Main Control Valve - Install
Show/hide table
Required Tools | |||
---|---|---|---|
Tool | Part Number | Part Description | Qty |
A | 138-7575 | Link Bracket | 1 |
- Check the condition of the O-ring seals on the ends of the hose assemblies. If any O-ring seals are damaged, use new parts for replacement. Lubricate the O-ring seals with clean hydraulic oil.
Show/hide table
Illustration 1 g00401406 Show/hide tableIllustration 2 g00401408 - Attach Tooling (A), a hoist and a suitable lifting sling to main control valve (5).
- Carefully install main control valve (5). The weight of the main control valve is
100 kg (220 lb) .Show/hide tableIllustration 3 g00401402 Left Side Show/hide tableIllustration 4 g00401403 Right Side - Install three mounting bolts (6).
- Connect eleven hose assemblies to main control valve (5).
- Connect cable (4) to hoist control lever (3).
- Fill the implement hydraulic tank with oil. For the correct procedure, refer to the Operation and Maintenance Manual for your machine.
- Start the engine and check for leaks. Check for proper operation of the implement hydraulics.
Show/hide table
Illustration 5 g00400599 - Install cover assembly (2) on both sides of the front frame.
Show/hide table
Illustration 6 g00400598 - Close access door (1).
End By:
- Separate the steering frame lock. Refer to Disassembly and Assembly, "Steering Frame Lock - Separate and Connect".
Caterpillar Information System:
854G Wheel Dozer Machine Systems Main Control Valve - Remove
613C Series II Wheel Tractor-Scraper Machine Systems Air/Hydraulic Cylinder (Brake) - Disassemble
854G Wheel Dozer Machine Systems Quick-Drop Valve - Assemble
637E Series II Wheel Tractor-Scrapers Fan Drive Bearing and Belt Tightener - Lubricate
854G Wheel Dozer Machine Systems Quick-Drop Valve - Disassemble
3176C and 3196 Industrial Engines Atmospheric Pressure Sensor
613C Series II Wheel Tractor-Scraper Machine Systems Quick-Release Valve (Brake) - Remove and Install
854G Wheel Dozer Machine Systems Quick-Drop Valve - Install
902 and 906 Compact Wheel Loaders Power Train System Piston Motor (Hydrostatic)
854G Wheel Dozer Machine Systems Quick-Drop Valve - Remove
854G Wheel Dozer Machine Systems Tilt Control Valve (Dual) - Assemble
854G Wheel Dozer Machine Systems Tilt Control Valve (Dual) - Disassemble
IT14G Integrated Toolcarrier Fire Extinguisher Location
994D Wheel Loader Power Train Filter (Power Train)
854G Wheel Dozer Machine Systems Lift Cylinder Mounting - Remove and Install
992G Wheel Loader and 854G Wheel Dozer Steering System Limit Switch (STIC Lockout Control) - Adjust
990 Wheel Loader, 990 Series II Wheel Loader and 844 Wheel Dozer Power Train Wheel Bearings - Adjust
994D Wheel Loader Power Train Pressure Sensor (Impeller Clutch Oil)
966G Wheel Loader and 972G Wheel Loader Machine Systems Diverter Valve (Ride Control) - Remove
992G Wheel Loader and 854G Wheel Dozer Power Train Wheel Bearings - Adjust
Field Installation of the Hystat Joystick Effort and Modulation Springs{5059} Field Installation of the Hystat Joystick Effort and Modulation Springs{5059}
631E Series II Wheel Tractor-Scrapers Cooling System Coolant (DEAC) - Change
613C Series II Wheel Tractor-Scraper Machine Systems Air/Hydraulic Cylinder (Brake) - Assemble
994D Wheel Loader Power Train Transmission Planetary