Removal Procedure
Required Tools     | |||
---|---|---|---|
Tool     | Part Number     | Part Description     | Qty     |
(A)     | 8S-7611     | Tube Assembly     | 2     |
8S-7615 | Pin     | 2     | |
8S-7640 | Stand     | 2     | |
(B)     | FT-1310     | Track Roller Lifting Fork     | 1     |
Note: There is a track guide on each side of the machine. The procedure that follows is for the removal of the track roller with the track guide.
- Start the engine. Park the machine on a hard, level surface. Stop the engine.
- Release the tension on the track. Loosen relief valve (1) by one turn only. If the track does not loosen after opening the relief valve, move the machine forward and backward until the tension is released.
Personal injury or death can result from grease and oil coming out of the relief valve. Grease and oil are under high pressure coming out of the relief valve and can penetrate the body. Do not watch the relief valve to see if grease is escaping. Watch the track or track adjustment cylinder to see if the track is being loosened. Make sure the vent holes are clean before the tension is released on the track. |
Illustration 1 | g00489342 |
- Lift the side of the machine. Install Tooling (A) under the undercarriage, as shown.
Illustration 2 | g00489826 |
Note: Adjust the height of Tooling (A) in order to have sufficient clearance for the removal of the track rollers when Tooling (A) is installed under the undercarriage of the machine.
- Loosen the four bolts that hold track guide (2) to the undercarriage.
Note: Do not remove the bolts at this time.
Illustration 3 | g00664654 |
- Fasten a hoist to Tooling (B). Put Tooling (B) in position under track guide (2), as shown. Remove the bolts that secure the track guide. Remove the track guide.
Illustration 4 | g00664663 |
- Remove the rock guards from the undercarriage, if equipped.
Illustration 5 | g00664665 |
(X) Rock guard |
- Loosen the four bolts that secure track roller (3) to the undercarriage.
Note: Do not remove the bolts at this time.
Illustration 6 | g00664675 |
- Fasten a hoist and a lifting strap to Tooling (B) .
- Put Tooling (B) in position under track roller (3), as shown.
- Remove the bolts that secure the track roller. Remove the track roller.
- For Type "A" excavators, the weight of the track roller is approximately 34 kg (75 lb).
- For Type "B" excavators, the weight of the track carrier roller is approximately 41 kg (90 lb).