Installation Procedure
NOTICE |
---|
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Refer to Special Publication, NENG2500, "Caterpillar Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Caterpillar products. Dispose of all fluids according to local regulations and mandates. |
Note: Check the O-ring seals, the gaskets, and the seals for wear or for damage. Replace the components, if necessary.
- Position water pump (12) . Install bolts (11) .
Illustration 1 | g01263715 |
- Position cover (8) . Install bolts (7) . Connect hose (10) . Tighten clamp (9) .
Illustration 2 | g01263649 |
- Position bonnet (4) . Install bolts (6) .
Illustration 3 | g01263609 |
- Connect harness assembly (5) .
- Position clip (3) and install bolts (2) .
- Connect hose (1) .
- Fill the cooling system. Refer to Operation and Maintenance Manual, "Capacities - Refill" for the capacity of the cooling system. Refer to Operation and Maintenance Manual, "Cooling System Coolant (DEAC) - Change" or Operation and Maintenance Manual, "Cooling System Extended Life Coolant - Change" for the proper filling procedure.
End By: Install the right engine side guard. Refer to Disassembly and Assembly, "Engine Side Guard (Right) - Remove and Install".