesel Exhaust Fluid Filter - Replace
Cat® Command For Hauling MID 039 - CID 3731 - FMI 03
Cat® Command For Hauling MID 039 - CID 3731 - FMI 05
Cat® Command For Hauling MID 039 - CID 3731 - FMI 06
Cat® Command For Hauling MID 039 - CID 3732 - FMI 03
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.