Removal Procedure
Start By:
- Release the pressure in the hydraulic system. Refer to Disassembly and Assembly, "Hydraulic System Pressure - Release".
- Remove five hose assemblies (1) from metering pump (2) .
NOTICE |
---|
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair of the machine. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop Products Guide", for tools and supplies suitable to collect and contain fluids in Caterpillar machines. Dispose of all fluids according to local regulations and mandates. |
Note: Put identification marks on all hoses. This will aid in assembly.
Note: Plug and cap all hoses and openings. This will help to prevent fluid losses and this will help to keep contaminants from entering the system.
Illustration 1 | g00484350 |
- Support metering pump (2). Remove four bolts (3), the washers and the grommets. Remove metering pump (2) .
Illustration 2 | g00484356 |
- Place an alignment mark on the metering pump (2) and plate (5). This will aid in installation. Remove four bolts (4) and the washers. Remove plate (5) from the metering pump (2) .
Illustration 3 | g00484357 |