Track - Connect
Connection Procedure
Show/hide table
Required Tools     | |||
---|---|---|---|
Tool     | Part Number     | Part Description     | Qty     |
A     | 8S-7610     | Base     | 2     |
8S-7650 | Cylinder     | 2     | |
3S-6224 | Electric Hydraulic Pump     | 2     | |
B     | 8S-7640     | Stand     | 2     |
8S-7611 | Tube     | 2     | |
8S-7615 | Pin     | 2     | |
C     | 1P-3532     | Track Block     | 1     |
D     | 138-7574     | Link Bracket     | 1     |
- Put the track in position under the track roller frame.
- Lift the machine off Tooling (B) by using Tooling (A) .
- Remove Tooling (B). Lower the machine on the track by using Tooling (A) .
- Install Tooling (D) and a chain to the end of track (7) and to a wheel loader or a similar machine. Use the wheel loader and pull track (7) over the front idler.
Show/hide table
Illustration 1 | g00700936 |
Show/hide table
Illustration 2 | g00700935 |
- Pull track (7) until the track bushings engage with the sprocket segments on the final drive.
- Start the machine. Turn the final drive in a reverse direction in order to pull the track together.
- Remove the chain and Tooling (D) from the track.
- Align the lower end (9) of the master link with the upper end (8) of the master link. Make sure that the serrations of both ends of the master link are engaged.
Show/hide table
Illustration 3 | g00700997 |
- Put 4C-5593 Anti-Seize Compound on the following parts of bolts (6) : threads, body and washer face.
Show/hide table
Illustration 4 | g00701001 |
- Put master shoe (4) in position on the master link. Install six bolts (6). The bolts are used for holding the master link together. Tighten the bolts to a torque of 400 ± 70 N·m (300 ± 50 lb ft). Tighten the bolts for 120 ± 5 degrees more.
- Tighten relief valve (2) and fill valve (3). Tighten the valves to a torque of 35 ± 7 N·m (26 ± 5 lb ft).
Show/hide table
Illustration 5 | g00700931 |
- Adjust the track.
Note: For adjusting the tracks, refer to Operation and Maintenance Manual, "Adjust Tracks" for the correct procedure for adjusting the track.
- Install the O-ring seal on track adjuster cover (1). Install the cover on the roller frame.
Show/hide table
Illustration 6 | g00700897 |
Caterpillar Information System:
517 Track-Type Skidder Power Train Track - Separate
C9 Engines for Caterpillar Built Machines Electric Starting Motor - Remove and Install
824G , 825G and 826G Landfill Compactor Window Washer Reservoir - Fill
517 Track-Type Skidder Power Train Track Roller - Assemble
Challenger 35, Challenger 45 and Challenger 55 Agricultural Tractors Implement, Steering and Brake Hydraulic Systems Charge Pump
416C, 426C, 428C, 436C and 438C Backhoe Loaders Axles, Differential and Brakes Drive and Steering Axle (Front)
517 Track-Type Skidder Power Train Track Roller - Disassemble
C9 Engine For Caterpillar Built Machines Alternator - Remove and Install
554 Forwarder and 574 Forwarder Parking Brake Manual Release
824G , 825G and 826G Landfill Compactor Drive Shaft Support Bearing - Lubricate
69D and 769D Off-Highway Trucks and 771D Quarry Truck Power Train Relief Valve (Torque Converter Outlet)
69D and 769D Off-Highway Trucks and 771D Quarry Truck Steering System Piston Pump (Steering)
3176C and 3196 Engines For Caterpillar Built Machines Fuel Manifold - Remove
824G Wheel Dozer, 825G Soil Compactor and 826G Landfill Compactor Hydraulic System Hydraulic Tank and Filter
980G Wheel Loader Power Train Final Drive, Brake and Wheel - Remove
517 Track-Type Skidder Power Train Sprocket Segment - Remove and Install
517 Track-Type Skidder Power Train Front Track Roller Frame - Remove
517 Track-Type Skidder Power Train Front Track Roller Frame - Install
517 Track-Type Skidder Power Train Recoil Spring - Remove
517 Track-Type Skidder Power Train Recoil Spring - Install
517 Track-Type Skidder Machine Systems Fuel Tank (Fixed Boom) - Remove
517 Track-Type Skidder Power Train Track Adjuster - Remove
517 Track-Type Skidder Power Train Track Adjuster - Install
517 Track-Type Skidder Machine Systems Fuel Tank (Swing Boom) - Install