- Track-Type Tractor:
- D6T (S/N: MEL1-UP; KMR1-UP; SGT1-UP; TMY1-UP; HTZ1-UP; CG81-UP)
Introduction
This Special Instruction provides the procedure for installation of the lift cylinders and the 6A Bulldozer.
Note: Each section contains the related parts list.
When you have completed this procedure, prepare the machine for service. Refer to the Operation and Maintenance Manual.
Note: Do not perform any procedure in this Special Instruction until the information has been read and understood.
ReferenceService Manual, Parts Manual, Operation and Maintenance Manual.
Warnings
Do not attempt to assemble this machine until you read and you understand the assembly instructions. Improper assembly procedures could result in injury or death. |
Personal injury or death can result from sudden machine movement. Sudden movement of the machine can cause injury to persons on or near the machine. To prevent injury or death, make sure that the area around the machine is clear of personnel and obstructions before operating the machine. |
NOTICE |
---|
Do not let any dirt or foreign material get into the hydraulic system during assembly or maintenance operations. Keep the oil in the hydraulic system at the correct level to prevent pump cavitation. Clean all surfaces where parts are to be installed. |
NOTICE |
---|
When a hoist is used to lift any component, stand clear of the area. Always make sure that the hoist has the correct capacity. Approximate weights of the components are shown in Tables 1 through 4. |
NOTICE |
---|
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting, and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Refer to Special Publication, NENG2500, "Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Cat products. Dispose of all fluids according to local regulations and mandates. |
Note: No oil or lubricant is recommended on new fasteners. When fasteners are reused after being used in the field, the fasteners should be cleaned and lightly oiled before assembly. Instructions are given when lubrication is required.
Weights
Weights for Specified Components of the Lift Cylinder     | |
Description     | Weight     |
Yoke (each)     | 23 kg (51 lb)     |
Lift Cylinder (each)     | 92 kg (203 lb)     |
Weights for Specified Components of the 6A Blade (XL)     | |
Description     | Weight     |
Blade     | 1194.6 kg (2633.6 lb) XL     |
1299.6 kg (2865.2 lb) XW |
|
1456.5 kg (3211.0 lb) LGP |
|
C-Frame     | 1114.4 kg (2456.9 lb) XL     |
1585.9 kg (3496.3 lb) XW |
|
1375.1 kg (3031.6 lb) LGP |
|
Arm Assembly (each)     | 64 kg (141 lb)     |
Tilt Cylinder (each)     | 111 kg (245 lb)     |
Trunnion     | 17 kg (38 lb)     |
Weights for Specified Components of the 6A Blade (XW)     | |
Description     | Weight     |
Blade     | 1337 kg (2948 lb)     |
C-Frame     | 1163 kg (2564 lb)     |
Arm Assembly (each)     | 76 kg (168 lb)     |
Tilt Cylinder (each)     | 111 kg (245 lb)     |
Trunnion     | 17 kg (38 lb)     |
Plate behind trunnion     | 19 kg (42 lb)     |
Weights for Specified Components of the 6A Blade (LGP)     | |
Description     | Weight     |
Blade     | 1511 kg (3331 lb)     |
C-Frame     | 1398 kg (3082 lb)     |
Arm Assembly (each)     | 84 kg (185 lb)     |
Tilt Cylinder (each)     | 111 kg (245 lb)     |
Trunnion     | 17 kg (38 lb)     |
Trunnion Support     | 49 kg (108 lb)     |
Required Parts
387-8324 Bulldozer Ar (1) 433-0335 Bulldozer Ar (2) 387-8373 Bulldozer Ar (3)     |
||
Qty     | Part Number     | Description     |
1     | 6Y-6751     | Pin     |
1     | 109-1352 (1)     | Bulldozer Trunnion Gp     |
4Z-9412 (2) | ||
109-1353 (3) | ||
1     | 251-9814 (1)     | Bulldozer Brace     |
358-0111 (2) | ||
348-6701 (3) | ||
4     | 251-9827 (1)     | Trunnion     |
251-9827 (2) (3) | ||
1     | 251-9829     | Retainer     |
1     | 387-8325 (1)     | C Frame Gp     |
442-8008 (2) | ||
334-1783 (3) | ||
1     | 442-8011 (1)     | Tilt Lines Gp     |
442-8014 (2) | ||
387-8374 (3) | ||
1     | 453-1020 (1) (2)     | Grade Control Wiring Gp     |
453-1021 (3) | ||
16     | 7X-2563     | Bolt     |
1     | 7X-2553 (2) (3)     | Bolt     |
( 1 ) | XL |
( 2 ) | XW |
( 3 ) | LGP |
Angling Blade and Edge Groups     | ||
---|---|---|
Qty     | Part Number     | Description     |
1     | 433-0319 (1)     | Blade and Edge     |
1     | 433-0321 (2)     | Blade and Edge     |
1     | 433-0323 (3)     | Blade and Edge     |
( 1 ) | XL |
( 2 ) | XW |
( 3 ) | LGP |
Procedure for Shimming
- Remove all of the shims from C-frame (1) .
Illustration 1 | g00292740 |
- Remove excess rust and paint from the contact surfaces of these components: the C-frame, the cap and the shims.
- Install C-frame (1) and cap (2) on trunnion (3) without shims. Use the largest torque from the following list in order to tighten the bolts.
- Five percent of the specified torque
- 50 N·m (37 lb ft)
Maintain equal distance on both space (A) and space (B) of cap (2). Observe spaces (A) and (B) in order to determine the required number of shims.
- Five percent of the specified torque
- Loosen the bolts that are on cap (2). As needed, insert shims into spaces (A) and (B). When possible, use an equal number of shims for spaces (A) and (B) .
Note: The number of shims at space (A) must be within one of the number of shims at space (B). For example, if space (A) has eight shims, space (B) must have seven, eight, or nine shims.
- Add one additional shim to space (A). Add one additional shim to space (B) .
- Tighten the bolts that are on cap (2) to the proper torque.
- The C-frame should move freely on the trunnion. The specified minimum tolerance is 0.25 mm (0.010 inch).
Note: Removing one or more shims may be necessary after time. Wear can be caused by normal vibrations of the surface or variations in the thickness of the paint.
Installation of Trunnions (XL Undercarriage)
Necessary Parts
109-1352 Bulldozer Trunnion     | |||
---|---|---|---|
Item     | Qty     | Part Number     | Description     |
1     | 2     | 285-0852     | Trunnion     |
2     | 20     | 7X-2563     | Bolt     |
3     | 2     | -     | Guide Stud (1)     |
( 1 ) | Install guide studs with the same thread size and with a length of approximately 179 to 190 mm (7 to 7 1/2 inch). |
Installation Procedure
- Remove shipping cover (A) from the track roller frame.
Note: Remove paint from mating surfaces. Clean all the surfaces of the parts that will be installed.
Illustration 2 | g00613704 |
Note: The shipping covers must remain with the machine. If the trunnions are removed, install the shipping covers before you operate the machine.
- Install two guide studs (3) in the track roller frame, as shown.
Illustration 3 | g03629956 |
- Position trunnion (1) on the guide studs.
Illustration 4 | g00476283 |
- Install eight bolts of ten bolts (2) . Remove the two guide studs and install two remaining bolts (2). Tighten all bolts (2) to a torque of 530 ± 70 N·m (390 ± 50 lb ft).
- Repeat Steps 1 through 4 for the other side of the machine.
Installation of Trunnions (XW Undercarriage)
Necessary Parts
4Z-9412 Bulldozer Trunnion     | |||
---|---|---|---|
Item     | Qty     | Part Number     | Description     |
1     | 2     | 285-0852     | Trunnion     |
2     | 20     | 8C-8478     | Bolt     |
3     | 20     | 8T-4123     | Plated Washer (35 mm by 3.5 mm)     |
4     | 2     | 4Z-9228     | Plate     |
5     | 2     | -     | Guide Stud (1)     |
( 1 ) | Install guide studs with the same thread size and with a length of approximately 179 to 190 mm (7 to 7 1/2 inch). |
Installation Procedure
- Remove shipping cover (A) from the track roller frame.
Note: Remove paint from mating surfaces. Clean all the surfaces of the parts that will be installed.
Illustration 5 | g00613704 |
Note: The shipping covers must remain with the machine. If the trunnions are removed, install the shipping covers before you operate the machine.
- Install two guide studs (5) in the track roller frame, as shown.
Illustration 6 | g03629998 |
- Position plate (4) on the guide studs.
Illustration 7 | g00632460 |
- Position trunnion (1) on the guide studs.
- Install eight bolts of ten bolts (2) and eight washers of ten washers (3). Remove the two guide studs and install two remaining bolts (2) and washers (3). Tighten all bolts (2) to a torque of 530 ± 70 N·m (390 ± 50 lb ft).
- Repeat Steps 1 through 4 for the other side of the machine.
Installation of Trunnions (LGP Undercarriage)
Necessary Parts
109-1353 Bulldozer Trunnion Gp     | |||
---|---|---|---|
Item     | Part Number     | Description     | Qty     |
1     | 285-0852     | Trunnion     | 2     |
2     | 7X-2563     | Bolt     | 44     |
3     | 8T-4123     | Plated Washer (35 mm by 3.5 mm)     | 24     |
4     | 109-1354     | Support     | 2     |
5     | -     | Guide Stud (1)     | 2     |
( 1 ) | Install guide studs with the same thread size and with a length of approximately 179 to 190 mm (7 to 7 1/2 inch). |
Installation Procedure
- Install guide studs (5) in the track roller frame, as shown.
Illustration 8 | g00617547 |
Illustration 9 | g00617980 |
Note: Remove paint from mating surfaces. Clean all surfaces of the parts that will be installed.
- Position support (4) on guide studs (5) .
- First, install ten of twelve bolts (2) and washers (3) in support (4). Next, remove the two guide studs. Install remaining two bolts (2) and washers (3). Tighten bolts (2) to a torque of 530 ± 70 N·m (390 ± 50 lb ft).
Illustration 10 | g00617780 |
- Install guide studs (5) in support (4) .
Illustration 11 | g00617768 |
- Position trunnion (1) on guide studs (5), as shown.
- First, install eight of ten bolts (2). Then remove the guide studs. Install remaining two bolts (2). Tighten bolts (2) to a torque of 530 ± 70 N·m (390 ± 50 lb ft).
Illustration 12 | g00618089 |
- Repeat Steps 1 through 6 for the other side of the machine.
Install Tilt Lines to Blade
Necessary Parts
Angling Blade and Edge Groups     | |||
---|---|---|---|
Item     | Qty     | Part Number     | Description     |
1     | 1     | 433-0319 (1)     | Blade and Edge     |
1 | 433-0321 (2)     | Blade and Edge     | |
1 | 433-0323 (3)     | Blade and Edge     |
( 1 ) | XL |
( 2 ) | XW |
( 3 ) | LGP |
442-8011 Tilt Cylinder Lines Gp (1) 442-8014 Tilt Cylinder Lines Gp (2) 387-8374 Tilt Cylinder Lines Gp (3)     |
|||
---|---|---|---|
Item     | Qty     | Part Number     | Description     |
2     | 2     | 251-9840 (1) (2)     | Tube As     |
288-8480 (3) | |||
3     | 1     | 251-9841 (1) (2)     | Tube As     |
288-8481 (3) | |||
4     | 6     | 5S-8712     | Block     |
5     | 6     | 8T-4182     | Bolt     |
6     | 6     | 8T-4121     | Hard Washer     |
( 1 ) | XL |
( 2 ) | XW |
( 3 ) | LGP |
Install Procedure
- Raise and block the bulldozer blade (1) in an upright position.
Illustration 13 | g02326013 |
- Use six blocks (4), six washers (6), and six bolts (5) in order to install tube (3) and two tubes (2) to the blocks on the bulldozer blade. Tighten bolts (5) to a torque of 60 ± 12 N·m (45 ± 9 lb ft).
Illustration 14 | g03648976 |
Installing C-Frame
Necessary Parts
Angling Blade and Edge Groups     | |||
Item     | Qty     | Part Number     | Description     |
1     | 1     | 433-0319 (1)     | Blade and Edge     |
1 | 433-0321 (2)     | Blade and Edge     | |
1 | 433-0323 (3)     | Blade and Edge     | |
387-8324 Bulldozer Installation Ar (1) 433-0335 Bulldozer Installation Ar (2) 387-8373 Bulldozer Installation Ar (3)     |
|||
Item     | Qty     | Part Number     | Description     |
2     | 1     | 6Y-6751 (1)     | Pin     |
3     | 1     | 251-9829 (2)     | Retainer     |
4     | 1     | 7X-2557 (3)     | Bolt     |
387-8325 C-Frame Gp (1) 442-8008 C-Frame Gp (2) 334-1783 C-Frame Gp (3)     |
|||
Item     | Qty     | Part Number     | Description     |
5     | 1     | 1U-0725     | Retainer     |
6     | 2     | 7X-2562     | Bolt     |
7     | 1     | 251-9832     | Pivot Pin     |
8     | 1     | 387-8326 (1)     | C-Frame     |
442-8009 (2) | |||
334-1784 (3) | |||
9     | 52     | 4T-4866     | Shim     |
10     | 4     | 251-8203     | Square Nut     |
11     | 2     | 251-9836     | Bearing Cap     |
12     | 4     | 7X-2567     | Bolt     |
13     | 4     | 8T-4167     | Hard Washer     |
( 1 ) | XL |
( 2 ) | XW |
( 3 ) | LGP |
Install Procedure
- Raise and block the bulldozer blade (1) in an upright position.
Illustration 15 | g03649005 |
- Insert pivot pin (7) through C-frame (8). Install retainer (5) with two bolts (6) to pivot pin (7). Tighten bolts (6) to a torque of 530 ± 70 N·m (390 ± 50 lb ft).
Illustration 16 | g03649141 |
- Align C-frame (8) with the bulldozer blade. Use pin (2) and retainer (3) with bolt (4) in order to install pivot pin (7) to the bulldozer blade. Tighten bolt (4) to a torque of 270 ± 40 N·m (200 ± 30 lb ft)
Illustration 17 | g03649144 |
- Measure the height from the ground to the center of the trunnion on the roller frame.
Illustration 18 | g03649174 |
- Raise the rear center of C-frame (8) and block up the C-frame to the height that was measured in Step 9.
- Move the machine into position. The machine should be inside C-frame (8). Stop the engine.
- Use these components to install C-frame (8) to the trunnion: bearing cap (11), shims (9), two washers (13), two nuts (10) and two bolts (12). For instructions on shimming, refer to ""Procedure for Shimming" ". Tighten the bolts to a torque of 900 ± 100 N·m (665 ± 75 lb ft).
Illustration 19 | g03649182 |
- Repeat Step 7 for the other side of the machine.
- Remove the shipping brackets from the lift cylinders. Store the shipping bracket for future use.
Personal injury or death can result if the lift cylinder is not secured when the lift cylinder is being attached to the blade or detached from the blade. The lift cylinders can rotate freely rearward when the cylinder rod is retracted. Secure the lift cylinder until the cylinder rod is extended in order to prevent the lift cylinder from rotating rearward. |
Illustration 20 | g03649185 |
- Use the cap, the shims, the four bolts, and the four nuts to connect lift cylinder (B) to C-frame (8). Use 8E-9212 Shims as required to obtain a minimal clearance. Tighten the nuts to a torque of 460 ± 60 N·m (340 ± 40 lb ft).
- Repeat Steps 14 and 15 for the other side of the machine.
Note: Those parts that are not numbered are components of the lift cylinder.
- An improperly adjusted brace causes binding between the surface of pivot pin (7) and the surface of the bracket on the bulldozer blade. Check clearance (H) between pivot pin (7) and C-frame (8). This clearance check should be done with the blade on the ground and the braces should be pinned in the middle position. If clearance (H) is not in the 25 to 30 mm (1.0 to 1.2 inch) range, then adjust the push arms on both sides of the machine. See Illustration 21.
Illustration 21 | g03658059 |
Install Bulldozer Brace Gp
Necessary Parts
251-9814 Bulldozer Brace (1) 358-0111 Bulldozer Brace (2) 348-6701 Bulldozer Brace (3)     |
|||
---|---|---|---|
Item     | Qty     | Part Number     | Description     |
1     | 2     | 1U-1176     | Pin     |
2     | 2     | 3B-4626     | Cotter Pin     |
3     | 2     | 3J-1770     | Lock Pin     |
4     | 2     | 3J-6573     | Adjustment Screw     |
5     | 2     | 4F-0255     | Pin     |
6     | 2     | 4F-1252     | Pin     |
7     | 2     | 4T-5495     | Ball Stud     |
8     | 52     | 8E-5701     | Shim     |
9     | 2     | 160-6306     | Bearing Cap     |
10     | 2     | 227-0841     | Tilt Cylinder Gp     |
11     | 1     | 251-9815 (1)     | Arm As     |
358-0112 (2) | |||
348-6703 (3) | |||
12     | 1     | 251-9816 (1)     | Arm As     |
358-0113 (2) | |||
348-6702 (3) | |||
13     | 4     | 251-9828     | Bearing Cap     |
14     | 104     | 251-9834     | Shim     |
15     | 8     | 7X-2564     | Bolt     |
16     | 8     | 8T-4123     | Washer     |
17     | 4     | 8T-4187     | Bolt     |
18     | 8     | 8T-6381     | Bolt     |
387-8324 Bulldozer Installation Ar (1) 433-0335 Bulldozer Installation Ar (2) 387-8373 Bulldozer Installation Ar (3)     |
|||
19     | 4     | 251-9827     | Trunnion     |
20     | 16     | 7X-2563     | Bolt     |
( 1 ) | XL |
( 2 ) | XW |
( 3 ) | LGP |
Install Procedure
- Apply a heavy coat of multipurpose grease to the threaded surfaces on adjustment screw (4) .
Note: The trunnion and cap in illustration 22 is installed in the next steps.
Illustration 22 | g03649541 |
- Adjust push arm (11) or (12) to dimension (C) with adjustment screw (4). See Illustration 23.
Note: The dimensions that are shown in Illustration 23 are without the caps or the shims. The measurement is from one edge to the other edge.
Illustration 23 | g03649543 |
(C) 2045 mm (80.5 inch) for the S/N:LGP bulldozer (C) 1875 mm (73.8 inch) for the S/N:XW bulldozer (C) 1737 mm (68.4 inch) for the S/N:XL (29) Push arm (34) Adjustment screw |
- Use cap (13), shims (14), and four bolts (15) to install trunnion (19) to push arm (11) or (12). Refer to ""Procedure for Shimming" " for instructions on shimming. Tighten bolts (15) to a torque of 530 ± 70 N·m (390 ± 50 lb ft).
Illustration 24 | g03649545 |
- Install push arm (11) or (12) to bulldozer blade with four bolts (20). Tighten bolts (20) to a torque of 530 ± 70 N·m (390 ± 50 lb ft).
Illustration 25 | g03649556 |
- Repeat Steps 18 through 1 for the other side of the machine.
- Use cap (9), shims (8), and two bolts (17) to install ball stud (7) on push arm (11) or (12). Refer to ""Procedure for Shimming" " for instructions on shimming. Tighten bolts (17) to a torque of 530 ± 70 N·m (390 ± 50 lb ft).
Illustration 26 | g03649562 |
- Use pin (3) and pin (6) to install push arm (11) or (12) with ball stud (7) to the C-frame.
Illustration 27 | g03649573 |
- Repeat Steps 6 and 7 for the other side of the machine.
Install Tilt Cylinders and Tilt Cylinder Lines
Necessary Parts
442-8011 Tilt Cylinder Lines Gp (1) 442-8014 Tilt Cylinder Lines Gp (2) 387-8374 Tilt Cylinder Lines Gp (2)     |
|||
Item     | Qty     | Part Number     | Description     |
1     | 6     | 5S-8712     | Block     |
2     | 1     | 5S-8765 (1) (2)     | Guard     |
288-8473 (3) | |||
3     | 1     | 5S-8766 (1) (2)     | Guard     |
288-8472 (3) | |||
4     | 1     | 6Y-0596     | Guard As     |
5     | 1     | 6Y-0597     | Guard As     |
6     | 2     | 9W-9082 (1)     | Hose As     |
4Z-9463 (2) | |||
308-0487 (3) | |||
7     | 2     | 9W-9083     | Hose As     |
4Z-9464 (2) | |||
308-0486 (3) | |||
8     | 1     | 245-4230     | Bracket As     |
9     | 1     | 245-4231     | Bracket As     |
10     | 2     | 251-9840 (1) (2)     | Tube As     |
288-8480 (3) | |||
11     | 1     | 251-9841 (1) (2)     | Tube As     |
288-8481 (3) | |||
12     | 1     | 442-8033     | Guard As     |
13     | 1     | 442-8034     | Plate As     |
14     | 1     | 453-4748 (1) (2)     | Hose As     |
433-0340 (3) | |||
15     | 1     | 453-6065 (1) (2)     | Hose As     |
453-6114 (3) | |||
16     | 2     | 3G-8047     | Grommet     |
17     | 2     | 3G-8054     | Clip     |
18     | 2     | 3G-8057     | Clip     |
19     | 12     | 4J-5267     | O-Ring Seal     |
20     | 2     | 5P-7464     | Clip     |
21     | 2     | 5P-7465     | Clip     |
22     | 2     | 6V-1249     | Grommet     |
23     | 20     | 8C-3205     | Half Flange     |
24     | 52 (1) (2) 50 (3)     |
8T-4121     | Hard Washer     |
25     | 10     | 8T-4139     | Bolt     |
26     | 6     | 8T-4182     | Bolt     |
27     | 46 (1) (2) 44 (3)     |
8T-4195     | Bolt     |
28     | 16 (1) (2) 18 (3)     |
8T-4223     | Hard Washer     |
29     | 6     | 8T-4910     | Bolt     |
387-8324 Bulldozer Installation Ar (1) 433-0335 Bulldozer Installation Ar (2) 387-8373 Bulldozer Installation Ar (3)     |
|||
Item     | Qty     | Part Number     | Description     |
30     | 4     | 251-9827     | Trunnion     |
31     | 16     | 7X-2563     | Bolt     |
251-9814 Bulldozer Brace (1) 358-0111 Bulldozer Brace (2) 348-6701 Bulldozer Brace (3)     |
|||
Item     | Qty     | Part Number     | Description     |
32     | 2     | 227-0841     | Tilt Cylinder Gp     |
33     | 4     | 251-9828     | Bearing Cap     |
34     | 104     | 251-9834     | Shim     |
35     | 8     | 8T-4123     | Washer     |
36     | 8     | 8T-6381     | Bolt     |
37     | 1     | 251-9815 (1)     | Arm As     |
358-0112 (2) | |||
348-6703 (3) | |||
38     | 1     | 251-9816 (1)     | Arm As     |
358-0113 (2) | |||
348-6702 (3) | |||
39     | 2     | 1U-1176     | Pin     |
40     | 2     | 4F-0255     | Pin     |
41     | 2     | 3B-4626     | Cotter Pin     |
( 1 ) | XL |
( 2 ) | XW |
( 2 ) | LGP |
Install Procedure
- Use O-ring seal (19), two flanges (23), four washers (24), and four bolts (52) to connect hose (6) and hose (7) to the tilt cylinder. Drain the oil from the tilt cylinder. Tighten bolts (27) to a torque of 60 ± 12 N·m (45 ± 9 lb ft).
Illustration 28 | g03649894 |
- Repeat Step 10 for the other cylinder.
- Extend tilt cylinder (32) in order to allow the clearance of bolt (36) .
Illustration 29 | g03649900 |
- Use bearing cap (33), shims (34), four washers (35), and four bolts (36) to install trunnion (30) to tilt cylinder (32). Refer to ""Procedure for Shimming" " for instructions on shimming. Tighten bolts (36) to a torque of 530 ± 70 N·m (390 ± 50 lb ft).
Illustration 30 | g03649904 |
- Install tilt cylinder (32) to the bulldozer blade with four bolts (31). Tighten bolts (31) to a torque of 530 ± 70 N·m (390 ± 50 lb ft).
- Use pin (39), pin (40), and cotter (41) to install the other end of tilt cylinder (32) on push arm (37) or (38). Extend tilt cylinder (32) to approximately 1315 mm (52.0 inch). This measurement is between the center of the eye at the head end to the center of the eye at the rod end.
Illustration 31 | g03649908 |
- Repeat Step 15 for the opposite side of the machine.
- Use O-ring seal (19), two flanges (23), four hard washers (24), and four bolts (27) to connect hose (7) to tube (11) on the bulldozer blade. Tighten bolts (27) to a torque of 60 ± 12 N·m (45 ± 9 lb ft).
Illustration 32 | g03649910 |
- Use O-ring seal (19), two flanges (23), four hard washers (24), and four bolts (27) to connect hose (6) to tube (10) on the bulldozer blade. Tighten bolts (27) to a torque of 60 ± 12 N·m (45 ± 9 lb ft).
- Repeat Steps 10 through 18 for the other side of the machine.
- Use three hard washers (28) and three bolts (25) to install guards (4) and (5) to the tilt cylinder. Tighten bolts (25) to a torque of 105 ± 20 N·m (75 ± 15 lb ft).
Illustration 33 | g03649923 |
Refer to Illustration 33 for the left side. |
Illustration 34 | g03649924 |
Refer to Illustration 34 for the right side. |
- Use hard washer (28) and bolt (25) to install brackets (8) and (9) to guards (4) and (5) and to the tilt cylinder. Tighten bolt (25) to a torque of 105 ± 20 N·m (75 ± 15 lb ft).
- Install grommet (22) to hose (6). Use hard washer (28) and bolt (25) to install clips (20) and (21) to grommet (22) and brackets (8) and (9). Tighten bolt (25) to a torque of 105 ± 20 N·m (75 ± 15 lb ft).
- Use two O-ring seals (19) to connect hoses (14) and (15) to each tube (10) .
Illustration 35 | g03649929 |
- Install grommet (16), clip (17), and clip (18) to hoses (14) and (15). Use two hard washers (21) and two bolts (27) to install the clips to C-frame. Tighten bolts (27) to a torque of 60 ± 12 N·m (45 ± 9 lb ft).
- Use six hard washers (28) and six bolts (29) to install guard (3), center guard (12), and guard (2) to the blocks on the bulldozer blade. Tighten bolts (29) to a torque of 105 ± 20 N·m (75 ± 15 lb ft).
Illustration 36 | g03658072 |
- Remove the covers from the manifold on the radiator guard. Use two O-ring seals (19), four flanges, eight washers, and eight bolts to connect hoses (14) and (15) to the manifold on the radiator guard. Tighten the bolts to a torque of 60 ± 12 N·m (45 ± 9 lb ft). The items that are not numbered are part of the tilt cylinder lines.
Illustration 37 | g03649971 |
(F) Top Port (G) Bottom Port |
Illustration 38 | g03658749 |
(A) 15° |
- Check the oil in the hydraulic tank. Add oil, if necessary. Cycle the cylinders through several full strokes in both directions in order to purge air from the lines and from the cylinders. Refill the hydraulic tank to the full mark.
- After you have completed this procedure, prepare the machine for operation. Refer to the machine Operation and Maintenance Manual for instructions.
Installation of Access/Egress Step
Components for Step Installation     | |||
---|---|---|---|
Item     | Part Number     | Description     | Qty     |
1     | 349-6055     | Plate As     | 2     |
2     | 8T-4956 (1)     | Bolt     | 8     |
3     | 7X-3391 (2)     | Washer     | 8     |
( 1 ) | Previous models used 8T-4196 Bolt . |
( 2 ) | Previous models used 4H-1225 Washer . |
- Remove threaded hole plugs.
- Chase the threaded hole.
- Use plate assembly (1), four bolts (2), and four washers (3) to assemble the right push arm step.
Illustration 39 | g03243579 |
- Repeat Step 3 for the other side of the push arm.
Installing Stable Blade Control
Necessary Parts
434-9075 Grade Control Wiring Gp     | |||
---|---|---|---|
Item     | Qty     | Part Number     | Description     |
1     | 1     | 390-2881     | Box Gp     |
2     | 1     | 434-3116     | Plate As     |
3     | 1     | 457-1559     | Harness As     |
4     | 1     | 5P-7466     | Clip     |
5     | 1     | 5p-7467     | Clip     |
6     | 1     | 5P-8112     | Grommet     |
7     | 3     | 8T-4183     | Bolt     |
8     | 3     | 8T-4223     | Hard Washer     |
390-2881 Box Gp     | |||
---|---|---|---|
Item     | Qty     | Part Number     | Description     |
9     | 1     | 336-9655     | Sensor     |
10     | 1     | 392-9197     | Bracket As     |
11     | 1     | 132-5789     | Clip     |
12     | 2     | 5C-2890     | Nut     |
13     | 2     | 9X-8256     | Washer     |
14     | 1     | 7K-1181     | Cable Strap     |
15     | 8     | 8T-4136     | Bolt     |
16     | 12     | 8T-4121     | Hard Washer     |
17     | 2     | 8C-3206     | Half Flange     |
18     | 4     | 8T-4186     | Bolt     |
19     | 1     | 392-9198     | Cover     |
20     | 1     | 353-7956     | Grommet     |
21     | 1     | 7K-1181     | Cable Strap     |
Box Group Assembly
- Install sensor (9) to bracket assemble (10) using two washers (13) and two nuts (12). Tighten nuts to a torque of 12 ± 3 N·m (9 ± 2 lb ft).
Illustration 40 | g03717161 |
Installing Stable Blade Control
- Install box group (1) using four washers (16), and four bolts (17) .
Illustration 41 | g03746950 |
- Install clip (11) and secure using cable strap (14) .
Illustration 42 | g03717188 |
- Connect harness assembly (3) to existing harness assembly (J) .
Illustration 43 | g03727756 |
Note: Remove 439-5510 Plug As from radiator guard harness before connecting stable blade harness.
- Install clip (4), clip (5), and grommet (6) on harness assembly (3). Secure harness assembly (3) using plate assembly (2), three washers (8), and three bolts (7) .
Illustration 44 | g03648506 |
- When installing harness assembly (3), position harness assembly (3) to dimension (H) .
Illustration 45 | g03652976 |
(H) 30° |
- Install harness assembly (3). Install two flanges (17), four bolts (18), and four washers (16). Install grommet (20) and secure using cable strap (21) .
Illustration 46 | g03746952 |
- Install cover (19) using four washers (16), and four bolts (15) .
Illustration 47 | g03746955 |
- Orient harness assembly (3) as shown in Illustration 48 with coupling facing towards the front of the machine. Secure harness assembly (3) to the machine using existing flanges, washers, and bolts.
Illustration 48 | g03727779 |
- Check the oil level in the hydraulic tank. If necessary, fill the hydraulic tank. Cycle the cylinders to full stroke in both directions in order to purge air from the lines and from the cylinders. Check the level in the hydraulic tank again. Refill the hydraulic tank to the "FULL" mark.
- After assembly is complete, prepare the machine for operation. Refer to the Operation and Maintenance Manual for instructions.
Note: Stable blade option must be activated using the "Display" or "Electronic Technician" for the function to work.