Parallel Setpoint Programming OP5-3
The Synchronization setpoints within the GSC+P define various parameters that allow precise frequency and phase matching.
The setpoints are programmed (set) in the GSC+P at the factory to the default values that are in the following chart. The setpoints may be changed to satisfy the requirements of the customer. Also the setpoints may be changed to satisfy the requirements of the application.
Show/hide table
OP5-3 Setpoints - Paralleling Programming     | ||||
Setpoint     | Name     | Description     | Range Of Value     | Factory Default     |
P301     | Synchronization Enable     | Enables or disables the synchronization function, and specifies the type of Load Share control being driven.     | 0 - disabled 1 - Woodward     |
0     |
P302     | Breaker Coil Time Limit     | The maximum amount of time the breaker coil can be energized without damaging the coil.     | 0.2 to 5.0 seconds in increments of 0.1 second     | 1.0 second     |
P303     | Voltage Limit Enable     | Enables or disables the generator/bus voltage checking during automatic synchronization     | 0 - disabled 1 - enabled     |
1     |
P304     | Voltage Limit     | The maximum acceptable difference between the bus voltage and the oncoming voltage, expressed as a percentage of bus voltage.     | 1% to 15 % in increments of 1%     | 1%     |
P305 (1)     | Phase Tolerance Limit     | The maximum phase angle magnitude allowed for breaker closure     | 1 to 25 degrees in increments of 1 degree     | 5 degrees     |
P306 (1)     | Dwell Time     | The time during which the phase angle between the generator and the bus during synchronization.     | 0.1 to 1.0 seconds in increments of 0.1 second     | 0.5 second     |
P307 (1) (2)     | Speed Control Gain     | Controls how fast the engine speed will change during synchronization.     | 0.0% to 100.0% in increments of 0.1%     | 50.0%     |
P308 (1) (2)     | Speed Control Rate     | Controls the rate of change of the phase angle differencebetween the generator and the bus during synchronization.     | 0.0% to 100.0% in increments of 0.1%     | 50.0%     |
P309 (1) (2)     | Speed Control Damping     | Controls the amount of overshoot and settling time of engine speed during synchronization.     | 0.0% to 100.0% in increments of 0.1%     | 0.0%     |
P310     | Dead Bus Closure Enable     | Enables or disables automatic closing to a dead bus.     | 1 - enabled (3) 0 - disabled     |
0     |
P311     | Dead Bus Limit     | The maximum acceptable voltage for the bus to be considered dead, as a percent of rated voltage.     | 5% to 50% in increments of 1%     | 20%     |
P312     | Dead Bus On Time Delay     | The amount of time the GSC+P waits before closing to a dead bus.     | 0 to 120 seconds in increments of 1 second     | 0 seconds     |
P313     | Frequency Match Notification Time     | The amount of time before notification of possible synchronization failure. Must not be greater than the Maximum Synchronization Time.     | 5 to 1000 seconds in increments of 1 seconds     | 20 seconds     |
P314     | Maximum Synchronization Time     | The maximum amount of time to spend attempting to synchronize before setting the Synchronization Time-out Alarm     | 5 to 1000 seconds in increments of 1 second     | 30 seconds     |
Show/hide table
( 1 ) | P305, P306, P307, P308, and P309 can be adjusted to precisely match individual engine response and breaker closure characteristics using OP11 - Synchronization Setpoint Tuning. |
( 2 ) | The GSC+P uses P-I-D (proportional-integral-derivative) control to accomplish synchronization quickly and smoothly. The P parameter, I parameter, and D parameter are independantly controlled by setpoints P307, P308, and P309 respectively. Adjusting any one of these setpoints will not affect the other two settings. For more information, see Systems Operation, "Synchronization Mode" Setpoint Tuning. |
( 3 ) | Dead bus closure will only work in the automatic mode, NOT in permissive mode or semi automatic mode. |
Caterpillar Information System:
3500B Engines for Caterpillar Built Power Modules with the ADEM 3 Electronic Control Module Sensor Signal (Analog, Active) - Test
3500B Engines for Caterpillar Built Power Modules with the ADEM 3 Electronic Control Module Boost Pressure Is High
G3500 Generator Sets Parallel Operation
3500B Engines for Caterpillar Built Power Modules with the ADEM 3 Electronic Control Module Sensor Signal (PWM) - Test
C7, C9, C13 and C15 On-highway Engines (California Air Resources Board Idle Reduction Information) Monitoring System - Additional Information for 2008 Caterpillar On-highway Engines which are Regulated by the California Air Resources Board (CARB)
G3500 Generator Sets Electrical System
Electronic Modular Control Panel II+ Paralleling (EMCP II+P) GSC CID 0269 - FMI 03
3500 Engines Air Inlet and Exhaust Lines
2008/02/01 A New Plug and O-ring Are Now Used on the Cylinder Head {1100}
2008/02/25 A New Plug and O-ring Are Now Used on the Cylinder Head {1100}
G3600 Engines Speed Control (Switch) - Test
G3612 and G3616 Engines Prechamber Ignition Body - Install
3500B Engines for Caterpillar Built Power Modules with the ADEM 3 Electronic Control Module Coolant Temperature Is High
G3500 Generator Sets Crankshaft Vibration Damper - Inspect - Fluid Sample
3500B Engines for Caterpillar Built Power Modules with the ADEM 3 Electronic Control Module Coolant Temperature Is Low
3500B Engines for Caterpillar Built Power Modules with the ADEM 3 Electronic Control Module Crankcase Pressure Is High
G3500 Generator Sets Engine Speed/Timing Sensor - Clean/Inspect
Electronic Modular Control Panel II+ Paralleling (EMCP II+P) Normal Mode
3516C Generator Set Engine Engine Does Not Crank
G3600 Engines Detonation - Test
C-10 and C-12 Truck Engines Speed/Timing Sensor
3500B Engines for Caterpillar Built Power Modules with the ADEM 3 Electronic Control Module Exhaust Temperature Is High
3500B Engines for Caterpillar Built Power Modules with the ADEM 3 Electronic Control Module Fuel Filter Is Restricted
C9 Petroleum Engines Aftercooler - Remove