Usage:
NOTE: The information supplied in this service letter may not be valid after the termination date of this program. Do not perform the work outlined in this Service Letter after the termination date without first contacting your Caterpillar product analyst.
NOTE: This Program can only be administered after a failure occurs. The decision whether to apply the Program is made by the dealer. When reporting the repair, use "PS0715" as the Part Number and "7755" as the Group Number. Use "96" as the Warranty Claim Description Code and use "Z" as the SIMS Description Code.
Termination Date
February 29, 1996Problem
The final drives on the front axle of certain D400D Articulated Trucks may not reach their desired service life. Pitting and/or spalling may occur on the gears, bearings, and/or shafts.
Affected Product
Model & Identification Number
D400D (8TF1-823 4EJ1-20 )
Parts Needed
- 40 - 1A8537 Capscrew
- 4 -8D2714 Seal O Ring
- 12 - 1P3958 Roller Assembly
- 2 -2R0239 Seal O Ring
- 12 - 0S1587 Cap Screw
- 6 -1T0822 Bolt
- 6 -4V4500 Spacer
- 6 -4V4501 Shaft
- 12 - 4V5233 Washer
- 12 - 4V5234 Washer
- 2 -4V5237 Carrier
- 2 -5V7614 Plate
- 2 -5V7615 Cover
- 2 - 1022453 Gear
- 6 - 1022454 Gear
- 2 - 1117985 Spacer
- 2 - 1119334 Gear-Ring
- 4 -8D2714 Seal O Ring
Action Required
NOTE: If either of the final drives fail, both final drives must be reworked.
After failure, replace the existing parts with the new parts listed under Parts Needed. Make sure that the new spacer between existing wheel assembly and new planet carrier is installed.
1. Park the machine on level ground.
2. Drain the oil from the final drives. (Approximately 1.5 US gallons per side.)
3. Remove the existing final drives using the procedure in the Service Manual, to the point of removing the ring gears. Save the 4C1627 Axle Shafts, 8K6464 Sun Gear Retaining Rings, 2V7398 Planet Shaft Retaining Rings, 5P4484 Planet Carrier Drain Plugs with 7M8485 O-Rings, the 5P8247 Washers used to mount the planet carriers, and the 5P8245 Washers used to mount the final drive covers for later use.
4. Install the new ring gears.
5. Install the 8D2714 O-Rings to the spacers and install the spacers in the wheel assemblies.
6. Assemble the new final drive planet carriers using the procedure in the Service Manual.
7. Install the final drives using the procedure in the Service Manual. Use the new bolts to fasten the planet carriers to the wheel assemblies.
8. Install the sun gears and retaining rings on the axle shafts and install the axle shafts.
9. Install the new plates, bolts, and o-rings on the new final drive covers. Install the covers on the planet carriers using the new bolts.
10. Add oil to the correct level.(Approximately 3 US gallons)
SERVICE CLAIM ALLOWANCES
NOTE: This is a 5.5-hour job to rework both final drives.
Parts Disposition
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling.