Air Inlet Manifold - Remove and Install
Start By:
- Remove the aftercooler. Refer to Disassembly and Assembly, "Aftercooler - Remove and Install".
Show/hide table
NOTICE |
---|
Keep all parts clean from contaminants. Contaminants may cause rapid wear and shortened component life. |
- Remove bolts (2). Pry elbows (3) away from air inlet manifold (1).
- Remove bolts (4).
- Attach a suitable lifting device to air inlet manifold (1). The weight of air inlet manifold (1) is approximately
90 kg (200 lb) . - Remove air inlet manifold (1). Remove the O-ring seals from elbows (3).
Show/hide table
Illustration 1 | g01114292 |
Show/hide table
NOTICE |
---|
Keep all parts clean from contaminants. Contaminants may cause rapid wear and shortened component life. |
- Install the O-ring seals on elbows (3). Apply a light amount of glycerin to the bores for the O-ring seals.
- Attach a suitable lifting device to air inlet manifold (1). The weight of air inlet manifold (1) is approximately
90 kg (200 lb) . - Position air inlet manifold (1) and install bolts (4).
- Position elbows (3) and install bolts (2).
Show/hide table
Illustration 2 | g01114292 |
End By:
- Install the aftercooler. Refer to Disassembly and Assembly, "Aftercooler - Remove and Install".
Caterpillar Information System:
C27 and C32 Engines for Caterpillar Built Machines Idle Speed Is High
3500 Engines Turbocharger - Assemble
3500 Engines Turbocharger - Disassemble
Inspection of Rear Engine Mounts on 3500 Family of Engines {1152, 1154} Inspection of Rear Engine Mounts on 3500 Family of Engines {1152, 1154}
2014/06/13 A New Air Shutoff Gp Is Used on Certain C280 and 3600 Engines {1078}
TH48-E80 Petroleum Transmission Transmission Cooling System
797F and 797F XQ Off-Highway Trucks Machine Systems Fuel Tank - Remove and Install
349F and 352F Excavators Machine System Relief Valve (Line)
C32 Petroleum Generator Sets Fuel Injector - Inspect/Adjust/Replace
2010/04/30 Wiring Change to the Emergency Stop Button for 3500B and 3500C Marine Series 2 Engines {1408, 7332}
C13, C15, and C18 Tier 4 Interim Engines System Overview
797F and 797F XQ Off-Highway Trucks Machine Systems Control Valve (Hoist and Brake Cooling) - Remove and Install
UPSB125 Uninterruptible Power Supply UPS Battery - 50Hz Unit Initial Check
797F and 797F XQ Off-Highway Trucks Machine Systems Hood (Front) - Remove and Install
UPSB125 Uninterruptible Power Supply UPS Battery - 50Hz Metering - Check
UPSB125 Uninterruptible Power Supply UPS Battery - 50Hz System Shutdown
UPSB125 Uninterruptible Power Supply UPS Battery - 50Hz Cabinet - Check
UPSB125 Uninterruptible Power Supply UPS Battery - 50Hz Communication - Check
UPSB125 Uninterruptible Power Supply UPS Battery - 50Hz Configuration - Adjust
UPSB130 Uninterruptible Power Supply UPS Battery - 60Hz Configuration - Check
UPSB125 Uninterruptible Power Supply UPS Battery - 50Hz DC Bus Voltage - Test
UPSB125 Uninterruptible Power Supply UPS Battery - 50Hz Input Power - Test
UPSB125 Uninterruptible Power Supply UPS Battery - 50Hz Manual Transfer - Check
UPSB125 Uninterruptible Power Supply UPS Battery - 50Hz On-Battery - Check