TK711, TK721, TK722 and TK732 Track Feller Bunchers Machine Systems Caterpillar


Final Drive - Disassemble

Usage:

TK711 101

Disassembly Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
138-7576  Link Bracket 
1P-1855  Retaining Ring Pliers 
1P-1862  Retaining Ring Pliers 
5P-5197  Retaining Ring Pliers 
1P-2321  Puller Assembly(1) 
1P-0520  Drive Group 
2P-8312  Snap Ring Pliers 
138-7574  Link Bracket 
1P-5546  Crossbar 
5F-7366 Screw 
1P-0523 Drive Plate 
9S-8546 Seal Installer 
6V-3532 Bolt 
8T-3282 Washer 
1U-8758  Retaining Ring Pliers 
1P-0074  Slide Hammer Puller Gp 
1P-0069 Head 
2P-2312 Puller Leg 
1P-7407  Eyebolt 
199-6557  Spanner Socket 
4C-8359  Eyebolt 
127-8458  Final Drive Disassembly and Assembly Bench 
127-8468  Reaction Bar As 
3S-6224  Electric Hydraulic Pump 
8T-0820 Pressure Gauge 
3B-7722 Bushing 
1P-2376 Coupler Assembly 
1P-2377 Plug 
8F-0024 Hose Assembly 
RR  5/16 inch drill bit 
(1) Use 6C-7887 Leg on the two gears that are removed in Step 16.

Start By:

  1. Drain the oil from the final drive.

  2. Remove the final drive. Refer to Disassembly and Assembly, "Final Drive - Remove" in this manual.


    Illustration 1g00659659

  1. Remove bolts (2) that mount travel motor (1).


    Illustration 2g00659674

  2. Attach a suitable lifting device to the travel motor. Remove the travel motor. The weight of the travel motor is approximately 54 kg (120 lb).


    Illustration 3g00676009

  3. Remove O-ring seal (3) from the travel motor.


    Illustration 4g01020262

  4. Remove plug (4).


    Illustration 5g01020283

  5. Fasten lifting straps and a hoist to the final drive sprocket. Remove the sprocket bolts (5) from final drive sprocket (6). Use a soft faced hammer to unseat the sprocket.

  6. Remove final drive sprocket (6). The weight of the final drive sprocket is 91 kg (200 lb).


    Illustration 6g01020294

  7. Remove bolts (7) and the washers that hold cover (8) in place.


    Illustration 7g01020301

  8. Use forcing screws M12X50 mm (9) to elevate the cover. This action will allow enough clearance for your fingers to lift the cover off the final drive.

  9. Remove cover (8).

  10. If necessary, remove the spacer (Not Shown) from cover (8).


    Illustration 8g00659771

  11. Remove carrier assembly (10).

  12. Disassemble carrier assembly (10), as follows:


      Illustration 9g00659793

    1. Use Tooling (B) to remove retaining ring (11).


      Illustration 10g00660636


      Illustration 11g01020401

    2. Use a soft faced hammer to remove planetary gear assembly (12). Tooling (E) may also be used to remove planetary gear assembly (12).

      Note: Rotate the planetary gear assembly so that the gear assembly comes off perpendicular to the carrier shaft.

    3. Disassemble planetary gear assembly (12), as follows.


      Illustration 12g00659802


      Illustration 13g00659805

    4. Use Tooling (C) to remove the second retaining ring (13).

      Note: When you remove the bearing assembly, the rollers will fall out of the bearing race. Put a rubber band around the bearing rollers as you remove the bearing assembly.

    5. Remove two rings (14), and bearing (15) from planetary gear assembly (12).

    6. Repeat Steps 12a through 12e for the other two planetary gears.


      Illustration 14g00659861

    7. Remove the center shaft (16) from carrier assembly (10).


      Illustration 15g00746486

    8. Use a hammer and a punch to remove washer (16a) from shaft (16).


      Illustration 16g00659844

    9. Use Tooling (D) to remove retaining ring (17).


      Illustration 17g00659863

    10. Remove sun gear (18) from carrier assembly (10).


    Illustration 18g00659867

  13. Remove carrier assembly (19).

  14. Disassemble carrier assembly (19), as follows:


      Illustration 19g00659873

    1. Use Tooling (D) to remove retaining ring (20).


      Illustration 20g00659879

    2. Use Tooling (E) to remove planetary gear assembly (21).


      Illustration 21g00659889


      Illustration 22g00903928

    3. Use Tooling (F) and a press to drive the bearing assembly out of planetary gear (21).

      Note: This is only one method for removing the bearing. You may also cut the bearing. Cut a notch in the bearing cup. Refer to illustration 22. Remove one row of the bearing rollers through the notch. Make sure that you catch the rollers, while you drive the bearing assembly out of planetary gear (21).

    4. Repeat Steps 14a through 14c for the other two planetary gear assemblies.


      Illustration 23g00660095

    5. Use Tooling (D) to remove retaining ring (22).


      Illustration 24g00660100

    6. Remove sun gear (23) from carrier assembly (19).


    Illustration 25g00660105

  15. Use Tooling (D) to remove two retaining rings (26) from two of the planetary gear assemblies (24) from carrier assembly (25).

    Note: There are two sets of bearing rollers for each planetary gear assembly. The bearing rollers for the lower bearing assembly will fall after the planetary gear assembly is removed.



    Illustration 26g00660136

  16. Use Tooling (E) to remove two planetary gear assemblies (24).

    Note: Two planetary gear assemblies (24) are removed to access the retaining ring that holds the carrier assembly (25) to the motor housing.



    Illustration 27g00660143

  17. Use Tooling (G) to remove retaining ring (27).


    Illustration 28g00660173

  18. Use Tooling (H) and a hoist to remove carrier assembly (25).

  19. Disassemble carrier assembly (25), as follows:


      Illustration 29g00765592

    1. Use Tooling (E) to remove bearing race (28) from the two shafts of carrier assembly (25).

    2. Use Tooling (D) to remove three retaining rings (26) from the three remaining planetary gear assemblies.

    3. Use Tooling (E) to remove planetary gear assemblies from the carrier assembly.

    4. Use Tooling (E) to remove the other three bearing races from the carrier assembly.

    5. Disassemble planetary gear assemblies (24), as follows.


      Illustration 30g00660181

    6. Remove bearing rollers (29), two bearing races (28), two rings (30), and retaining ring (32) from planetary gear (31).

      Note: Place a rubber band around the bearing rollers as you remove the bearings.

  20. Fasten a hoist to the final drive, and turn the final drive over 180 degrees.


    Illustration 31g00660205


    Illustration 32g00660210

    ------ WARNING! ------

    Sudden release of spring force can cause injury.

    To prevent the possibility of injury, follow the procedure to relieve the spring pressure.


  21. Tighten Tooling (I) to relieve the spring pressure.

  22. Use Tooling (J) to remove retaining ring (33).

  23. Remove Tooling (I).


    Illustration 33g00660226

  24. Remove plate (34).

  25. Remove plug (35).


    Illustration 34g00660233

  26. Remove springs (36).

    Note: There is an inner spring and an outer spring in each spring set.



    Illustration 35g00660240

  27. Apply air pressure through the port of plug (32). Hold a finger over the port directly across plug (32) while you inject the air. This will unseat the brake piston (37).

  28. Remove brake piston (37).


    Illustration 36g00660245

  29. Remove two backup rings (38) and O-ring seal (39) from the piston.


    Illustration 37g00660451

  30. Fasten a hoist to the final drive, and turn the final drive over 180 degrees in order for the discs and plates to fall out of the motor housing.

  31. Remove discs and plates (40) from the motor housing.

    Note: Note the orientation of the discs and the plates for installation purposes.



    Illustration 38g00660462

  32. Use Tooling (K) to remove washer (41).


    Illustration 39g00744629

  33. Use Tooling (J) to remove retaining ring (42).

    Note: Tap on plate (43) to relieve the pressure that is on retaining ring (42).



    Illustration 40g00660488


    Illustration 41g00660455

  34. Fasten a hoist to the final drive, and turn the final drive over 180 degrees, as shown.

  35. Use Tooling (I) to remove coupling shaft (45), bearing (44), and plate (43).


    Illustration 42g00660550

  36. Disassemble coupling shaft (45), bearing (44), and plate (43), as follows.


      Illustration 43g00660508

    1. Use Tooling (F) and a press to push the coupling shaft (45) through bearing (44) and plate (43).

      Note: Bearing (44) will stop once the bearing makes contact with the plates (X).



      Illustration 44g00660671

      Note: Spread plates (X) wide enough so that bearing (44) can be removed from plate (43).

    2. Use Tooling (F) and a press to push bearing (44) out of plate (43).


    Illustration 45g06387895


    Illustration 46g06387826

    Note: Use caution not to damage the cage of the bearing cone underneath nut (46).

    Note: Use caution not to damage the threads on the spindle.

  37. Drill four holes at Dimension (X). Holes at Dimension (X) should be 5 to 10 mm (0.20 to 0.39 inch) in diameter.

  38. Use a suitable chisel to split nut (46) into two pieces at Dimension (X).

  39. Remove nut (46) and all remaining contaminants.

  40. Remove dowels (47).

127-8458 Final Drive Disassembly and Assembly Bench

Note: The following procedure is for using the final drive disassembly and assembly 127-8458 Bench .

Reference: Refer to the Tool Operating Manual, NEHS0673 for further procedures concerning 127-8458 Bench.



    Illustration 47g00671089

  1. Fasten Tooling (L) and a hoist to Tooling (M).

  2. Lower Tooling (M) into the final drive. Make sure that the notches in nut (46) are aligned with the keys on Tooling (M). The approximate weight of Tooling (M) is 45 kg (100 lb).


    Illustration 48g00671092

  3. Fasten Tooling (N) and a hoist to the final drive. Keep the hoist attached.

  4. Position a fork lift under adapter ring (48).

  5. Raise the final drive and adapter ring (48) simultaneously.


    Illustration 49g00671095

  6. Raise the final drive and adapter ring (48) into the air so that you can bolt the final drive and adapter ring (48) together with five bolts (49).

    Note: Place blocks under the adapter ring (48) while you tighten bolts (49).



    Illustration 50g00671100

  7. Remove the hoist from Tooling (N) and attach four chains and a hoist to the upper half of Tooling (P).

  8. Remove the upper half of Tooling (P). The weight of the upper half is 816 kg (1800 lb).


    Illustration 51g00671109

  9. Install Tooling (N) and place adapter ring (48) and the final drive onto the lower half of Tooling (P). The weight of the final drive, adapter ring (48), and Tooling (M) is 522 kg (1150 lb).

  10. Fasten the final drive onto the lower half of Tooling (P). Use eight 1 - 8THDX3.5 inch bolts (50) and eight 1 - 8THD nuts with washers.

  11. Remove Tooling (N) and the hoist.


    Illustration 52g00671117

  12. Place Tooling (Q) into the final drive.

  13. Fasten a hoist to the upper half of Tooling (P) and install the upper half of Tooling (P) to the lower half of Tooling (P). Pin the two halves together.


    Illustration 53g00672359

  14. Attach Tooling (R) to the pressure reducing valve manifold, as shown.

  15. Set the torque level for the bench to 2000 psi (14500 lb ft). Do not exceed this pressure.

    Reference: Refer to the Tool Operating Manual, NEHS0673 for setting the torque level.



    Illustration 54g00671120
    (51) 128-4075 Shaft As

  16. Place hex shaft (51) through the bench and into Tooling (Q).

  17. Remove locknut (46). The breakaway torque will vary. The nut will loosen usually at 1400 psi (10750 lb ft).

  18. Fasten a hoist to the upper half of Tooling (P).

  19. Remove the upper half of Tooling (P).

Disassembly Procedure for the Main Housing and the Motor Housing



    Illustration 55g00674023

  1. Fasten Tooling (N) and a hoist to main housing (52), as shown.

  2. Separate the main housing (52) from the motor housing (53). The weight of the main housing is 204 kg (450 lb).

    Note: Two outer races and one roller bearing will be removed with the main housing. The other roller bearing and the two Duo-cone seal kits will remain with the motor housing.

  3. Disassemble motor housing (53), as follows.


      Illustration 56g00674036

    1. Use two screwdrivers and remove bearing (54) from the motor housing.

    2. Remove the Duo-cone seal kit (55) from the motor housing.


      Illustration 57g00674039

    3. Remove the two backup rings and O-ring seal (56) from the motor housing.

    4. Remove the other Duo-cone seal kit (57) from the motor housing.

  4. Disassemble the main housing (52), as follows.


      Illustration 58g00675939

    1. Remove bearing (58) from the main housing (52).


      Illustration 59g00675961

    2. Turn main housing (52) over 180 degrees, as shown.

    3. Remove bolts (59).

    4. Install Tooling (A) and a hoist to housing (61).

    5. Separate housing (61) from ring gear (60).


      Illustration 60g00676750

    6. Remove race (62) with a brass punch and a hammer.

    7. Rotate housing (61) over 180 degrees.


      Illustration 61g00676000

    8. Remove race (63) from housing (61).

    9. Remove O-ring seal (64) from housing (61).

Caterpillar Information System:

572R Series II Pipelayer Track Rollers - Single Flange and Double Flange
2003/09/01 New Software Is Used on Product Link 151/201 {7606, 7620}
777D and 777D HAA Off-Highway Truck and 776D Off-Highway Tractor Operation Information
216, 226, 228, 232, 236, 242, 246, 248, 252 and 262 Skid Steer Loaders Lower Machine Frame - Clean
777D and 777D HAA Off-Highway Truck and 776D Off-Highway Tractor Operation Information
267, 277 and 287 Multi Terrain Loaders Machine Systems Fuel Tank - Remove and Install - 287 Multi Terrain Loader
259B3 Compact Track Loader, 247B3 and 257B Series 3 Multi Terrain Loaders and 216B Series 3, 226B3, 236B3, 242B Series 3 and 252B Series 3 Skid Steer Loaders Radiator and Hydraulic Oil Cooler (Fan)
TK711, TK721, TK722 and TK732 Track Feller Bunchers Machine Systems Air Conditioner - Install
Computer Aided Earthmoving System Basic (CAESBasic) Additional Utilities
572R Series II Pipelayer Power Train Steering Clutches and Brakes
12H Motor Grader Engine Supplement Water Pump - Install
12H Motor Grader Engine Supplement Water Pump - Remove
236B, 246B, 252B and 262B Skid Steer Loaders Machine Systems Gear Motor (Fan)
PL61 Pipelayer Before Operation
416D, 420D and 430D Backhoe Loaders Axles, Differential and Brakes Differential (Standard)
267, 277 and 287 Multi Terrain Loaders Machine Systems Solenoid Valve and Mounting (Coupler) - Remove and Install - 287 Multi Terrain Loader
12H Motor Grader Engine Supplement Engine - Remove
572R Series II Pipelayer Platform Mounting
12H Motor Grader Engine Supplement Engine - Install
572R Series II Pipelayer Fender
D7R Series II Track-Type Tractor Power Train Drawbar
D7R Series II Track-Type Tractor Engine Starting with Auxiliary Start Receptacle
826G Series II Landfill Compactor, 825G Series II Soil Compactor and 824G Series II Wheel Dozer Additional Messages
Product Link MODEM Programming with Cat Electronic Technician (ET){7606, 7620} Product Link MODEM Programming with Cat Electronic Technician (ET){7606, 7620}
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.