Disassembly Procedure For The Final Drive On CIPI Undercarriage Arrangements Which Are Based On 325 and 325B Track Type Excavators
Show/hide table
Table 1
Required Tools     |
Tool     |
Part Number     |
Part Description     |
Qty     |
A     |
1P-2420     |
Transmission Repair Stand     |
1     |
B     |
138-7573     |
Link Bracket     |
2     |
C     |
1P-1860     |
Retaining Ring Pliers     |
1     |
D     |
6B-6682     |
Full Nut     |
1     |
1P-5546 |
Crossblock     |
1     |
5P-8248 |
Hard Washer     |
4     |
6V-3142 |
Plate     |
1     |
|
(1) Threaded Rod     |
1     |
|
(2) Spacer     |
4     |
E     |
138-7574     |
Link Bracket     |
2     |
F     |
8B-7561     |
Step Plate     |
1     |
5F-7465 |
Puller Gp     |
1     |
1H-3107 |
Push-Puller Tool Gp     |
1     |
1H-3112 |
Bearing Cup Puller Gp     |
1     |
1P-5551 |
Adjustable Screw Assembly     |
1     |
Show/hide table
( 1 ) | The 16 NF threaded rod is 280 mm (11 inch) long × 19 mm (0.75 inch) in diameter. |
( 2 ) | The spacer's outer diameter is 64 mm (2.5 inch). The spacer's inner diameter is 25.4 mm (1.0 inch). The spacer's thickness is 6.4 mm (.25 inch). |
Start By:
- Remove the final drive. Refer to Disassembly and Assembly, "Final Drive - Remove" in this manual.
- Thoroughly clean the outside of the final drive prior to disassembly.
- Put an alignment mark across the sections of the final drive for assembly purposes. The parts must be reinstalled in the part's original locations.
Show/hide table
|
|
|
Illustration 1 | g00511587 |
- Fasten the final drive to Tool (A), as shown. The combined weight of the final drive and final drive sprocket is approximately 361 kg (795 lb).
- Remove 20 bolts (1) and the washers that secure the cover to the final drive.
Show/hide table
|
|
|
Illustration 2 | g00511600 |
- Use a soft faced hammer and break the seal between cover (2) and the ring gear. Fasten Tool (B) and a hoist to cover (2), as shown. Remove the cover. The weight of the cover is approximately 32 kg (70 lb).
Show/hide table
|
|
|
Illustration 3 | g00511631 |
- Remove thrust plate (5) from the cover.
- Remove 12 socket head bolts (3) and ring gear (4) from the cover.
Show/hide table
|
|
|
Illustration 4 | g00511636 |
- Remove sun gear (6). Remove carrier assembly (7) by lifting the carrier assembly straight up. The weight of the carrier assembly is approximately 14 kg (30 lb).
Show/hide table
|
|
|
Illustration 5 | g00511640 |
Show/hide table
|
|
|
Illustration 6 | g00572334 |
Note: Two spacers (8) are used with carrier assembly (7). One of the spacers fits on the top side of carrier assembly (7). The other spacer (8) is located in the carrier of carrier assembly (15) .
- Remove spacer (8) from carrier assembly (7) .
Note: Planetary gears (11) might have oil grooves "L". Note the position of the oil grooves in relation to the carrier for assembly purposes.
- Remove retaining ring (9) with Tool (C). Remove two thrust washers (10) and planetary gear (11) from the carrier. Remove bearing (12) from the planetary gear.
- Repeat Step 10 in order to remove the other two planetary gears from the carrier.
Show/hide table
|
|
|
Illustration 7 | g00511653 |
- Use a screwdriver, and remove retaining ring (13) from the carrier. Remove sun gear (14) from the carrier.
Show/hide table
|
|
|
Illustration 8 | g00511661 |
- Use two people in order to remove carrier assembly (15). Remove the carrier assembly by pulling the carrier assembly straight up. The weight of the carrier assembly is approximately 25 kg (55 lb).
Show/hide table
|
|
|
Illustration 9 | g00511682 |
Note: Spacer (16) may remain with carrier assembly (15), or the spacer may remain with carrier assembly (24). Refer to Step 19.
- Remove spacer (16) from carrier assembly (15) .
Show/hide table
|
|
|
Illustration 10 | g00511735 |
Show/hide table
|
|
|
Illustration 11 | g00572352 |
Note: If spring pin (17) is recessed below the outside surface of the carrier, measure the depth of the spring pin and record this measurement for assembly purposes.
- Drive spring pin (17) into planetary shaft (18) with a hammer and a punch.
Note: Planetary gears (20) might have oil grooves "M". Note the position of the oil grooves in relation to the carrier for assembly purposes.
- Remove planetary shaft (18), two thrust washers (19) and planetary gear (20) from the carrier. Remove bearing (21) from the planetary gear. Remove spring pin (17) from planetary shaft (18) with a hammer and a punch.
- Repeat Steps 15 and 16 in order to remove the other two planetary gears from the carrier.
Show/hide table
|
|
|
Illustration 12 | g00511788 |
- Use a screwdriver, and remove retaining ring (22). Remove sun gear (23) from the carrier.
Show/hide table
|
|
|
Illustration 13 | g00511795 |
Typical example |
- If spacer (16) was not removed in Step 14, remove the spacer from carrier assembly (24) at this time.
- Slide a piece of steel bar stock between the planetary gears in carrier assembly (24), as shown. Make sure that the bar stock is centered in the carrier assembly. Fasten a lifting sling and a hoist to the steel bar stock, as shown. Slowly lift carrier assembly (24) from the final drive. The weight of the carrier assembly is approximately 36 kg (80 lb).
Show/hide table
|
|
|
Illustration 14 | g00511799 |
Typical example |
Show/hide table
|
|
|
Illustration 15 | g00572382 |
Note: If spring pin (25) is recessed below the outside surface of the carrier, measure the depth of the spring pin and record this measurement for assembly purposes.
- Drive spring pin (25) into planetary shaft (26) with a hammer and a punch.
Note: Planetary gears (28) might have oil grooves "N". Note the position of the oil grooves in relation to the carrier for assembly purposes.
- Remove planetary shaft (26), two thrust washers (27) and planetary gear (28) from the carrier. Remove two bearings (29) from the planetary gear. Drive spring pin (25) out of planetary shaft (26) with a hammer and a punch.
- Repeat Steps 21 and 22 in order to remove the other planetary gears from the carrier.
Show/hide table
|
|
|
Illustration 16 | g00511809 |
Note: It will be necessary to pry ring gear (30) away from main housing (31) in order to install the lifting slings.
- Fasten lifting slings and a hoist to ring gear (30), as shown. Remove the ring gear from main housing (31). The weight of the ring gear is approximately 48 kg (105 lb).
Show/hide table
|
|
|
Illustration 17 | g00511825 |
- Remove O-ring seal (32) from main housing (31) .
Show/hide table
|
|
|
Illustration 18 | g00511857 |
Typical example |
Show/hide table
|
|
|
Illustration 19 | g00511869 |
- Remove socket head bolts (33) from gear (34) .
- Use Tooling (D) to remove gear (34) from the housing.
Show/hide table
|
|
|
Illustration 20 | g00511872 |
- Remove shims (35) from the housing.
Show/hide table
|
|
|
Illustration 21 | g00511882 |
- Fasten Tool (E) and a hoist to main housing (31), as shown. Separate the main housing and the final drive sprocket from the motor housing. The combined weight of the main housing and final drive sprocket is approximately 82 kg (180 lb).
Show/hide table
|
|
|
Illustration 22 | g00511906 |
- Remove Duo-Cone seal (36) from the motor housing.
Show/hide table
|
|
|
Illustration 23 | g00511934 |
Show/hide table
|
|
|
Illustration 24 | g00511939 |
- Remove Duo-Cone seal (37) from the main housing.
- Use Tooling (F) to remove bearings (38) and (39) from the main housing.
- If necessary, remove the final drive sprocket from the main housing. Refer to Disassembly and Assembly, "Final Drive Sprocket - Remove and Install" in this manual for the procedure to remove the final drive sprocket from the main housing.
Disassembly Procedure For The Final Drive On CIPI Undercarriage Arrangements Which Are Based On 325C Track Type Excavators
Show/hide table
Table 2
Required Tools     |
Tool     |
Part Number     |
Part Description     |
Qty     |
A     |
1P-2420     |
Transmission Repair Stand     |
1     |
B     |
138-7573     |
Link Bracket     |
2     |
C     |
1P-1863     |
Retaining Ring Pliers     |
1     |
D     |
194-3878     |
Spanner Socket     |
1     |
E     |
138-7574     |
Link Bracket     |
2     |
F     |
5F-7366     |
Forcing Screw     |
1     |
1P-5546 |
Crossblock     |
1     |
1U-9889 |
Crossblock     |
1     |
1P-0520 |
Driver Group     |
1     |
6V-7888 |
Puller Leg     |
2     |
1H-3112 |
Puller Assembly     |
1     |
1P-5551 |
Adjustable Screw Assembly     |
1     |
Start By:
- Remove the final drive. Refer to Disassembly and Assembly, "Final Drive - Remove".
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of the component should be thoroughly cleaned. This will prevent dirt from entering the internal mechanism.
- Put an alignment mark across the sections of the final drive for assembly purposes. The parts must be reinstalled in the part's original locations.
Show/hide table
|
|
|
Illustration 25 | g00708089 |
- Fasten the final drive to Tooling (A), as shown. The combined weight of the final drive and final drive sprocket is approximately 312 kg (688 lb).
- Remove bolts (1) and the washers that hold the cover in position.
Show/hide table
|
|
|
Illustration 26 | g00708090 |
- Remove the setscrews from the cover. Fasten Tooling (B) and a hoist to cover (2), as shown. Remove the cover. The weight of the cover is approximately 32 kg (70 lb).
Show/hide table
|
|
|
Illustration 27 | g00879362 |
- Remove twelve bolts (3). Remove gear (5). Check plate (6). Replace plate (6) if wear is shown. Remove plug (4) from cover (2) .
Show/hide table
|
|
|
Illustration 28 | g00879365 |
- Remove O-ring seal (7) from plug (4) .
Show/hide table
|
|
|
Illustration 29 | g00780428 |
- Remove gear (8). Remove spacer (9) .
Show/hide table
|
|
|
Illustration 30 | g00780432 |
- Remove retaining ring (10) with Tooling (C). Remove washer (11). Remove gear (12). Remove bearing assembly (13). Remove second washer (11) .
- Repeat Step 8 for the additional two gear assemblies.
Show/hide table
|
|
|
Illustration 31 | g00781401 |
- Remove retaining ring (14) .
Show/hide table
|
|
|
Illustration 32 | g00781407 |
- Remove carrier assembly (15) .
Show/hide table
|
|
|
Illustration 33 | g00781412 |
- Remove gear (16). Remove spacer (17) .
Show/hide table
|
|
|
Illustration 34 | g00781466 |
- Remove retaining ring (18). Remove carrier (19) .
- Remove carrier (19) by lifting the carrier straight up. The weight of the carrier is approximately 14 kg (30 lb).
Show/hide table
|
|
|
Illustration 35 | g00879368 |
- Disassemble carrier assembly (19), as follows.
- Drive spring pin (20) into planetary shaft (21) with a hammer and a punch.
Show/hide table
|
|
|
Illustration 36 | g00781476 |
- Remove planetary shaft (21) with spring pin (20) from the carrier assembly.
- Remove spring pin (20) from planetary shaft (21) with a hammer and a punch.
Show/hide table
|
|
|
Illustration 37 | g00781516 |
- Remove two thrust washers (22) and planetary gear (24) from the carrier assembly.
- Remove bearing (23) from planetary gear (24) .
- Repeat Steps 15.a through 15.e in order to remove the other two planetary gears from the carrier.
Show/hide table
|
|
|
Illustration 38 | g00781529 |
- Remove gear (25). Remove spacer (26) .
Show/hide table
|
|
|
Illustration 39 | g00781559 |
- Remove carrier assembly (27) .
- Remove carrier assembly (27) by lifting the carrier straight up. The weight of the carrier assembly is approximately 38 kg (85 lb).
Note: It will be necessary to use an appropriate lifting device or two people to remove carrier (27) .
- Disassemble carrier assembly (27), as follows.
Show/hide table
|
|
|
Illustration 40 | g00781719 |
- Drive spring pin (29) into planetary shaft (28) with a hammer and a punch.
Show/hide table
|
|
|
Illustration 41 | g00781601 |
- Remove planetary shaft (28) with spring pin (29) from the carrier assembly.
- Remove spring pin (29) from planetary shaft (28) with a hammer and a punch.
Show/hide table
|
|
|
Illustration 42 | g00781607 |
- Remove two thrust washers (30) and planetary gear (32) from the carrier assembly.
- Remove two bearings (31) from the planetary gear.
- Repeat Steps 20.a through 20.e in order to remove the other two planetary gears from the carrier.
Show/hide table
|
|
|
Illustration 43 | g00781730 |
- Remove gear (33). The weight of gear is approximately 41 kg (90 lb).
Note: Use two technicians to remove gear (33) .
Show/hide table
|
|
|
Illustration 44 | g00781807 |
- Remove O-ring seal (34) .
Show/hide table
|
|
|
Illustration 45 | g00781815 |
- Remove peening operation from stopper plate assembly (35) .
Note: Removal of the peening operation will allow stopper plate assembly to move without damage to parts.
Show/hide table
|
|
|
Illustration 46 | g00781830 |
- Install Tooling (D). Remove stopper plate assembly (35) .
Show/hide table
|
|
|
Illustration 47 | g00879371 |
- Install Tooling (E) to sprocket housing (36). Lift sprocket housing (36) and sprocket (37). Remove sprocket housing (37) from housing (38). The weight of housing (36), sprocket housing (37) and housing (38) is approximately 118 kg (260 lb).
Show/hide table
|
|
|
Illustration 48 | g00781858 |
- Remove Duo-Cone seal kit (39) from housing (38) .
- Rotate sprocket housing (36) .
Show/hide table
|
|
|
Illustration 49 | g00781895 |
- Remove Duo-Cone seal kit (39) .
Show/hide table
|
|
|
Illustration 50 | g00781907 |
- Use Tooling (F) in order to remove bearings (40) and (41) from the housing.
Note: Sprocket housing (37) must be turned upside-down in order to remove bearing (41) .
- If necessary, remove the final drive sprocket from the sprocket housing.
Reference: Refer to Disassembly and Assembly, "Final Drive Sprocket - Remove and Install" in this manual for the removal of the final drive sprocket from the main housing.