UPS 1000S/ UPS 1200S Uninterruptible Power Supplys Caterpillar


Cable Landing (Input/Output Cabinet)

Usage:

ES12F CZE



Illustration 1g01342344

Input/Output Cabinet - Left View

(1) Left Component Panel

(2) Ground

(3) Output Breaker K5 (Optional)

(4) Input Breaker K1

There are seven copper input cable landings in the Input/Output Cabinet. Each of the cable landings have a tin coating. There is one landing for each phase of the three-phase input utility power. There is one landing for each phase of the three-phase output power. There is one landing for the ground. Refer to Illustration 1 for cable landing locations.

The input cable landings are designed to accommodate 500 kcmil cable to 750 kcmil cable.

The installer will punch the appropriate hole pattern for trade size conduit depending on the size and number of input cables.

Cable Landing Phase Bar Removal

  1. Perform steps in the Systems Operation, Testing and Adjusting, "Internal Component Preremoval Steps (Input/Output Cabinet)" in order to de-energize the system and gain access to internal components.

  1. Disconnect the utility input cables from the cable landing.

  1. Disconnect the wires that are connected to the back of the cable landing.

  1. Remove the capacitor banks that are located at the back of the cable landing.

    Refer to Systems Operation, Testing and Adjusting, RENR7654, "Capacitor (Input/Output Cabinet)" for removal steps.

  1. Loosen the back three bolts that connect the landing to the cabinet.

  1. Loosen the front three bolts that connect the landing to the vertical bus bar leading into the circuit breaker.

  1. Loosen the four bolts that connect the Maintenance Bypass output bus bars to the K5 cable landing.

    Note: Only for output cable landing removal with Maintenance Bypass Option installed.

  1. Remove the cable landing.

Cable Landing Phase Bar Installation

  1. Place the cable landing in position.

    Refer to Illustration 1.

  1. Attach the front landing to the vertical bus bar that extends from the top of the circuit breaker. Accomplish this task by inserting three bolts with the heads of the bolts toward the rear of the cabinet.



    Illustration 2g01271171

    (20) Nut

    (21) Belleville Washer

    (22) Grade 8 Coated Steel Washer

    (23) Bus Bars

    (24) Bolt

  1. Attach washers and nuts in the order indicated in Illustration 2.

    Note: In all cases, the side of the belleville washer that curves inward should be placed facing the bus bar.

  1. Insert three bolts at the back of the cable landing.

    Place bolt and steel washer through the following components: the cable landing and a red insulating spacer Attach the bolts to the threaded huck rivets at the back of the cabinet.

    Note: Step 5 is for output cable landing installation with Maintenance Bypass Option.

  1. Attach the vertical bus bars that extend from the Maintenance Bypass Cabinet to the output cable landing. Use four bolts through the right side of the bus bars.

    Note: Step 6 is for output cable landing installation with Maintenance Bypass Option.

  1. Secure the bus bars via the attachment method that is shown in Illustration 2.

  1. Attach the capacitor banks that are located at the back of the cable landing.

    Refer to Systems Operation, Testing and Adjusting, RENR7654, "Capacitor (Input/Output Cabinet)" for installation steps.

  1. Attach the wires leading to the fuses and circuit breakers to the pegs at the back of the cable landing.

    Table 1
    Wire Color     Phase    
    Brown     A    
    Orange     B    
    Yellow     C    

  1. Attach the utility input cables to the bus bar.

  1. Tighten all bus bar hex nuts to 150 N·m (110 lb ft).

  1. Tighten the utility input cable hex nuts to appropriate specifications.

    Note: Always tighten the hex nut while holding the bolt in position.

Cable Landing Ground Bar Removal

  1. Perform steps in the Systems Operation, Testing and Adjusting, "Internal Component Preremoval Steps (Input/Output Cabinet)" in order to de-energize the system and gain access to internal components.

  1. Disconnect the utility input cables from the ground cable landing that is located at the top of the rear panel of the cabinet.

  1. Loosen the four bolts that connect the landing to the cabinet frame.

  1. Remove the cable landing.

Cable Landing Ground Bar Installation




    Illustration 3g01342530

    Input/Output Cabinet Rear Panel

    (25) MOV Surge Protector

    (26) MOV Circuit Breaker (K10)

    (27) Wire Terminal

    (28) Ground

  1. Place the ground cable landing in position at the top of the rear panel in the cabinet.

    Refer to Illustration 3.

  1. Attach the landing to the rear of the cabinet by inserting four bolts. Use one grade 8 coated steel washer with each bolt.



    Illustration 4g01342532

    (30) Nut

    (31) Belleville Washer

    (32) Grade 8 Coated Steel Washer

    (33) Bus Bars

    (34) Bolt

    (35) Cable Lug

  1. Attach the utility input ground cables to the bus bar.

    Refer to Illustration 4.

    Note: In all cases, the side of the belleville washer that curves inward should be placed facing the bus bar.

  1. Tighten all ground bus bar bolts to 150 N·m (110 lb ft).

  1. Tighten the input ground cable hex nuts to appropriate specifications.

    Note: Always tighten the hex nut while holding the bolt in position.

Caterpillar Information System:

C15 and C18 Petroleum Generator Sets Fuel System Primary Filter/Water Separator - Drain
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys Breaker Bell Alarm Supervisor Board
TH48-E70 Petroleum Transmission Specifications
C11 and C13 Petroleum Engines Fuel System Secondary Filter - Replace
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys Reset Pushbutton
797F Off-Highway Truck Steering System Steering Accumulator
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys System Fuse (Input/Output Cabinet)
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys Internal Component Preremoval Steps (Input/Output Cabinet)
UPS 120, UPS 150, UPS 250, UPS 300, UPS 301, UPS 500, UPS 600, UPS 750 and UPS 900 Uninterruptible Power Supplies Personal Computer to UPS Connection
UPS 120, UPS 150, UPS 250, UPS 300, UPS 301, UPS 500, UPS 600, UPS 750 and UPS 900 Uninterruptible Power Supplies Firmware - Update
CX35 On-Highway Transmission Lubricant Viscosities
UPS 120, UPS 150, UPS 250, UPS 300, UPS 301, UPS 500, UPS 600, UPS 750 and UPS 900 Uninterruptible Power Supplies Log File - Retrieve
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys Circuit Breaker (K1, K5)
C18 Petroleum Generator Sets Cooling System Coolant (ELC) - Change
CD44B and CD54B Vibratory Asphalt Compactors High Pressure Fuel Lines
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys MOV Circuit Breaker (K10)
UPS 120, UPS 150, UPS 250, UPS 300, UPS 301, UPS 500, UPS 600, UPS 750 and UPS 900 Uninterruptible Power Supplies Service Tools
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys MOV Surge Protector
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys Discharge Resistor
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys External Source Sync PWA (Input/Output Cabinet)
UPS 120, UPS 150, UPS 250, UPS 300, UPS 301, UPS 500, UPS 600, UPS 750 and UPS 900 Uninterruptible Power Supplies Storage
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys External Source Sync Terminal Block
3508 EUI Engine for Off-Highway Truck/Tractors Gear Group (Rear)
UPS 1000S/ UPS 1200S Uninterruptible Power Supplys Gen Set Module Circuit Breaker
Back to top