135-1694 Rear Shaft Group and 135-1696 Rear Shaft Group
Illustration 1 | g00928302 |
(1) Torque for the 48 bolts ... 135 ± 20 N·m (100 ± 15 lb ft)
177-1636 Universal Joint , 177-1637 Universal Joint and 177-1717 Universal Joint
Illustration 2 | g00928288 |
131-8403 Rear Drive Shaft Group
Illustration 3 | g00928300 |
(2) 131-8403 Rear Drive Shaft Group
(3) Torque for the two bolts ... 270 ± 40 N·m (200.0 ± 30.0 lb ft)
(4) Assemble the yokes in a line.
(5) Before assembly, apply 2S-3230 Bearing Lubricant to the seal lips. Pack 30 to 50 percent of the rings to the seals with 2S-3230 Bearing Lubricant.
(6) Pack 30 to 50 percent of the housing with 2S-3230 Bearing Lubricant.
(7) Pack 30 to 50 percent of the bearing with 2S-3230 Bearing Lubricant.
(8) Before assembly, apply 5P-0960 Molybdenum Grease to the drive shaft spline.
(9) Pack 30 to 50 percent of the two bearings with 2S-3230 Bearing Lubricant. As shown, Install the two bearings.