Introduction

This Special Instruction provides the necessary procedure for installing final drive seal guards on D8N, D9N, and D10N Tractors. The seal guard design has a secondary seal to prevent debris from entering the Duo-Cone seal area. The close fit and tolerances limit the size of the debris that can enter the labyrinth to 2 mm (.08 in). The labyrinth changes the direction of the debris four times before it contacts the secondary seal. This reduces the damage caused by the ability to pack debris and string like material into the final drive Duo-Cone seal area.

The cavity between this secondary seal and the Duo-Cone seal is filled with a lithium type multipurpose grease. The cavity can be flushed to remove any contaminants which have passed by the secondary seal. Grease is pumped into the cavity between the secondary seal and Duo-Cone seals at installation. The grease fitting and vent hole are then plugged. The grease becomes a barrier to water, mud, and debris.

The secondary seal can be replaced at the normal maintenance period, without removing the final drive. The secondary seal is held in place by a captive flange that can be removed. This allows the replacement of the secondary seal without removing the final drive. The secondary seal has a split that allows the seal to be placed over the spindle.

After the assembly is complete, prepare the machine for service as shown in the machine's Operation & Maintenance Manual.

Do not perform any procedure, outlined in this publication, or order any parts until you read and understand the information contained within.


NOTICE

When a hoist is used to lift any part or assembly, stand clear of the area. Always make sure the hoist has the correct capacity. Approximate weights of the components are shown in the machine's Service Manual.


Reference: Disassembly and Assembly Service Manual module, Parts Manual, Operation & Maintenance Manual, and Special Instruction SEHS8364; "Assembly and Installation of Conventional Duo-Cone Seals".

------ WARNING! ------

Do not attempt to assemble this machine until you have read and understand the assembly instructions. Improper procedures could result in injury or death.

-------WARNING!-------

Installation Procedure

------ WARNING! ------

Sudden movement of the machine can cause injury to persons on or near the machine. To prevent possible injury, do the procedure that follows before working on the machine.

-------WARNING!-------
* Permit only one operator on the machine. Keep all other personnel away from machine or in view of the operator.
* Move the machine to a hard, level surface. Move away from working machines and personnel.
* Engage the parking brake.
* Stop the engine.

Necessary Parts

Disassembly Procedure (All Models)

NOTE: Refer to the Disassembly and Assembly Service Manual module for your machine to remove the final drives.

1. Remove the final drives from the machine.

2. Disassemble the final drives.

3. Remove the original guards from the spindle and sprocket hubs (see the modification procedures).

D8N Modification Procedure


(H) 7T8001 Hub (part of 1Q2257 Spindle).

Machine hub (H) to dimensions shown in Chart 1.

NOTE: If hub (H) has been modified, it is necessary to machine or air-arc off the former guard.


(U) 9W3374 Hub (part of 1Q2258 Sprocket Hub).

Machine hub (U) to dimensions shown in Chart 2.

NOTE: If hub (U) has not been modified, additional machining is required (prior machining does not affect this installation).

D8N Assembly Procedure

------ WARNING! ------

Do not flame cut or weld on painted areas. The effect of gasses from burned paint is a danger to the person doing the cutting or welding.

-------WARNING!-------

1. Heat sprocket hub guard (2) to a minimum of 121°C (250°F) before pressing into position on sprocket hub (BB).

2. Press sprocket hub guard (2) into position on sprocket hub (BB).

NOTE: Do not weld sprocket hub guard (2) to sprocket hub.

3. Place retainer (3) over spindle (AA).

NOTE: Step 3 must be done before spindle guard (1) is pressed into position on spindle (AA).

4. Heat spindle guard (1) to a minimum of 121°C (250°F) before pressing into position on spindle (AA).

5. Preheat spindle (AA) to 121°C (250°F). Weld at area (DD) all around spindle (AA) with a 5 mm (.2 in) v-groove weld.

6. Assemble the final drive. Refer to the Disassembly and Assembly Service Manual module for assembly of the final drive.

7. Assemble seal (4) (with multipurpose lithium grease on the lip of the seal) to sprocket hub guard (2) and spindle guard (1).

NOTE: Seal (4) must be positioned with the split in the 12 o'clock position, as seen with the final drive installed.

8. Apply 7M7260 Liquid Gasket to the mating surfaces of sprocket hub guard (2) and retainer (3).

9. Assemble retainer (3) to sprocket hub guard (2) with 12 washers (5) and 12 bolts (6). Use 2P2506 Anti-seize Compound on bolt threads.

NOTE: Clearance at (CC) should be 2.00 mm (.079 in).

10. Install fitting (grease) (8) into either vent hole in sprocket hub guard (2).

11. Fill (slowly to prevent Duo-Cone seal displacement) with 2P9066 Multipurpose Lithium Grease until the grease comes out the open (second) vent hole.

12. Remove fitting (grease) (8). Install two plugs (7) to sprocket hub guard (2).

13. Repeat the assembly procedure for the other final drive.


NOTICE

Field maintenance: Recommended flushing is every 500 hours minimum. When filling the cavity with multipurpose lithium grease, fill the cavity until the appearance of the grease coming out of the open (vent) hole is clear (clean).


D9N Modification Procedure


(F) 7T3690 Hub (part of 1Q2255 Spindle).

Machine hub (F) to dimensions shown in Chart 3.

NOTE: If hub (F) has been modified, it is necessary to machine or air-arc off the former guard.


(T) 7T3691 Hub (part of 1Q2256 Sprocket Hub).

Machine hub (T) to dimensions shown in Chart 4.

NOTE: If hub (T) has not been modified, additional machining is required (prior machining does not affect this installation).

D9N Assembly Procedure

------ WARNING! ------

Do not flame cut or weld on painted areas. The effect of gasses from burned paint is a danger to the person doing the cutting or welding.

-------WARNING!-------

1. Heat spindle guard (1) to a minimum of 121°C (250°F) before pressing into position on spindle (AA).

2. Press spindle guard (1) into position on spindle (AA).

3. Preheat spindle (AA) to 121°C (250°F). Weld at area (DD) all around spindle (AA) with a 5 mm (.2 in) v-groove weld.

4. Place retainer (3) over sprocket hub (BB).

NOTE: Step 4 must be done before sprocket hub guard (2) is pressed into position on sprocket hub (BB).

5. Heat sprocket hub guard (2) to a minimum of 121°C (250°F) before pressing into position on sprocket hub (BB).

NOTE: Do not weld sprocket hub guard (2) to sprocket hub (BB).

6. Assemble the final drive. Refer to the Disassembly and Assembly Service Manual module for assembly of the final drive.

7. Assemble seal (4) (with multipurpose lithium grease on the lip of the seal) to spindle guard (1) and sprocket hub guard (2).

NOTE: Seal (4) must be positioned with the split in the 12 o'clock position, as seen with the final drive installed.

8. Apply 7M7260 Liquid Gasket to the mating surfaces of spindle guard (1) and retainer (3).

9. Assemble retainer (3) to spindle guard (1) with 16 washers (5) and 16 bolts (6). Use 2P2506 Anti-seize Compound on bolt threads.

NOTE: Clearance at (CC) should be 2.00 mm (.079 in).

10. Install fitting (grease) (8) into either vent hole in sprocket hub guard (2).

11. Fill (slowly to prevent Duo-Cone seal displacement) with 2P9066 Multipurpose Lithium Grease until the grease comes out the open (second) vent hole.

12. Remove fitting (grease) (8). Install two plugs (7) to spindle guard (1).

13. Repeat the assembly procedure for other final drive.


NOTICE

Field maintenance: Recommended flushing is every 500 hours minimum. When filling the cavity with multi-purpose lithium grease, fill the cavity until the appearance of the grease coming out of the open (vent) hole is clear (clean).


D10N Modification Procedure


(F) 7T5483 Hub (part of 1Q2371 Spindle).

Machine hub (F) to dimensions shown in Chart 5.

NOTE: If hub (F) has been modified, it is necessary to machine or air-arc off the former guard.


(T) 7T5484 Hub (part of 1Q2369 Sprocket Hub).

Machine hub (T) to dimensions shown in Chart 6.

NOTE: If hub (T) has not been modified, additional machining is required (prior machining does not affect this installation).

D10N Assembly Procedure

------ WARNING! ------

Do not flame cut or weld on painted areas. The effect of gasses from burned paint is a danger to the person doing the cutting or welding.

-------WARNING!-------

1. Heat spindle guard (1) to a minimum of 121°C (250°F) before pressing into position on spindle (AA).

2. Press spindle guard (1) into position on spindle (AA).

3. Preheat spindle (AA) to 121°C (250°F). Weld at area (DD) all around spindle (AA) with a 5 mm (.2 in) v-groove weld.

4. Place retainer (3) over sprocket hub (BB).

NOTE: Step 4 must be done before sprocket hub guard (2) is pressed into position on sprocket hub (BB).

5. Heat sprocket hub guard (2) to a minimum of 121°C (250°F) before pressing into position on sprocket hub (BB).

NOTE: Do not weld sprocket hub guard (2) to sprocket hub (BB).

6. Assemble the final drive. Refer to the Disassembly and Assembly Service Manual module for assembly of the final drive.

7. Assemble seal (4) (with multipurpose lithium grease on the lip of the seal) to spindle guard (1) and sprocket hub guard (2).

NOTE: Seal (4) must be positioned with the split in the 12 o'clock position, as seen with the final drive installed.

8. Apply 7M7260 Liquid Gasket to the mating surfaces of spindle guard (1) and retainer (3).

9. Assemble retainer (3) to spindle guard (1) with 16 washers (5) and 16 bolts (6). Use 2P2506 Anti-seize Compound on bolt threads.

NOTE: Clearance at (CC) should be 2.00 mm (.079 in).

10. Install fitting (grease) (8) into either vent hole in sprocket hub guard (2).

11. Fill (slowly to prevent Duo-Cone seal displacement) with 2P9066 Multipurpose Lithium Grease until the grease comes out the open (second) vent hole.

12. Remove fitting (grease) (8). Install two plugs (7) to spindle guard (1).

13. Repeat the assembly procedure for other final drive.


NOTICE

Field maintenance: Recommended flushing is every 500 hours minimum. When filling the cavity with multi-purpose lithium grease, fill the cavity until the appearance of the grease coming out of the open (vent) hole is clear (clean).


Caterpillar Information System:

3306 Cylinder Head To Block Joint Repair Procedure{1124, 1101, 1201} 3306 Cylinder Head To Block Joint Repair Procedure{1124, 1101, 1201}
3400 Cylinder Head To Block Joint Repair Procedure{1124} 3400 Cylinder Head To Block Joint Repair Procedure{1124}
Using the 9U6463 Hone Group and Attachments{0673, 7562} Using the 9U6463 Hone Group and Attachments{0673, 7562}
Installation of 3P0984 Wiring Harness{1400} Installation of 3P0984 Wiring Harness{1400}
Installation of Rear Access Steps for 992C Wheel Loader{7254} Installation of Rear Access Steps for 992C Wheel Loader{7254}
Reinforcement To The Scraper Bowl Sides{6201} Reinforcement To The Scraper Bowl Sides{6201}
Installation of No. 8 Ripper (1FH, 1GH){6311, 6312} Installation of No. 8 Ripper (1FH, 1GH){6311, 6312}
Installation of 8SU (6LH, 9BH) and 8U (6AH, 9CH) Bulldozer{6051, 6053} Installation of 8SU (6LH, 9BH) and 8U (6AH, 9CH) Bulldozer{6051, 6053}
Installation Of 8A (6NH) Bulldozer{6052} Installation Of 8A (6NH) Bulldozer{6052}
Installation of Swing Dampening Valve{5480, 5450} Installation of Swing Dampening Valve{5480, 5450}
Installation of Wheel Loader Payload Measurement System{7494} Installation of Wheel Loader Payload Measurement System{7494}
992D Wheel Loader-Truck Shipment Assembly Procedure{7500} 992D Wheel Loader-Truck Shipment Assembly Procedure{7500}
Procedure To Modify Track Roller Frame Guiding Guards For Heavy Duty Track Or Rotating Bushing Track Application{7152} Procedure To Modify Track Roller Frame Guiding Guards For Heavy Duty Track Or Rotating Bushing Track Application{7152}
3500 Electronic Unit Injection (EUI) Fuel Priming Procedure{1250, 1258} 3500 Electronic Unit Injection (EUI) Fuel Priming Procedure{1250, 1258}
Push Frame Reinforcement{6225} Push Frame Reinforcement{6225}
Installation Of Additional Clips To The Suspension Group{7218} Installation Of Additional Clips To The Suspension Group{7218}
Skidder Articulated Hitch Pin Bore Rebuilding{7057} Skidder Articulated Hitch Pin Bore Rebuilding{7057}
Installation of 7E-6310, 9X-3294, 6N-9125, 7E-5244 and 3T-8724 Jacket Water Heater Groups{1383} Installation of 7E-6310, 9X-3294, 6N-9125, 7E-5244 and 3T-8724 Jacket Water Heater Groups{1383}
Fabricating Fiber/Rubber Strips For Radiator Air Baffle Group{7272} Fabricating Fiber/Rubber Strips For Radiator Air Baffle Group{7272}
Autoshift Kit Installation{3168} Autoshift Kit Installation{3168}
Retrofit Installation of Coolant Loss Sensor{1353, 1395, 7422, 7470} Retrofit Installation of Coolant Loss Sensor{1353, 1395, 7422, 7470}
Servicing Deutsch HD and DT style connectors{1408} Servicing Deutsch HD and DT style connectors{1408}
Converting Folded Core Radiator to Improved Multirow Radiator{1353} Converting Folded Core Radiator to Improved Multirow Radiator{1353}
Installation of 0R3950 and 0R3960 3508 (MUI) Remanufactured Engines in D11N Tractors{1200} Installation of 0R3950 and 0R3960 3508 (MUI) Remanufactured Engines in D11N Tractors{1200}
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.