Required Tools | |||
---|---|---|---|
Tool | Part Number | Part Description | Qty |
A | 8T-5255 | Hydraulic Jack | 1 |
B | 3S-6224 | Electric Hydraulic Pump | 1 |
6V-0014 | Cylinder Group | 1 | |
9U-6753 | Retaining Plate | 1 | |
9T-2240 | Rods | 4 | |
8T-4133 | Nuts | 4 | |
8T-4121 | Washers | 4 | |
155-8191 | Sleeve | 1 | |
136-5747 | Puller Stud | 1 | |
9U-6810 | Nut | 1 | |
7X-0542 | Washer | 1 | |
C | 322-5589 | Tube | 1 |
7B-2289 | Bolt | 1 | |
009-3020 | Thrust Washer | 4 | |
D | 3S-6224 | Electric Hydraulic Pump | 1 |
5P-5201 | Double Acting Cylinder | 1 | |
318-2121 | Puller Sleeve As | 1 | |
9U-7763 | Puller Stud | 1 | |
8T-7781 | Nut | 1 | |
7Y-0725 | Hard Washer | 1 | |
9U-7764 | Bushing | 1 |
Start By:
- Connect the steering frame lock.
NOTICE |
---|
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting, and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Refer to Special Publication, NENG2500, "Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Cat® products. Dispose of all fluids according to local regulations and mandates. |
- Lower the bucket so that the bottom of the bucket is flat on the ground.
Show/hide table
Illustration 1 g00317724 - Install Tooling (A) on boom (4) so that Tooling (A) is supporting bucket link (1).
- Remove bolt (2), the washer, and the spacer from plate (3).
Show/hide table
Illustration 2 g00683277 - Remove four bolts (6) and plate (7) from pin (5).
Show/hide table
Illustration 3 g00317728 - Fasten a hoist and a suitable lifting sling to bucket link (1) for support. The weight of the bucket link is approximately
1510 kg (3329 lb) .Show/hide tableIllustration 4 g06207220 - Fasten a hoist and a suitable lifting sling to Tooling (B). The weight of Tooling (B) is approximately
213 kg (470 lb) . Install Tooling (B) on the end of pin (5).Show/hide tableIllustration 5 g00683280 - Tooling (B) will capture pin (5) when Tooling (B) is removed. The weight of pin (5) is approximately
209 kg (460 lb) .Note: The combined weight of bucket pin (5) and Tooling (B) is approximately
425 kg (930 lb) .Show/hide tableIllustration 6 g00317731 - Remove Tooling (A) from bucket link (1). Lower bucket link (1) onto boom (4).
Show/hide table
Illustration 7 g06205332 - Remove bolt (8) and cover (9) from both sides of the bucket.
Show/hide table
Illustration 8 g06205629 - Remove bolts (10), plate (11), and plates (12) from both sides of the pin.
Show/hide table
Illustration 9 g06205720 - Remove bolts (12), cover (13), O-ring seal (14), and shims (15).
- Use Tooling (C) to remove retainer (16). Remove retainer (16).
Show/hide table
Illustration 10 g06206086 Show/hide tableIllustration 11 g06205780 - Fasten a hoist and a suitable lifting sling to Tooling (D). The weight of Tooling (D) is approximately
213 kg (470 lb) . Install Tooling (D) on the end of pin (18), as shown.Note: Ensure that pin (17) will pass through Tooling (D).
- Using Tooling (D), remove pin (18). The combined weight of Tooling (D) and pin assembly (18) is approximately
513 kg (1131 lb) .Note: To prevent damage to the tilt cylinder, make sure that the tilt cylinder is fully retracted before the boom is raised.
Show/hide tableIllustration 12 g00318812 - Fasten a hoist and a suitable lifting sling to the bucket. Remove the bucket. The weight of the bucket is approximately
10350 kg (22818 lb) .Note: If the machine is operational, the bucket may be removed by backing up the machine.
Show/hide tableIllustration 13 g06206098 - Remove collar (19) from the C-pin bore of the bucket. The outside diameter of the collar is a slip fit in the C-pin bore. Repeat for the opposite side of the bucket.
Show/hide table
Illustration 14 g06206815 - Remove seal (20) from collar (19). Repeat for the remaining collar.