CX31 On-Highway Transmission Caterpillar


Transmission Planetary - Assemble

Usage:

CX31 D9F

Assembly Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
3E-3880  Eyebolt 
9U-7479  Compressing Tube 
1U-9889  Crossblock 
1B-3573 Bolt 
8T-4994 Hard Washer 
8T-4122 Hard Washer 
8T-4223 Hard Washer 
6V-8188 Nut 
1H-3107  Push-Puller Tool Gp 
5F-7343 Bearing Puller Gp 
1P-0520  Driver Gp 
Threaded Rod
1/2 - 13 by 11 in 
6V-8188 Nut 
5F-7344 Puller Block 
1U-5750  Engine Stand 
350-4401 Adapter 
1P-2850 Oil Drain Cart 
138-7575  Link Bracket 
1P-0510  Driver Gp 
FT-1028  Sleeve Assembly 
1P-0520 Driver Gp 
138-7573  Link Bracket 
376-1570  Plug As. - Extension 
9S-3263  Thread Lock Compound 


NOTICE

Keep all parts clean from contaminants.

Contaminants may cause rapid wear and shortened component life.




    Illustration 1g02453074

  1. Install Tooling (F).

  2. Use Tooling (G) to reposition the transmission housing. The weight of the transmission housing is approximately 41 kg (90 lb).


    Illustration 2g02452549

  3. Install ring seal (119) and ring seal (118).


    Illustration 3g02452547

  4. Install piston (117).


    Illustration 4g02452546

  5. Install springs (116) and pins (115). Install three plates and four discs (114).

    Note: Pins (116) must be installed with the washer end away from the piston.

    Note: Lubricate the plates and discs lightly with the fluid that is being sealed.



    Illustration 5g02452545

  6. Install clutch plate (113). Install ring gear (112).


    Illustration 6g02400836


    Illustration 7g02452542

  7. Install bearing (111) and thrust washers (110) onto planetary gear (109).

  8. Install planetary gear (109). Install shaft (108). Install pin (107).

  9. Repeat Step 7 and Step 8 for the remaining planetary gears.


    Illustration 8g02452541

  10. Compress lock ring (105) and install planetary carrier (103) onto ring gear (106). Install retaining ring (104).

    Note: Use suitable blocking to support the planetary carrier.



    Illustration 9g02452539


    Illustration 10g02452564

  11. Use Tooling (L) and a suitable lifting device to install planetary carrier (103). The weight of planetary carrier (103) is approximately 20 kg (44 lb). Install thrust bearing (102). Ensure that thrust bearing (102) is orientated correctly.


    Illustration 11g02452536

  12. Install bearing carrier (101), sun gear (100), and retaining ring (99).


    Illustration 12g02452516


    Illustration 13g02452619

  13. Install shaft assembly (98). Install thrust bearing (97). Ensure that thrust bearing (97) is orientated correctly.


    Illustration 14g02452503

  14. Install springs (96) and pins (95). Install six plates and seven discs (94).

    Note: Pins (95) must be installed with the washer end away from the piston.

    Note: Lubricate the plates and discs lightly with the fluid that is being sealed.



    Illustration 15g02452517

  15. Install O-ring seals (93) and seal (92).


    Illustration 16g02452500

  16. Install bearing assembly (91) into shaft (90). Install shaft (90) into planetary carrier (74).


    Illustration 17g02452372


    Illustration 18g02452356

  17. Install bearings (89) and thrust washers (88) onto planetary gear (87).

  18. Install planetary gear (87). Install shaft (86). Install pin (85).

  19. Repeat Step 17 and Step 18 for the remaining planetary gears.


    Illustration 19g02452337

  20. Raise the temperature of bearing cone (84). Install bearing cone (84). Install bearing spacer (83).


    Illustration 20g02452661


    Illustration 21g02451680

  21. Lower the temperature of bearing cup (82). Use Tooling (J), bearing cone (80), and a suitable press to install bearing cup (82). Install retaining ring (81). Ensure that bearing cup (82) is seated correctly.


    Illustration 22g02452706

  22. Position housing assembly (73) onto planetary carrier (74).


    Illustration 23g02456616


    Illustration 24g02451578

  23. Raise the temperature of bearing cone (80). Install bearing cone (80) and output rotor (79). Use Tooling (K), output rotor (79), and a suitable press to press bearing cone (80) onto planetary carrier (74).

  24. Use Tooling (E) to install lip seal (78).

    Note: Lubricate the sealing lip of lip seal (78).



    Illustration 25g02451277

  25. Install seals (77) onto piston (76).


    Illustration 26g02451136

  26. Install piston (76). Install Tooling (M).


    Illustration 27g02452750


    Illustration 28g02450481

    ------ WARNING! ------

    Personal injury can result from being struck by parts propelled by a released spring force.

    Make sure to wear all necessary protective equipment.

    Follow the recommended procedure and use all recommended tooling to release the spring force.


  27. Use Tooling (H) and a suitable lifting device to install housing assembly (73) and planetary carrier (74) as a unit. The weight of housing assembly (73) and planetary carrier (74) is approximately 39 kg (86 lb).

  28. Install bolts (75). Tighten bolts (75) to a torque of 100 ± 20 N·m (74 ± 15 lb ft).

  29. Remove Tooling (M).


    Illustration 29g02389756

  30. Install O-ring seal (72). Repeat this step for the remaining speed sensor.


    Illustration 30g02389738

  31. Install yoke (71). Install O-ring seal (70), and retainer (69). Apply Tooling (N) onto bolt (68). Install bolt (68). Tighten bolt (68) to a torque of 270 ± 40 N·m (199 ± 30 lb ft).


    Illustration 31g02389737

  32. Install speed sensor (67). Install bolt (66) and the retainer. Tighten bolt (66) to a torque of 28 ± 7 N·m (21 ± 5 lb ft). Install speed sensor (65). Install bolt (64) and the retainer. Tighten bolt (64) to a torque of 28 ± 7 N·m (21 ± 5 lb ft).


    Illustration 32g02389736

  33. Connect harness assemblies (63) and install the connecting hardware.

  34. Use Tooling (G) to reposition the transmission. The weight of the transmission is approximately 181 kg (400 lb).


    Illustration 33g02453068

  35. Remove Tooling (F).


    Illustration 34g02389715

  36. Install seal ring (62) and seal ring (61) onto piston (58).


    Illustration 35g02389710


    Illustration 36g02452768

  37. Install thrust bearing (60). Install thrust disc (59). Install piston (58). Ensure that thrust bearing (60) is orientated correctly.


    Illustration 37g02389703


    Illustration 38g02389704


    Illustration 39g02390856
    Dimension (X) equals 0.25 ± 0.13 mm (0.010 ± 0.005 inch).

  38. Install bearings (57) and thrust discs (56) onto planetary gear (55). Install planetary gear (55). Install shaft (54). Install pin (53). Repeat this step for the remaining planetary gears.

  39. Lower the temperature of bearing sleeve (52). Use Tooling (D) to install bearing sleeve (52) to a depth that is equal to Dimension (X) from Surface (Y).


    Illustration 40g02389702

  40. Compress retaining ring (50). Install planetary carrier (49) onto ring gear (51).

    Note: Use suitable blocking to support the planetary carrier.



    Illustration 41g02389701

  41. Use two people to install planetary carrier (49). The weight of planetary carrier (49) is approximately 16 kg (35 lb).


    Illustration 42g02389699


    Illustration 43g02452785

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.


  42. Install springs (48) and pins (47). Install three plates and four discs (46). Install thrust bearing (45). Ensure that thrust bearing (45) is orientated correctly.

    Note: Lubricate the plates and discs with the fluid that is being sealed.



    Illustration 44g02389698

  43. Install sun gear (44), spring (43), and O-ring seals (42).


    Illustration 45g02389559

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.


  44. Install manifold assembly (41). Install bolts (40). Tighten bolts (40) to a torque of 100 ± 20 N·m (74 ± 15 lb ft).


    Illustration 46g02389557

  45. Install seal rings (39).


    Illustration 47g02389536

  46. Lower the temperature of bearing cup (38). Install bearing cup (38) into housing (36).


    Illustration 48g02390864

  47. Raise the temperature of housing (36). Install housing (36) and bearing cone (37).

  48. Install O-ring seals (35).


    Illustration 49g02389396


    Illustration 50g02389397

  49. Install O-ring seal (34), seal ring (33), and bearing assembly (32).


    Illustration 51g02389380

  50. Install hub assembly (31). Install screws (30). Tighten screws (30) to a torque of 12 ± 3 N·m (106 ± 27 lb in).


    Illustration 52g02389376

  51. Install seal ring (29) onto piston (28).


    Illustration 53g02389357

  52. Install piston (28).


    Illustration 54g02389356

  53. Install spring (27).


    Illustration 55g02389349

  54. Install seal ring (26) onto balance piston (24).


    Illustration 56g02453063

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.


  55. Use Tooling (C) to compress balance piston (24).

  56. Install screws (25). Tighten screws (25) to a torque of 28 ± 7 N·m (21 ± 5 lb ft).

  57. Remove Tooling (C).


    Illustration 57g02389344

  58. Install three plates and three discs (23).

    Note: Lubricate the plates and discs lightly with the fluid that is being sealed.



    Illustration 58g02389340

  59. Install hub (22). Install thrust disc (21), plate (20), and retaining ring (19).


    Illustration 59g02389338

  60. Install O-ring seal (18) and seal ring (17). Install bearing (16).


    Illustration 60g02389336

  61. Install ring seal (15) onto piston (14).


    Illustration 61g02389318

  62. Install piston (14).


    Illustration 62g02453062

    ------ WARNING! ------

    Improper assembly of parts that are spring loaded can cause bodily injury.

    To prevent possible injury, follow the established assembly procedure and wear protective equipment.


  63. Install spring (12) and retainer (11).

  64. Use Tooling (B) and a suitable press to compress retainer (11) and spring (12). Install retaining ring (13).


    Illustration 63g02388981

  65. Install thrust bearing (10).


    Illustration 64g02388980

  66. Install hub (8). Install retaining ring (7). Install five plates and five discs (9).

    Note: Apply a thin coat of transmission oil onto the plates and discs prior to assembly.



    Illustration 65g02388976

  67. Install plate (6) and retaining ring (5). Turn over rotating clutch (1).


    Illustration 66g03740012


    Illustration 67g02458116

  68. Install thrust bearing (4) and bearing (3). Ensure that thrust bearing (4) is orientated correctly.


    Illustration 68g02453061

  69. Use Tooling (A) and a suitable lifting device to install rotating clutch (1). The weight of rotating clutch (1) is approximately 27 kg (60 lb).

End By:

  1. Install the oil filter and base. Refer to Disassembly and Assembly, "Oil Filter and Base (Power Train) - Remove and Install".

  2. Install the torque converter housing. Refer to Disassembly and Assembly, "Torque Converter Housing - Install".

  3. Install the torque converter. Refer to Disassembly and Assembly, "Torque Converter - Install".

Caterpillar Information System:

CX31 On-Highway Transmission Transmission Planetary - Disassemble
C7 Marine Engine Coolant (ELC) - Change
C7 Marine Engine Coolant (DEAC) - Change
C7 Marine Engine Product Description
2011/01/06 A New Exhaust Plug Is Used on Certain C18 Engines {1058, 1061}
320 VH and VM Variable Gauge Undercarriage Travel Motor - Assemble
C-12 Engine Grounding Stud - Inspect/Clean/Tighten
C-12 Engine Compression Brake - Inspect/Adjust/Replace
2011/01/20 A New Valve Bridge Is Available for Certain Machines {1121}
2011/01/06 A New Valve Bridge Is Available for Certain Commercial Engines {1121}
320 VH and VM Variable Gauge Undercarriage Travel Motor - Disassemble
312E, 312F, 313F, 316E, 316F, 318E, 318F, 320E, 320F, 323E, 323F, 324E, 325F, 326F, 329E, 329F, 330F, 335F, 336E, 336F, 340F, 349E, 349F, 352F, 374F and 390F Excavators and 336E MHPU and 349E MHPU Mobile Hydraulic Power Units Air Conditioning and Hea Air Conditioning E45 - Air Inlet Damper Error
Procedure for Replacement Grouser Bars {0679, 4172, 4173, 7950} Procedure for Replacement Grouser Bars {0679, 4172, 4173, 7950}
C15 and C18 Petroleum Generator Sets Coolant Extender (ELC) - Add
C7 Marine Engine Refill Capacities
3508B, 3508C, 3512B, 3512C, 3516B and and 3516C Marine Engines Fluid Recommendations
C7 Marine Engine Engine Air Cleaner Element (Single Element) - Inspect/Clean/Replace
C7 Marine Engine Engine Speed/Timing Sensor - Clean/Inspect
349F and 352F Excavators Machine System Specifications Swing Gear and Bearing
Equipment and Tools for Undercarriage Rebuilding and Reconditioning Stations {0729, 4150} Equipment and Tools for Undercarriage Rebuilding and Reconditioning Stations {0729, 4150}
336F MHPU Mobile Hydraulic Power Unit Machine System Specifications Air Cleaner - Mounting
Procedures to Salvage Thrust Faces on Planetary Carriers {3160, 4050, 4051, 4093} Procedures to Salvage Thrust Faces on Planetary Carriers {3160, 4050, 4051, 4093}
A New Aftercooler Is Used on Certain C9 Marine Engines {1063} A New Aftercooler Is Used on Certain C9 Marine Engines {1063}
Troubleshooting the Hydraulic Electronic Unit Injection (HEUI) Fuel System On C7 and C9 Engines{1250} Troubleshooting the Hydraulic Electronic Unit Injection (HEUI) Fuel System On C7 and C9 Engines{1250}
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.