784C and 785C Off-Highway Trucks Machine Systems Caterpillar


Pump Drive - Assemble

Usage:

785C 1HW

Assembly Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
1P-0510  Driver Group 
8T-5096  Dial Indicator Group 

    Note: Cleanliness is an important factor. Before the assembly procedure, all parts should be thoroughly cleaned in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts. Lint may be deposited on the parts which may cause later trouble.

  1. Check all of the O-ring seals and the components for wear or damage.

  2. Lubricate all of the O-ring seals lightly with the lubricant that is being sealed.


    Illustration 1g00487300


    Illustration 2g00487302


    Illustration 3g00537689

  3. Use Tooling (A) and a suitable hydraulic press in order to install roller bearing cone (30) onto pump drive gear (14).

  4. Rotate pump drive gear (14) so that roller bearing cone (29) can be installed. Use Tooling (A) and a suitable hydraulic press in order to install roller bearing cone (29) onto pump drive gear (14).


    Illustration 4g00487306


    Illustration 5g00487307


    Illustration 6g00574396

  5. Use Tooling (A) and a suitable hydraulic press in order to install roller bearing cone (27) onto pump drive gear (15).

  6. Rotate pump drive gear (15) so that roller bearing cone (28) can be installed. Use Tooling (A) and a suitable hydraulic press in order to install roller bearing cone (28) onto pump drive gear (15).


    Illustration 7g00487308

  7. Install lockring (24) into pump idler gear (16).


    Illustration 8g00487309

  8. Lower the temperature of roller bearing cup (25) to a temperature of −40 °C (−40 °F). Use Tooling (A) (not shown) and a suitable hydraulic press in order to install roller bearing cup (25) into pump idler gear (16). Seat roller bearing cup (25) against lockring (24).


    Illustration 9g00487310


    Illustration 10g00487311

  9. Rotate pump idler gear (16) so that roller bearing cup (26) can be installed.

  10. Lower the temperature of roller bearing cup (26) to a temperature of −40 °C (−40 °F). Use Tooling (A) and a suitable hydraulic press in order to install roller bearing cup (26) (not shown) into pump idler gear (16). Seat roller bearing cup (26) against lockring (24) (not shown).


    Illustration 11g00487318

  11. Use Tooling (A) (not shown) and a suitable hydraulic press in order to install roller bearing assembly (21) onto governor control shaft (17).

  12. Install spacer (20) onto governor control shaft (17).


    Illustration 12g00537690

  13. Use Tooling (A) (not shown) in order to install roller bearing assembly (19) into pump idler gear (16).


    Illustration 13g00487319

  14. Position pump drive housing (1) onto a suitable work bench, as shown.


    Illustration 14g00537692


    Illustration 15g00537693


    Illustration 16g00537694

  15. Lower the temperature of roller bearing cups (35) and (36) to a temperature of −40 °C (−40 °F). Use Tooling (A) in order to install roller bearing cups (35) and (36) into pump drive housing (1). Seat bearing cups (35) and (36) against the flanges of pump drive housing (1).


    Illustration 17g00487344

  16. Rotate pump drive housing (1).


    Illustration 18g00487353

  17. Remove any burrs from pump drive housing (1) so that the bearing end play will be set properly.


    Illustration 19g00574397

  18. Install lip seal (32) into pump drive housing (1).

  19. Install plug (33) and the O-ring seal into pump drive housing (1).


    Illustration 20g00538072

  20. Install plug (34) and the O-ring seal into pump drive housing (1).


    Illustration 21g00487347


    Illustration 22g00537719

  21. Use Tooling (A) in order to install seal ring (31) into pump drive housing (1), as shown.


    Illustration 23g00486647

  22. Position pump drive housing (1) vertically into a suitable fixture or a vise, as shown.


    Illustration 24g00487448


    Illustration 25g00486613

  23. Insert pump idler gear (16) through the lower opening of pump drive housing (1). Position pump idler gear (16) into the center position of pump drive housing (1), as shown.


    Illustration 26g00486605


    Illustration 27g00487600

  24. The following steps illustrate the procedure that is used in order to determine the thickness of shim pack (23):

    1. Insert governor control shaft (17) into pump drive housing (1) without any shims or O-ring seals.

    2. Install four bolts (18) and the washers in order to secure governor control shaft (17) to pump drive housing (1). Tighten four bolts (18) evenly to a torque of 7 ± 1 N·m (5.16 ± 0.74 lb ft).


      Illustration 28g00574399

    3. Insert a depth micrometer into one of the holes that is located on governor control shaft (17). Record the measurement. Insert a depth micrometer into the remaining hole that is located on governor control shaft (17). Calculate the average of the two measurements. Record the average measurement.


      Illustration 29g00486613


      Illustration 30g00487600

    4. Support pump idler gear (16). Remove four bolts (18) and the washers in order to remove governor control shaft (17) from pump drive housing (1). Lower pump idler gear (16).


      Illustration 31g00487626

    5. Use an outside micrometer in order to measure the thickness of the flange of control shaft (17) in three equally spaced locations. Calculate the average of the three measurements. Record the average measurement.

    6. Subtract the measurement that was recorded in Step 24.e from the measurement that was recorded in Step 24.c. Record the measurement.

    7. In order to determine the thickness of shim pack (23), subtract −.1 mm (−0.004 inch) from the measurement that was recorded in Step 24.f. This measurement is the required thickness of the shim pack. Use an outside micrometer in order to assemble shim pack (23).


    Illustration 32g00537720

  25. Install shim pack (23) onto governor control shaft (17).

  26. Install O-ring seal (22) onto governor control shaft (17).


    Illustration 33g00486613


    Illustration 34g00487600

  27. Position pump idler gear (16) into the center position of pump drive housing (1), as shown.

  28. Insert governor control shaft (17) and the shims into pump drive housing (1). Install four bolts (18) and the washers in order to secure governor control shaft (17) to pump drive housing (1). Tighten four bolts (18) evenly to a torque of 47 ± 9 N·m (34.7 ± 6.6 lb ft).


    Illustration 35g00486599

  29. Install pump drive gear (14) into the upper opening of pump drive housing (1).


    Illustration 36g00486601

  30. Install pump drive gear (15) into the lower opening of pump drive housing (1).


    Illustration 37g00537722

  31. Lower the temperature of roller bearing cup (9) to a temperature of −40 °C (−40 °F). Use Tooling (A) (not shown) in order to install roller bearing cup (9) into bearing cage (6).


    Illustration 38g00537724

  32. Lower the temperature of roller bearing cup (13) to a temperature of −40 °C (−40 °F). Use Tooling (A) (not shown) in order to install roller bearing cup (13) into cage assembly (3).


    Illustration 39g00487453


    Illustration 40g00487456


    Illustration 41g00537727

  33. Use six bolts (5) and the washers in order to install bearing cage (6) onto pump drive housing (1) without any shims or O-ring seals.

  34. Use six bolts (7) and the washers in order to install cage assembly (3) onto pump drive housing (1) without any shims or O-ring seals.

  35. Tighten six bolts (5) and six bolts (7) evenly until the pump drive gears bind slightly.


    Illustration 42g00487484

  36. Strike the pump drive gears with a soft faced hammer in order to seat the pump drive gears into the bearing cones. Repeat Step 35.

  37. The following steps illustrate the procedure that is used in order to determine the thickness of shim pack (10):


      Illustration 43g00537727

    1. Insert a depth micrometer into one of the three holes that are located on bearing cage (6). Record the measurement. Repeat for the remaining two holes. Calculate the average of the three measurements. Record the average measurement.

    2. Remove six bolts (5) and the washers in order to remove bearing cage (6) from pump drive housing (1).

    3. Use an outside micrometer in order to measure the thickness of the shaft flange in three equally spaced locations. Calculate the average of the three measurements. Record the average measurement.

    4. Subtract the measurement that was recorded in Step 37.c from the measurement that was recorded in Step 37.a. Record the measurement. This measurement is the average gap between bearing cage (6) and pump drive housing (1).

    5. In order to determine the thickness of shim pack (10), add 0.1 mm (0.004 inch) to the measurement that was recorded in Step 37.d. This measurement is the required thickness of the shim pack. Use an outside micrometer in order to assemble shim pack (10).


      Illustration 44g00537728

    6. Install shim pack (10) onto bearing cage (6). Install O-ring seal (8) onto bearing cage (6). Use six bolts (5) and the washers in order to install bearing cage (6) onto pump drive housing (1). Tighten six bolts (5) to a torque of 47 ± 9 N·m (34.67 ± 6.64 lb ft).

  38. The following steps illustrate the procedure that is used in order to determine the thickness of shim pack (12):


      Illustration 45g00537727

    1. Insert a depth micrometer into one of the three holes that are located on cage assembly (3). Record the measurement. Repeat for the remaining two holes. Calculate the average of the three measurements. Record the average measurement.

    2. Remove six bolts (7) and the washers in order to remove cage assembly (3) from pump drive housing (1).

    3. Use an outside micrometer in order to measure the thickness of the shaft flange in three equally spaced locations. Calculate the average of the three measurements. Record the average measurement.

    4. Subtract the measurement that was recorded in Step 38.c from the measurement that was recorded in Step 38.a. Record the measurement. This measurement is the average gap between cage assembly (3) and pump drive housing (1).

    5. In order to determine the thickness of shim pack (12), add 0.1 mm (0.004 inch) to the measurement that was recorded in Step 38.d. This measurement is the required thickness of the shim pack. Use an outside micrometer in order to assemble shim pack (12).


      Illustration 46g00537729

    6. Install shim pack (12) onto cage assembly (3). Install O-ring seal (11) onto cage assembly (3). Use six bolts (7) and the washers in order to install cage assembly (7) onto pump drive housing (1). Tighten six bolts (7) to a torque of 47 ± 9 N·m (34.67 ± 6.64 lb ft).


    Illustration 47g00574402


    Illustration 48g00574403

  39. Assemble Tooling (B), as shown. Attach Tooling (B) to pump drive housing (1), as shown. Use Tooling (B) in order to measure the end play of pump drive gear (14) and pump drive gear (15). The total end play of pump drive gear (14) and pump drive gear (15) should be between 0.05 mm (0.002 inch) and 0.15 mm (0.006 inch).

    Note: Shim pack (10) and shim pack (23) should be adjusted in order to achieve a total end play between 0.05 mm (0.002 inch) and 0.15 mm (0.006 inch).



    Illustration 49g00487499

  40. Rotate the gear assemblies in order to check for binding.


    Illustration 50g00486591

  41. Install yoke assembly (4) onto the spline of pump drive gear (14) that is inside of pump drive housing (1).


    Illustration 51g00537725

  42. If necessary, install two dowels (2) onto cage assembly (3).

  43. Add 1 L (1.057 qt) of clean hydraulic oil to the pump drive after final assembly.

End By:

  1. Install the pump drive. Refer to Disassembly and Assembly, "Pump Drive - Install".

Caterpillar Information System:

69D, 769D, 773D, 773E, 776D and 777D Off-Highway Trucks and 771D, 775D and 775E Quarry Trucks Power Train Electronic Control System Economy Shift Function
69D and 769D Off-Highway Truck and 771D Quarry Truck Hydraulic System Gear Pump (Hoist and Brake) Efficiency - Test
69D and 769D Off-Highway Truck and 771D Quarry Truck Air System and Brakes Pressure Protection Valve (Brake Air System)
583R Pipelayer Hydraulic System Boom and Hook Control Valve
793C Off-Highway Truck Power Train Cam and Spring Assembly (Selector and Pressure Control Valve) - Adjust
773D Off-Highway Truck and 775D Quarry Truck Hydraulic System Relief Valve (Hoist Dual Stage) - Test and Adjust
5110B Excavator, 24H Motor Grader, 69D, 769D, 773D, 773E, 776D and 777D Off-Highway Truck/Tractors, 771D, 775D and 775E Quarry Trucks and AD40 Series II, AD45 and AE40 II Underground Articulated Trucks Caterpillar Monitoring System Alert Indicator Description
3306C Engines for Caterpillar Built Machines Fuel System
69D and 769D Off-Highway Truck and 771D Quarry Truck Air System and Brakes Air Tank (Service Brake and Retarder)
69D and 769D Off-Highway Truck and 771D Quarry Truck Air System and Brakes Air Dryer (Brake System)
784C and 785C Off-Highway Trucks Machine Systems Pump Drive - Disassemble
793C Off-Highway Truck Power Train Transmission Hydraulic Control - Test
69D and 769D Off-Highway Truck and 771D Quarry Truck Air System and Brakes Inverter Valve (Secondary Brake)
769D Off-Highway Truck And 771D Quarry Truck Assembly Procedure{7000, 7006, 7960} 769D Off-Highway Truck And 771D Quarry Truck Assembly Procedure{7000, 7006, 7960}
69D and 769D Off-Highway Truck and 771D Quarry Truck Air System and Brakes Air Control Valve (Parking Brake)
69D and 769D Off-Highway Truck and 771D Quarry Truck Air System and Brakes Brake Valve (Parking and Secondary)
216, 226, 228, 232, 236, 242, 246, 248, 252 and 262 Skid Steer Loaders Operation
550 Wheel Harvester, 570 Wheel Harvester and 580 Wheel Harvester Power Train Machine Preparation for Troubleshooting
793C and 793C XQ Off-Highway Truck Air System and Brakes Operational Checks
69D and 769D Off-Highway Truck and 771D Quarry Truck Hydraulic System Relief Valve (Hoist Dual Stage) - Test and Adjust
554 Forwarder and 574 Forwarder Oil Filter (Power Train Charging System) - Replace
550 Wheel Harvester, 570 Wheel Harvester and 580 Wheel Harvester Power Train Visual Inspection
69D and 769D Off-Highway Truck and 771D Quarry Truck Air System and Brakes Air Control Valve (Front Brake)
784C and 785C Off-Highway Truck Power Train Transmission Planetary - Assemble