Removal Procedure
Required Tools     | |||
Tool     | Part Number     | Part Description     | Qty     |
A     | 138-7575     | Link Bracket     | 2     |
ZZ     | 6V-9833     | Cap As     | 2     |
Start By:
- Remove the auger bit. Refer to Disassembly and Assembly, "Auger Bit - Remove and Install".
NOTICE |
---|
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop Products Guide" for tools and supplies suitable to collect and contain fluids on Caterpillar products. Dispose of all fluids according to local regulations and mandates. |
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of the component should be thoroughly cleaned. This will help to prevent dirt from entering the internal mechanism.
Note: SERVICE DATA: TOOLING (ZZ) WILL NOT BE IDENTIFIED IN PHOTOGRAPHS IN THE REMOVAL OR THE INSTALLATION. THIS TOOLING IS SHOWN IN ORDER TO ASSIST THE EXPERIENCED SERVICEMAN.
- Secure auger drive housing (1) .
Illustration 1 | g01043550 |
- Remove hose assemblies (2) .
- Loosen fitting (3) .
- Install Tooling (A) .
Illustration 2 | g01043551 |
Illustration 3 | g01043552 |
- Attach a suitable lifting device to Tooling (A) .
- Remove bolts (4) .
- Remove fitting (3) .
- Remove the auger planetary and gerotor motor (5) from auger drive housing (1) .