C175-16 and C175-20 Locomotive Engines Caterpillar


Pistons, Liners, and Connecting Rods - Install

Usage:

C175-16 3B9

Installation Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
279-3473  Barring and Mounting Gp 
329-3831(1) Barring Tool 
274-5875(2)  Connecting Rod Guide 
418-1340(3) Guide 
339-6503 Bolt 
322-3564(4)  Cylinder Tool Gp 
288-9169  Bracket As 
2P-8260 Cylinder Liner Installer 
Bel-Ray Molylube 67700 (5) 
Loctite LB8801 Silicone Lubricant 
(1) Optional
(2) Use for engine serial numbers 1-999 (type 1)
(3) Use for engine serial numbers 1000-99999 (type 2)
(4) Extended reach clamps 554–5056 are available for double seal cylinder liners
(5) Refer to the following link to order molylube specified above - www.belray.com

Note: Ensure that the top O-ring seal for the liner is at least 20 °C (68 °F) before installation of liners into the cylinder block. Assembly with a cold seal may result in damage to the O-ring seal or to the installation tool.



    Illustration 1g06119953

  1. Rotate the engine to position the piston toward top dead center for easy access. Refer to Testing and Adjusting, "Finding Top Center Position for No. 1 Piston".

  2. Attach a suitable lifting device onto Tooling (E). The weight of the piston, the liner, and the connecting rod is approximately 50 kg (110 lb). Install Tooling (B) onto the connecting rod. Coat the liner bore of the cylinder block and the O-ring seals on the outside of the cylinder liner with Tooling (H). Install cylinder pack (4) into the cylinder block.

    Note: Inspect the connecting rod bearing for wear or for damage. If necessary, replace the connecting rod bearing. Refer to Disassembly and Assembly, "Connecting Rod Bearings - Remove and Install" for the proper procedure. Position the connecting rod so that the chamfer is toward the crankshaft. Install the piston, the liner, and the connecting rod as a unit.



    Illustration 2g01765495

  3. Remove Tooling (E).


    Illustration 3g01945551

  4. Install Tooling (F). Use Tooling (F) to seat the liner into the cylinder block. Fully seat the cuff.


    Illustration 4g01240845

  5. Remove Tooling (B) from the connecting rod.


    Illustration 5g03405954

    Note: Match the tabs on the ODD and EVEN connecting rod caps with the connecting rods.

  6. Install connecting rod cap (3). Apply Tooling (G) under the connecting rod bolts (1), the rings, and to the threads of the bolts. Install connecting rod bolts (1) and spacers (2).

  7. Use Tooling (A) to rotate the flywheel to access the connecting rod cap (3) that will be installed.


    Illustration 6g06095130
    The arrow represents the front of the engine block
    Bolt (1) is always identified as the center bolt on the bearing tab side of the connecting rod.
    (A) Bearing tab side
    (X) Odd numbered connecting rod
    (Y) Even numbered connecting rod

  8. Use the following procedure to tighten the connecting rod bolts:

    Table 2
    Torque Specifications 
    Use the following procedure to tighten the bolts of the connecting rod:
    Apply Tooling (G) to the bolt with by fully coating the elastomer rings, threads, and the contact surface under the bolt head.
    1. Install all the bolts into the spacers by pushing and rotating the bolt simultaneously.
    Note: Rotating the bolt while pushing will avoid damage to the bolts.

    2. Install the bolts into the connecting rod cap by pushing and rotating the bolt simultaneously.
    3. Engage the threads by pushing and slowly rotating the bolt. Do not tap the bolt. All six bolts should have the threads engaged before the joint is drawn together on either side. The order of engaging the threads is bolts 1-2-3-4-5-6. Engaging bolt 1 and 2 first helps center the cap to the connecting rod. Once bolts 1 and 2 threads have engaged install the remaining bolts in order.
    4. Tighten bolt 1 and bolt 2 to 85 ± 5 N·m (63 ± 4 lb ft).
    5. Tighten bolt 3 and bolt 4 to 85 ± 5 N·m (63 ± 4 lb ft).
    6. Tighten bolt 5 and bolt 6 to 85 ± 5 N·m (63 ± 4 lb ft).
    7. Again tighten bolt 1 and bolt 2 to 85 ± 5 N·m (63 ± 4 lb ft).
    8. Again tighten bolt 3 and bolt 4 to 85 ± 5 N·m (63 ± 4 lb ft).
    9. Again tighten bolt 5 and bolt 6 to 85 ± 5 N·m (63 ± 4 lb ft).
    10. Turn bolt 3 and bolt 4 an extra 90 ± 5 degrees.
    11. Turn bolt 5 and bolt 6 an extra 90 ± 5 degrees.
    12. Turn bolt 1 and bolt 2 an extra 90 ± 5 degrees. 

    Note: A new connecting rod assembly will arrive with bolts intended to secure the fractured joint after manufacturing. Do not use these bolts.

  9. Fill the engine with oil. Refer to Operation and Maintenance Manual, "Engine Oil and Filter - Change".

End By:

  1. Install the piston cooling jet.

  2. Install the cylinder head.

Caterpillar Information System:

Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.