Usage:
AP-1055B (8BM1-UP, ABB1-UP),
BG-2455C (6TN1-UP, ACM1-UP) Asphalt Pavers
Description of Change: The following tie-down is now available for installation on MTS Asphalt Pavers. The tie-down is to be located on the 106-1048 Rear Track Roller Frame Group.
Assembly
1. Item 172-6783 will need to be butted flush with the rear frame shaft assembly plate (1) and the bogie frame plate (2) in the track assembly.
Detail A
2. Weld per Detail A specification.
Detail B
3. Item 172-0999 should then be located on the 172-6783 Plate per the measurement specification in Detail B.
4. Weld 172-0999 Plate (Tie-down) to 172-6783 Plate per the weld specifications in Detail B.
NOTE: Use the same assembly steps on both sides.