Pump Performance (Implement) (Lift Time) - Test
The performance of the implement pumps can be tested by determining the lift time for each implement pump.
- Start the engine. Warm the hydraulic oil to a normal operating temperature of
68° ± 20°C (154° ± 36°F) .Show/hide tableIllustration 1 g01445414 - Select "Service" from the "Home Menu" on the Advisor display.
Show/hide table
Illustration 2 g01445436 - Select "Service Modes" from the "Service" menu on the Advisor display.
Show/hide table
Illustration 3 g01445450 - Select "Implement" from the "Service Modes" menu on the Advisor display.
Show/hide table
Illustration 4 g01446827 - Select "Lift Time Checks" from the "Implement" menu on the Advisor display.
Show/hide table
Illustration 5 g01446829 - Select one of the three implement pumps and press the "OK" button.
- Follow the instructions on the screen in order to check the performance of the pump.
- Repeat the test for each implement pump.
- The correct lift times for each pump are shown in Table 1.
Show/hide table
Table 1 Lift Times Pump Time Center
250 cc (15.3 in3) 23.8 seconds Right Rear
250 cc (15.3 in3) 23.8 seconds Right Front
180 cc (11.0 in3) 36.9 seconds
Caterpillar Information System:
994F Wheel Loader Pump Drive (Rear) to Engine - Connect
2008/02/11 The Improved Software for the Autolube {7540, 7610, 7620}
992K Wheel Loader and 854K Wheel Dozer Braking System Brake System Troubleshooting
2008/01/28 New Driveline Components Improve Service Life of Wheel Loaders {3253, 3267}
2007/12/31 A New Calibration Procedure is Now Available {4269}
992K Wheel Loader and 854K Wheel Dozer Steering System Gear Pump (Steering Oil Cooler) (Steering Pilot)
994F Wheel Loader Pump Drive (Rear) from Engine - Separate
993K Wheel Loader Electrohydraulic System Piston Pump Margin Pressure (Hydraulic Fan) - Test and Adjust
992K Wheel Loader and 854K Wheel Dozer Power Train Trunnion Support (Oscillating Axle, Front) - Remove
993K Wheel Loader Engine Supplement Engine - Remove
AD55B Underground Articulated Truck C27 Engine Supplement Bottom Guard (Engine) - Remove and Install
AD55B Underground Articulated Truck Power Train Drive Shaft (Upper) - Remove and Install
992K Wheel Loader and 854K Wheel Dozer Power Train Trunnion Support (Oscillating Axle, Front) - Install
Failed Relays are Reported in the Secondary Steering System{4493, 7620} Failed Relays are Reported in the Secondary Steering System{4493, 7620}
992K Wheel Loader and 854K Wheel Dozer Power Train Trunnion Support (Oscillating Axle, Front) - Disassemble
992K Wheel Loader and 854K Wheel Dozer Power Train Trunnion Support (Oscillating Axle, Front) - Assemble
993K Wheel Loader Power Train Torque Converter Stall (3FWD) - Test
854K Wheel Dozer Oil Renewal System Oil - Add - If Equipped
993K Wheel Loader Power Train Torque Converter Stall (1FWD) - Test
993K Wheel Loader Electrohydraulic System Torque Converter Stall and Implement Pump Double Stall - Test
993K Wheel Loader Power Train Differential Backlash and Bearings - Adjust
993K Wheel Loader Electrohydraulic System Pressure Reducing Valve (Implement Pilot Oil) - Test and Adjust
C9.3 Tier 4 Final Engines Engine Oil Filter Base
994H Wheel Loader Machine Systems Window Wiper and Wiper Motor (Rear) - Install