Disassembly Procedure For The Final Drive On CIPI Undercarriage Arrangements Which Are Based On 325 and 325B Track Type Excavators

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
A     1P-2420     Transmission Repair Stand     1    
B     138-7573     Link Bracket     2    
C     1P-1860     Retaining Ring Pliers     1    
D     6B-6682     Full Nut     1    
1P-5546 Crossblock     1    
5P-8248 Hard Washer     4    
6V-3142 Plate     1    
 (1) Threaded Rod     1    
 (2) Spacer     4    
E     138-7574     Link Bracket     2    
F     8B-7561     Step Plate     1    
5F-7465 Puller Gp     1    
1H-3107 Push-Puller Tool Gp     1    
1H-3112 Bearing Cup Puller Gp     1    
1P-5551 Adjustable Screw Assembly     1    
( 1 ) The 16 NF threaded rod is 280 mm (11 inch) long × 19 mm (0.75 inch) in diameter.
( 2 ) The spacer's outer diameter is 64 mm (2.5 inch). The spacer's inner diameter is 25.4 mm (1.0 inch). The spacer's thickness is 6.4 mm (.25 inch).

Start By:

  1. Remove the final drive. Refer to Disassembly and Assembly, "Final Drive - Remove" in this manual.

  1. Thoroughly clean the outside of the final drive prior to disassembly.

  1. Put an alignment mark across the sections of the final drive for assembly purposes. The parts must be reinstalled in the part's original locations.



    Illustration 1g00511587

  1. Fasten the final drive to Tool (A), as shown. The combined weight of the final drive and final drive sprocket is approximately 361 kg (795 lb).

  1. Remove 20 bolts (1) and the washers that secure the cover to the final drive.



    Illustration 2g00511600

  1. Use a soft faced hammer and break the seal between cover (2) and the ring gear. Fasten Tool (B) and a hoist to cover (2), as shown. Remove the cover. The weight of the cover is approximately 32 kg (70 lb).



    Illustration 3g00511631

  1. Remove thrust plate (5) from the cover.

  1. Remove 12 socket head bolts (3) and ring gear (4) from the cover.



    Illustration 4g00511636

  1. Remove sun gear (6). Remove carrier assembly (7) by lifting the carrier assembly straight up. The weight of the carrier assembly is approximately 14 kg (30 lb).



    Illustration 5g00511640



    Illustration 6g00572334

    Note: Two spacers (8) are used with carrier assembly (7). One of the spacers fits on the top side of carrier assembly (7). The other spacer (8) is located in the carrier of carrier assembly (15) .

  1. Remove spacer (8) from carrier assembly (7) .

    Note: Planetary gears (11) might have oil grooves "L". Note the position of the oil grooves in relation to the carrier for assembly purposes.

  1. Remove retaining ring (9) with Tool (C). Remove two thrust washers (10) and planetary gear (11) from the carrier. Remove bearing (12) from the planetary gear.

  1. Repeat Step 10 in order to remove the other two planetary gears from the carrier.



    Illustration 7g00511653

  1. Use a screwdriver, and remove retaining ring (13) from the carrier. Remove sun gear (14) from the carrier.



    Illustration 8g00511661

  1. Use two people in order to remove carrier assembly (15). Remove the carrier assembly by pulling the carrier assembly straight up. The weight of the carrier assembly is approximately 25 kg (55 lb).



    Illustration 9g00511682

    Note: Spacer (16) may remain with carrier assembly (15), or the spacer may remain with carrier assembly (24). Refer to Step 19.

  1. Remove spacer (16) from carrier assembly (15) .



    Illustration 10g00511735



    Illustration 11g00572352

    Note: If spring pin (17) is recessed below the outside surface of the carrier, measure the depth of the spring pin and record this measurement for assembly purposes.

  1. Drive spring pin (17) into planetary shaft (18) with a hammer and a punch.

    Note: Planetary gears (20) might have oil grooves "M". Note the position of the oil grooves in relation to the carrier for assembly purposes.

  1. Remove planetary shaft (18), two thrust washers (19) and planetary gear (20) from the carrier. Remove bearing (21) from the planetary gear. Remove spring pin (17) from planetary shaft (18) with a hammer and a punch.

  1. Repeat Steps 15 and 16 in order to remove the other two planetary gears from the carrier.



    Illustration 12g00511788

  1. Use a screwdriver, and remove retaining ring (22). Remove sun gear (23) from the carrier.



    Illustration 13g00511795

    Typical example

  1. If spacer (16) was not removed in Step 14, remove the spacer from carrier assembly (24) at this time.

  1. Slide a piece of steel bar stock between the planetary gears in carrier assembly (24), as shown. Make sure that the bar stock is centered in the carrier assembly. Fasten a lifting sling and a hoist to the steel bar stock, as shown. Slowly lift carrier assembly (24) from the final drive. The weight of the carrier assembly is approximately 36 kg (80 lb).



    Illustration 14g00511799

    Typical example




    Illustration 15g00572382

    Note: If spring pin (25) is recessed below the outside surface of the carrier, measure the depth of the spring pin and record this measurement for assembly purposes.

  1. Drive spring pin (25) into planetary shaft (26) with a hammer and a punch.

    Note: Planetary gears (28) might have oil grooves "N". Note the position of the oil grooves in relation to the carrier for assembly purposes.

  1. Remove planetary shaft (26), two thrust washers (27) and planetary gear (28) from the carrier. Remove two bearings (29) from the planetary gear. Drive spring pin (25) out of planetary shaft (26) with a hammer and a punch.

  1. Repeat Steps 21 and 22 in order to remove the other planetary gears from the carrier.



    Illustration 16g00511809

    Note: It will be necessary to pry ring gear (30) away from main housing (31) in order to install the lifting slings.

  1. Fasten lifting slings and a hoist to ring gear (30), as shown. Remove the ring gear from main housing (31). The weight of the ring gear is approximately 48 kg (105 lb).



    Illustration 17g00511825

  1. Remove O-ring seal (32) from main housing (31) .



    Illustration 18g00511857

    Typical example




    Illustration 19g00511869

  1. Remove socket head bolts (33) from gear (34) .

  1. Use Tooling (D) to remove gear (34) from the housing.



    Illustration 20g00511872

  1. Remove shims (35) from the housing.



    Illustration 21g00511882

  1. Fasten Tool (E) and a hoist to main housing (31), as shown. Separate the main housing and the final drive sprocket from the motor housing. The combined weight of the main housing and final drive sprocket is approximately 82 kg (180 lb).



    Illustration 22g00511906

  1. Remove Duo-Cone seal (36) from the motor housing.



    Illustration 23g00511934



    Illustration 24g00511939

  1. Remove Duo-Cone seal (37) from the main housing.

  1. Use Tooling (F) to remove bearings (38) and (39) from the main housing.

  1. If necessary, remove the final drive sprocket from the main housing. Refer to Disassembly and Assembly, "Final Drive Sprocket - Remove and Install" in this manual for the procedure to remove the final drive sprocket from the main housing.

Disassembly Procedure For The Final Drive On CIPI Undercarriage Arrangements Which Are Based On 325C Track Type Excavators

Table 2
Required Tools    
Tool     Part Number     Part Description     Qty    
A     1P-2420     Transmission Repair Stand     1    
B     138-7573     Link Bracket     2    
C     1P-1863     Retaining Ring Pliers     1    
D     194-3878     Spanner Socket     1    
E     138-7574     Link Bracket     2    
F     5F-7366     Forcing Screw     1    
1P-5546 Crossblock     1    
1U-9889 Crossblock     1    
1P-0520 Driver Group     1    
6V-7888 Puller Leg     2    
1H-3112 Puller Assembly     1    
1P-5551 Adjustable Screw Assembly     1    

Start By:

  1. Remove the final drive. Refer to Disassembly and Assembly, "Final Drive - Remove".

    Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of the component should be thoroughly cleaned. This will prevent dirt from entering the internal mechanism.

  1. Put an alignment mark across the sections of the final drive for assembly purposes. The parts must be reinstalled in the part's original locations.



    Illustration 25g00708089

  1. Fasten the final drive to Tooling (A), as shown. The combined weight of the final drive and final drive sprocket is approximately 312 kg (688 lb).

  1. Remove bolts (1) and the washers that hold the cover in position.



    Illustration 26g00708090

  1. Remove the setscrews from the cover. Fasten Tooling (B) and a hoist to cover (2), as shown. Remove the cover. The weight of the cover is approximately 32 kg (70 lb).



    Illustration 27g00879362

  1. Remove twelve bolts (3). Remove gear (5). Check plate (6). Replace plate (6) if wear is shown. Remove plug (4) from cover (2) .



    Illustration 28g00879365

  1. Remove O-ring seal (7) from plug (4) .



    Illustration 29g00780428

  1. Remove gear (8). Remove spacer (9) .



    Illustration 30g00780432

  1. Remove retaining ring (10) with Tooling (C). Remove washer (11). Remove gear (12). Remove bearing assembly (13). Remove second washer (11) .

  1. Repeat Step 8 for the additional two gear assemblies.



    Illustration 31g00781401

  1. Remove retaining ring (14) .



    Illustration 32g00781407

  1. Remove carrier assembly (15) .



    Illustration 33g00781412

  1. Remove gear (16). Remove spacer (17) .



    Illustration 34g00781466

  1. Remove retaining ring (18). Remove carrier (19) .

  1. Remove carrier (19) by lifting the carrier straight up. The weight of the carrier is approximately 14 kg (30 lb).



    Illustration 35g00879368

  1. Disassemble carrier assembly (19), as follows.

    1. Drive spring pin (20) into planetary shaft (21) with a hammer and a punch.



      Illustration 36g00781476

    1. Remove planetary shaft (21) with spring pin (20) from the carrier assembly.

    1. Remove spring pin (20) from planetary shaft (21) with a hammer and a punch.



      Illustration 37g00781516

    1. Remove two thrust washers (22) and planetary gear (24) from the carrier assembly.

    1. Remove bearing (23) from planetary gear (24) .

  1. Repeat Steps 15.a through 15.e in order to remove the other two planetary gears from the carrier.



    Illustration 38g00781529

  1. Remove gear (25). Remove spacer (26) .



    Illustration 39g00781559

  1. Remove carrier assembly (27) .

  1. Remove carrier assembly (27) by lifting the carrier straight up. The weight of the carrier assembly is approximately 38 kg (85 lb).

    Note: It will be necessary to use an appropriate lifting device or two people to remove carrier (27) .

  1. Disassemble carrier assembly (27), as follows.



      Illustration 40g00781719

    1. Drive spring pin (29) into planetary shaft (28) with a hammer and a punch.



      Illustration 41g00781601

    1. Remove planetary shaft (28) with spring pin (29) from the carrier assembly.

    1. Remove spring pin (29) from planetary shaft (28) with a hammer and a punch.



      Illustration 42g00781607

    1. Remove two thrust washers (30) and planetary gear (32) from the carrier assembly.

    1. Remove two bearings (31) from the planetary gear.

  1. Repeat Steps 20.a through 20.e in order to remove the other two planetary gears from the carrier.



    Illustration 43g00781730

  1. Remove gear (33). The weight of gear is approximately 41 kg (90 lb).

    Note: Use two technicians to remove gear (33) .




    Illustration 44g00781807

  1. Remove O-ring seal (34) .



    Illustration 45g00781815

  1. Remove peening operation from stopper plate assembly (35) .

    Note: Removal of the peening operation will allow stopper plate assembly to move without damage to parts.




    Illustration 46g00781830

  1. Install Tooling (D). Remove stopper plate assembly (35) .



    Illustration 47g00879371

  1. Install Tooling (E) to sprocket housing (36). Lift sprocket housing (36) and sprocket (37). Remove sprocket housing (37) from housing (38). The weight of housing (36), sprocket housing (37) and housing (38) is approximately 118 kg (260 lb).



    Illustration 48g00781858

  1. Remove Duo-Cone seal kit (39) from housing (38) .

  1. Rotate sprocket housing (36) .



    Illustration 49g00781895

  1. Remove Duo-Cone seal kit (39) .



    Illustration 50g00781907

  1. Use Tooling (F) in order to remove bearings (40) and (41) from the housing.

    Note: Sprocket housing (37) must be turned upside-down in order to remove bearing (41) .

  1. If necessary, remove the final drive sprocket from the sprocket housing.

    Reference: Refer to Disassembly and Assembly, "Final Drive Sprocket - Remove and Install" in this manual for the removal of the final drive sprocket from the main housing.