325C Material Handler Hydraulic System Caterpillar


Boom Hydraulic System

Usage:

325C S2C

Boom Raise (High Speed)




Illustration 1g00952504

Hydraulic schematic for BOOM RAISE (high speed)

(1) Boom cylinders

(2) Boom lowering control valve

(3) Valve

(4) Line (oil flow from boom cylinder rod end)

(5) Passage

(6) Line (oil flow to boom lowering control valve)

(7) Line

(8) Return line

(9) Port

(10) Port

(11) Main control valve

(12) Check valve

(13) Parallel feeder passage

(14) Return passage

(15) Boom I control valve

(16) Spring

(17) Load check valve

(18) Spring

(19) Boom II control valve

(20) Parallel feeder passage

(21) Return passage

(22) Spring

(23) Pilot line

(24) Port

(25) Pilot line

(26) Pilot line

(27) Pressure reducing valve for boom priority

(28) Pilot control valve (boom)

(29) Left pump

(30) Right pump

(31) Pilot pump

(32) Pilot line

A BOOM RAISE operation at high speed is accomplished when the oil delivery from both left pump (29) and right pump (30) is supplied to the head end of boom cylinders (1). Boom I control valve (15) and boom II control valve (19) operate during the high speed operation. A BOOM RAISE operation at low speed is accomplished when the oil delivery from only right pump (30) is supplied to the head end of boom cylinders (1). During the low speed operation, boom I control valve (15) operates alone.




Illustration 2g00944072

Main control valve compartment

(15) Boom I control valve

(19) Boom II control valve

The oil delivery from right pump (30) flows through parallel feeder passage (20) in main control valve (11) to boom I control valve (15). The oil delivery from left pump (29) flows through parallel feeder passage (13) in main control valve (11) to boom II control valve (19) .

When the joystick for the boom is moved to the full BOOM RAISE position, the pilot oil flows from pilot control valve (28) through pilot line (32). The pilot oil flow then divides into two flow paths. Part of the pilot oil flows through pilot line (25) to port (9) of main control valve (11). The remainder of the pilot oil flows through pilot line (23) to port (24) of the main control valve.

A portion of the oil in pilot line (23) also flows through pilot line (26) to pressure reducing valve (27) for boom priority. During a combined operation of BOOM RAISE and STICK IN, the pilot oil flow to pressure reducing valve (27) for boom priority causes the boom circuit to receive oil flow priority. This allows the boom to raise at a high speed.




Illustration 3g00944215

Boom I control valve (BOOM RAISE position)

(16) Spring

(17) Load check valve

(20) Parallel feeder passage

(21) Return passage

(24) Port

(33) Passage

(34) Port

(35) Port

(36) Spool

(37) Passage

The pilot oil flow from port (24) shifts spool (36) of boom I control valve (15) against the force of spring (16). The oil delivery from the right pump in parallel feeder passage (20) flows through load check valve (17), passage (33), passage (37), port (35), and line (6) to boom lowering control valves (2). The oil delivery from the right pump flows through passage (5) and the check valve in valve (3) to the head end of boom cylinders (1) .

Note: For more information on the boom lowering control valve, refer to Systems Operation, "Boom Lowering Control Valve".




Illustration 4g00944236

Boom II control valve (BOOM RAISE position)

(9) Port

(10) Port

(12) Check valve

(13) Parallel feeder passage

(18) Spring

(38) Passage

(39) Spool

(40) Passage

The pilot oil flow in port (9) of boom II control valve (19) shifts spool (39) against the force of spring (18). The oil delivery from the left pump in parallel feeder passage (13) now flows through passage (38), passage (40), check valve (12) and flows out of port (10) to line (7). The oil delivery from the left pump combines with the oil delivery from the right pump at the block valve on main control valve (11). The combined pump oil flows through line (6) and boom lowering control valves (2) to the head end of boom cylinders (1) .

Note: The swing priority valve does not affect the boom II control valve.

Return oil from the rod end of boom cylinders (1) flows through line (4) and port (34) to boom I control valve (15). The oil then flows through the passage in boom I control valve (15), return passage (21), return passage (14) and return line (8) to the hydraulic tank.

Boom Raise (Low Speed)

When the joystick for the boom is moved less than half of the travel distance for BOOM RAISE, low pilot oil pressure is supplied to boom I control valve (15) and boom II control valve (19) .

When the boom is raised at a low speed, boom I control valve (15) opens and boom II control valve (19) remains closed. The force of spring (16) in boom I control valve (15) is less than the force of spring (18) in boom II control valve (19). Because of the low pilot oil pressure, boom I control valve (15) will open and boom II control valve (19) will remain closed.

The oil delivery from right pump (30) now flows to the head end of boom cylinders (1). Without the oil delivery from left pump (29), the cylinder rod movement slows down when the boom is raised. The low speed operation of the boom is performed.

Boom Priority




Illustration 5g00952509

Hydraulic schematic for BOOM RAISE and STICK IN

(1) Boom cylinders

(27) Pressure reducing valve for boom priority

(28) Pilot control valve (boom)

(41) Stick cylinders

(42) Stick II control valve

(43) Pilot line

(44) Pilot control valve (stick and swing)

During combined operations of BOOM RAISE and STICK OUT, the pilot oil pressure from pilot control valve (28) for the boom activates pressure reducing valve (27) for boom priority. Pressure reducing valve (27) for boom priority causes oil flow priority to the head end of boom cylinders (1) during this combined hydraulic operation.

When the joystick for the stick is moved to the STICK OUT position, a portion of the pilot oil from pilot control valve (44) for the stick flows through pressure reducing valve (27) to stick II control valve (42). As the joystick for the boom is moved farther from the NEUTRAL position during a BOOM RAISE operation, pilot oil pressure from pilot control valve (28) for the boom increases. This gradual increase in pilot oil pressure causes the spool in pressure reducing valve (27) to gradually shift.

A portion of the pilot oil that flows to stick II control valve (42) from pilot control valve (44) for the stick is routed to the hydraulic tank. The pilot oil pressure in pilot line (43) that acts on stick II control valve (42) decreases. Stick II control valve (42) shifts toward the NEUTRAL position. The amount of oil flow from the main pumps to stick cylinders (41) decreases. This causes a greater portion of the oil flow from the main pumps to flow to the head end of the boom cylinders (1) .

Since the pilot oil pressure from pilot control valve (28) for the boom directly corresponds to the amount of movement or position of the joystick a gradual change to boom priority occurs. Thus, boom priority is controlled by the position of the joystick for the boom and boom priority automatically activates when the joystick reaches a certain position during a BOOM RAISE operation.

Boom Lower




Illustration 6g00952513

Hydraulic schematic for BOOM LOWER

(1) Boom cylinders

(2) Boom lowering control valve

(3) Valve

(4) Line (oil flow to boom cylinder rod end)

(6) Line (oil flow from boom lowering control valve)

(15) Boom I control valve

(17) Load check valve

(19) Boom II control valve

(20) Parallel feeder passage

(21) Return passage

(22) Spring

(28) Pilot control valve (boom)

(29) Left pump

(30) Right pump

(31) Pilot pump

(45) Passage

(46) Pilot line

(47) Port

(48) Port

(49) Passage

(50) Center bypass passage

(51) Boom regeneration valve

(52) Pilot line

(53) Orifice

(54) Passage

(55) Orifice

(56) Negative flow control line

During a BOOM LOWER operation, the oil delivery from only right pump (30) is supplied to boom cylinders (1) through boom I control valve (15). Boom I control valve (15) operates alone. Boom II control valve (19) is not operational in the BOOM LOWER operation.

The BOOM LOWER operation contains a regeneration circuit. When the joystick for the boom is moved to the BOOM LOWER position, orifice (53) in boom I control valve (15) and boom regeneration valve (51) are operational in the boom hydraulic circuit. The return oil flow from the head end of boom cylinders (1) flows through boom regeneration valve (51) to the rod end of the boom cylinders. The boom regeneration valve is described later in this section.

When the joystick for the boom is moved to the BOOM LOWER position, pilot oil from pilot control valve (28) flows through pilot line (52). The pilot oil flow then divides into three flow paths. Part of the pilot oil flows through port (47) to boom I control valve (15). Part of the pilot oil flows through port (48) to boom regeneration valve (51). The remainder of the pilot oil flows through pilot lines (46) to boom lowering control valves (2) .

Since the pilot oil pressure has caused the spool in boom I control valve (15) to shift against the force of spring (22), the oil delivery from the right pump that flows through center bypass passage (50) is restricted by orifice (53). The negative flow control pressure in negative flow control line (56) decreases. The right pump upstrokes because of the negative flow control operation.

Reference: For more information concerning the negative flow control operation, refer to Systems Operation, "Negative Flow Control".




Illustration 7g00944445

Boom I control valve (BOOM LOWER position)

(17) Load check valve

(20) Parallel feeder passage

(21) Return passage

(22) Spring

(34) Port

(35) Port

(36) Spool

(47) Port

(53) Orifice

(54) Passage

(55) Orifice

The pilot oil flow from port (47) shifts spool (36) in boom I control valve (15) against the force of spring (22). The oil delivery from the right pump in parallel feeder passage (20) flows through load check valve (17), passage (54) and port (34). The oil delivery from the right pump then flows through line (4) to the rod end of boom cylinders (1) .

The return oil from the head end of boom cylinders (1) flows through boom lowering control valve (2). Pilot pressure from pilot line (46) flows through passage (45) to valve (3). The pilot oil pressure shifts valve (3) to the left. The return oil from the head end of the boom cylinders flows through valve (3), passage (5), and line (6) to passage (49) .

A portion of the return oil flows through the passage to boom I control valve (15). The return oil flow is restricted by orifice (55). The return oil pressure in passage (49) increases. Most of the return oil flows through boom regeneration valve (51). The return oil is now supplied to the rod end of the boom cylinders through line (4) .

Boom Regeneration Valve




Illustration 8g00944468

Boom regeneration valve (slow boom down)

(11) Main control valve

(48) Pilot port

(57) Check valve

(58) Passage

(59) Spool (boom regeneration valve)

(60) Passage




Illustration 9g00944470

Boom regeneration valve (fast boom down)

(11) Main control valve

(48) Pilot port

(57) Check valve

(58) Passage

(59) Spool (boom regeneration valve)

(60) Passage

The boom hydraulic circuit contains a regeneration circuit. This regeneration circuit allows the return oil from the head end of the boom cylinders to be supplied to the rod end of the boom cylinders during the BOOM LOWER operation.

When the joystick for the boom is moved to the BOOM LOWER position, pilot oil flow from the pilot control valve (boom) enters pilot port (48). Spool (59) in the boom regeneration valve shifts downward. The return oil from the head end of the boom cylinders flows through passage (60) and through the throttling slots on the spool for the boom regeneration valve to check valve (57). Check valve (57) opens and the return oil flows through passage (58). The return oil from the head end of the boom cylinders in passage (58) combines with the oil delivery from the right pump. This combined oil now flows to the rod end of the boom cylinders.

The oil delivery from only the right pump is used for the BOOM LOWER operation. Since the boom regeneration valve supplies return oil from the head end to the rod end of the boom cylinders, more efficient use of the oil delivery from the right pump is achieved during a BOOM LOWER operation.

Caterpillar Information System:

Bench Test Procedure for Hydraulic Piston Pumps {0784, 5070} Bench Test Procedure for Hydraulic Piston Pumps {0784, 5070}
325C Excavator Safety Messages
2003/02/03 Special Instruction, REHS1238, "Obtaining Factory Passwords and Software Enabled Attachments" is Available {7610}
2003/02/03 A New Electronic Controller for the Air Inlet Heater (AIH) Improves the Engine Starting Ability {1090}
321C CR Excavator Hydraulic System Relief Valve (Line) - Test and Adjust
321C CR Excavator Hydraulic System Relief Valve (Crossover) - Test and Adjust
321C CR Excavator Hydraulic System Relief Valve (Main) - Test and Adjust
G315, G320 and G330 Demolition and Sorting Grapples Reference Material
321C CR Excavator Hydraulic System Relief Valve (Pilot) - Test and Adjust
G315, G320 and G330 Demolition and Sorting Grapples Transport Position
3054E Industrial Engine Fuel Priming Pump and Fuel Filter Base - Remove and Install
321C CR Excavator Hydraulic System Cylinder Speed - Check
365B, 365B Series II and 365BL Excavators Cooling System Coolant Sample (Level 1) - Obtain
365B, 365B Series II and 365BL Excavators Cooling System Coolant Sample (Level 2) - Obtain
325C Material Handler Hydraulic System Stick Hydraulic System
321C CR Excavator Hydraulic System Relief Valve (Swing) - Test and Adjust
325C Material Handler Hydraulic System Grapple Hydraulic System
3054E Industrial Engine Engine Oil Filter Base - Remove and Install
345B Series II Material Handler Specifications
321C CR Excavator Hydraulic System Swing Motor - Test - Measurement of Case Drain Oil
3054E Industrial Engine Engine Oil Cooler - Remove
3054E Industrial Engine Engine Oil Cooler - Install
325C Material Handler Hydraulic System Relief Valve (Line) - Test and Adjust
C13, C15, and C18 Tier 4 Final Engines Water Pump
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.