784C and 785C Off-Highway Trucks Machine Systems Caterpillar


Air Control Valve (Service Brake) - Remove and Install

Usage:

785C 1HW

Removal Procedure

Start By:

  1. Remove the cab front plate. Refer to Disassembly and Assembly, "Plate (Cab Front) - Remove and Install".

  2. Release the air system pressure. Refer to Disassembly and Assembly, "Air Tanks (Brake) - Purge".

------ WARNING! ------

In order to prevent possible personal injury, release the air pressure from the air tank before disconnecting any components of the air system.


    Note: Cleanliness is an important factor. Before the removal procedure, the exterior of the component should be thoroughly cleaned. This will help to prevent dirt from entering the internal mechanism.

    Note: Put identification marks on all hose assemblies, on all tube assemblies and on all wire harnesses for installation purposes. Plug all hose assemblies and all tube assemblies. This helps to prevent fluid loss and this helps to prevent contaminants from entering the system.



    Illustration 1g00521324

  1. Disconnect hose assembly (1) from the supply air manifold.


    Illustration 2g00521328

  2. Disconnect hose assembly (2) from the brake double check valve.


    Illustration 3g00521330

  3. Disconnect wire harness connector (3) from the accelerator control rotary position sensor.


    Illustration 4g00521331

  4. Remove four bolts and washers (4). Remove the brake pedal plate (arrow).


    Illustration 5g00521332

  5. Disconnect hose assembly (1) from elbow (5). Remove elbow (5) from the service brake air control valve.


    Illustration 6g00521338

  6. Disconnect hose assembly (2) from elbow (6). Remove elbow (6) from the service brake air control valve.


    Illustration 7g00521340

  7. Remove three bolts (7). Remove service brake air control valve (8) from the brake pedal plate.

Installation Procedure

    Note: Apply 5P-3413 Pipe Sealant to all pipe plugs, nipples and fittings that are used during the installation procedure.



    Illustration 8g00521340

  1. Install service brake air control valve (8) with three bolts (7).


    Illustration 9g00521338

  2. Install elbow (6) to the service brake air control valve, as shown. Connect hose assembly (2) to elbow (6).


    Illustration 10g00521332

  3. Install elbow (5) to the service brake air control valve, as shown. Connect hose assembly (1) to elbow (5).


    Illustration 11g00521331

  4. Install the brake pedal plate (arrow) with four bolts and washers (4).


    Illustration 12g00521330

  5. Install wire harness connector (3) to the accelerator control rotary position sensor.


    Illustration 13g00521328

  6. Connect hose assembly (2) to the brake double check valve.


    Illustration 14g00521324

  7. Connect hose assembly (1) to the supply air manifold.

  8. Refer to Operation and Maintenance Manual, SEBU7173, "Starting with an External Air Supply" in order to refill the air tanks.

End By:

  1. Install the cab front plate. Refer to Disassembly and Assembly, "Plate (Cab Front) - Remove and Install".

  2. Remove the front wheel chocks and the rear wheel chocks. Refer to Disassembly and Assembly, "Wheel Chocks (Front and Rear) - Remove and Install".

Caterpillar Information System:

784C and 785C Off-Highway Trucks Machine Systems Air Control Valve (Secondary Brake) - Remove and Install
527 Track-Type Skidder Fire Prevention and Explosion Prevention
784C and 785C Off-Highway Trucks Machine Systems Air Control Valve (Manual Retarder) - Remove and Install
D250E Series II and D300E Series II Articulated Trucks Power Train Transmission Hydraulic Control Valve - Disassemble
784C and 785C Off-Highway Trucks Machine Systems Air Control Valve (Automatic Retarder) - Remove and Install
5130, 5130B and 5230 Excavators, 784B, 785B, 785C, 789B, 789C, 793B and 793C Off-Highway Truck/Tractors and 992G, 994 and 994D Wheel Loaders Vital Information Management System (VIMS) Sensor Dynamic Test
773D Off-Highway Truck and 775D Quarry Truck Pressure Control Valve (Transmission)
D250E Series II and D300E Series II Articulated Trucks Power Train Torque Converter and Retarder - Connect
527 Track-Type Skidder Power Train Torque Converter
773D, 773E, 775D and 775E Off-Highway Trucks Machine Systems Service and Parking Brake (Rear) - Disassemble
784C and 785C Off-Highway Trucks Machine Systems Fuel Tank - Install
3306C Engines for Caterpillar Built Machines Crankshaft
3406E On-Highway Engine Camshaft - Remove
IT14G Integrated Toolcarrier and 914G Wheel Loader Machine Systems Metering Pump (Steering) - Assemble
784C and 785C Off-Highway Trucks Machine Systems Air Control Valve (Parking Brake) - Remove and Install
D250E Series II and D300E Series II Articulated Trucks Power Train Transmission Hydraulic Control Valve - Assemble
980G Wheel Loader Machine Systems Piston Pump (Steering) - Assemble
784C, 785C and 785C HAA Off-Highway Truck/Tractors Steering System Steering Tank and Filter
583R Pipelayer Power Train Transmission Selector and Pressure Control Valve
527 Track-Type Skidder Power Train Transmission Selector and Pressure Control Valve
583R Pipelayer Power Train Transmission Hydraulic Control
784C, 785C and 785C HAA Off-Highway Truck Air System and Brakes Air System
784C and 785C Off-Highway Trucks Machine Systems Pressure Protection Valve (Service Brake) - Remove and Install
5130, 5130B and 5230 Excavators, 784B, 785B, 785C, 789B, 789C, 793B and 793C Off-Highway Truck/Tractors and 992G, 994 and 994D Wheel Loaders Vital Information Management System (VIMS) Lift or Tilt Cylinder Sensor - Troubleshoot
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.