Usage:
April 21, 2005
(Revised November 2005)
U-117
TT-5
Priority |
PRODUCT IMPROVEMENT PROGRAM FOR PERFORMING BASIC ENGINE RECONFIGURATION ON CERTAIN 3126E ON HIGHWAY TRUCK ENGINES MANUFACTURED IN 2002 AND USED IN INDUSTRIAL YARD JOCKEY APPLICATIONS |
|
1062 |
PI30640
|
NOTE: The information supplied in this service letter may not be valid after the termination date of this program. Do not perform the work outlined in this Service Letter after the termination date without first contacting your Caterpillar product analyst.
NOTE: This Revised Service Letter replaces the April 21, 2005 Service Letter. Changes have been made to the Problem Statement, Parts Needed, and the Owner Notification Letter.
COMPLETION DATE |
TERMINATION DATE |
October 31, 2005 | April 30, 2006 |
PROBLEM
Certain 3126E On Highway Truck Engines Manufactured in 2002 and used in Industrial yard jockey applications need to have aftertreatment converter muffler installed.AFFECTED PRODUCT
Model | Identification Number |
3126E | CKM20186, 48301, 48390,
48730, 48472, 50441, 50657, 50746, 50763, 50793, 59255, 59257, 59259, 59264,
59265, 59276, 59289, 59293, 59306, 59323, 59325, 59338, 59340, 59391, 63715,
63843-63847, 63977, 63982, 63996, 63998, 64334, 65631, 66187, 66188, 66191,
66192, 66195, 66196
HEP09610, 9596, 9578, 9592, 9544, 12207, 12203, 12186, 12170, 12221 |
PARTS NEEDED
Part # | Description | QTY | List Price |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
$103.30
|
Contact Larry Aldridge @ Holt-Cat Power Systems to order the above parts. Ph: 903-234-4123
Submit your claim for the above amount plus shipping under misc expenses.
ACTION REQUIRED
The following people should be contacted for the engines sold by their dealerships:Rick Staton (Warren Cat Power Systems) 405-641-6011 - Contact Rick for engines sold by West Texas Cat or Warren Power
Chris Bessemer (High Plains Power) 913-642-1300 - Contact Chris for those engines sold by High Plains Power
Paul Cosper(Holt Power Systems) 972-721-5822 ? Contact Paul for those engines sold by Darr or Holt Power.
See the attached Rework Procedure.
NOTE: For the parts to be installed see the parts needed section.
OWNER NOTIFICATION
U.S. and Canadian owners will receive the attached Owner Notification.SERVICE CLAIM ALLOWANCES
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
NOTE: This is a 1.0-hour
job.
NOTE: U.S. and Canadian Dealers Only - Eligible dealers may enter a Type 2 SIMS Report |
PARTS DISPOSITION
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling.MAKE EVERY EFFORT TO COMPLETE THIS PROGRAM AS SOON AS POSSIBLE.
Attach. (1-Owner Notification)
(2-Rework Procedure)
COPY OF OWNER NOTIFICATION FOR U.S. AND CANADIAN OWNERS
XYZ Corporation3240 Arrow Drive
Anywhere, YZ 99999
PRIORITY - PRODUCT IMPROVEMENT PROGRAM FOR PERFORMING BASIC ENGINE RECONFIGURATION
MODELS INVOLVED - CERTAIN 3126E ON HIGHWAY TRUCK ENGINES MANUFACTURED IN 2002 AND USED IN INDUSTRIAL YARD JOCKEY APPLICATIONS
Dear Caterpillar Product Owner:
Basic engine reconfiguration needs to be performed on the products listed below. Your dealer will install an aftertreatment device (converter muffler) in the exhaust system. You will not be charged for the service performed.
Contact your local Caterpillar dealer immediately to schedule this service. The dealer will advise you of the time required to complete this service. Please refer the dealer to their Service Letter dated April 21, 2005 when scheduling this service.
We regret the inconvenience this may cause you, but urge you to have this service performed as soon as possible to prevent unscheduled downtime.
Caterpillar Inc.
Identification #(s)
Attached to April 21, 2005 Service Letter
Rework Procedure
Step 1: remove clamp and pipe from top of muffler.
Step 2: Remove lower clamp holding elbow going into bottom of muffler.
Step 3:Tap elbow down and remove from muffler.
Step 4:Remove last three clamps holding muffler to bracket and remove muffler.
Step 5: Remove two bolts securing guard to muffler.
Step 6: remove guard
Step 7: Put guard on new converter muffler using 2 new 6 inch bolts and nuts.
Step 8: Slide 1 adapter into each end of converter muffler.
Step 9: Install 3 clamps (5 inch) on converter muffler and secure to brackets, tighten clamps.
Step 10: Install elbow into inlet (lower) of converter muffler.
Step 11: Install 4 inch clamp and tighten.
Step 12:Install outlet pipe into top of converter muffler.
Step 13: Install 4 inch clamp and tighten.
Step 14: Look over to make sure all nuts and bolts are tight.