Required Tools | |||
Tool | Part Number | Description | Quantity |
A | 1U-9200 | Lever Puller Hoist | 1 |
B | 141-1785 | Receiving Sleeve | 1 |
C | 6V-0113 | Double Acting Cylinder | 1 |
D | 9U-6809 | Nut | 1 |
E | 9U-6811 | Puller Stud | 1 |
ZZ | 9U-7073 | Tapered Cap/Plug | 24 |
6V-9513 | Plug | 1 | |
6V-9834 | Cap As | 1 |
Start By:
- Release the hydraulic system pressure. Refer to Disassembly and Assembly, "System Pressure - Release".
- Remove the stick. Refer to Disassembly and Assembly, "Stick - Remove".
Note: SERVICE DATA: TOOLING (ZZ) WILL NOT BE IDENTIFIED IN PHOTOGRAPHS IN THE REMOVAL OR THE INSTALLATION. THIS TOOLING IS SHOWN IN ORDER TO ASSIST THE EXPERIENCED SERVICEMAN.
NOTICE |
---|
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting, and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Refer to Special Publication, NENG2500, "Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Cat® products. Dispose of all fluids according to local regulations and mandates. |
Note: Put identification marks on all lines, on all hoses, on all wires, and on all tubes for installation purposes. Plug all lines, hoses, and tubes. This helps to prevent fluid loss and this helps to keep contaminants from entering the system.
- Remove bolts (1) and remove belt (2). Remove bolts (3) and remove plate (4).
Show/hide table
Illustration 2 g01025524 View of area behind belt (2) that was removed in the previous step - Remove clips (5) and disconnect four hose assemblies (6) that supply grease to the boom.
Show/hide table
Illustration 3 g01025638 - Disconnect hose assembly (7) from the filter. Disconnect hose assemblies (8) from the main hydraulic control valve.
Show/hide table
Illustration 4 g01025612 - Disconnect harness assembly (12). Remove bolts (10) that retain bracket (11). Remove bracket (11) and position hose assembly (9) out of the way.
Show/hide table
Illustration 5 g01025753 - Attach a suitable lifting device to boom (13), as shown. Support the boom by using the lifting device.
Show/hide table
Illustration 6 g01025828 - Attach a suitable lifting device by using Tooling (A) to the boom cylinder (14), as shown. Slightly raise boom (13) in order to relieve pressure from boom cylinder (14). Remove bolt (14A) and remove pin assembly (14B). Use Tooling (A) in order to lower the rod end of boom cylinder (14). Completely lower the rod end of the boom cylinder.
Show/hide table
Illustration 7 g01025831 - Remove coolant reservoir (15). Remove bolt (16).
Show/hide table
Illustration 8 g01025851 - Remove bolts (17) and remove engine valve cover (18).
Show/hide table
Illustration 9 g01025853 - Remove oil filler cap (19). Remove bolt (21) that holds clip (22). Slide clip (22) toward the valves. Make sure that valves (20) are in the closed position. This is necessary in order to provide clearance for Tooling (B) that will be used in the next step.
Show/hide table
Illustration 10 g01025862 - Place protective cover (23) over the exposed cylinder head valves, as shown. Use Tooling (B), (C), (D) and (E) in order to remove the pin assembly from the boom. Remove the pin assembly and remove the boom. The weight of the boom is approximately
1360 kg (3000 lb) . The weight of the pin assembly is approximately56 kg (125 lb) . The weight of Tooling (B), (C), (D) and (E) is approximately165 kg (360 lb) .
Illustration 1 | g01025505 |
Remove the Boom Bearings and Seals and Install the Boom Bearings and Seals
Required Tools | |||
Tool | Part Number | Description | Qty |
A | 6V-3175 | Double Acting Cylinder | 1 |
B | 4C-9634 | Puller Stud | 1 |
C | 9U-5339 | Bearing Puller | 1 |
D | 1P-0520 | Driver Gp | 1 |
- Remove seal (1). Remove the bearing.
Illustration 11 | g01025944 |
- Install the bearings by using Tooling (A), (B) and (C) (not shown), as shown. Install the seal by using Tooling (D).
Illustration 12 | g01025953 |