PRODUCT SUPPORT PROGRAM FOR RELOCATING A CHECK VALVE IN THE AXLE OIL COOLING SYSTEM ON CERTAIN 988G WHEEL LOADERS AND 834G WHEEL DOZERS |
|
1365 5067 |
PS41131
|
NOTE: The information supplied in this service letter may not be valid after the termination date of this program. Do not perform the work outlined in this Service Letter after the termination date without first contacting your Caterpillar product analyst.
Termination Date
October 31, 2004PROBLEM
A check valve may need to be relocated in the axle oil cooling system on certain 988G Wheel Loaders and 834G Wheel Dozers equipped with an axle cooler. The core assembly for the axle oil cooler can fail when the system is operated in severe cold temperatures (below -18 degrees C (0 degrees F)). The increased viscosity of the cold oil can create high pressures in the axle oil cooler system and rupture the rear core assembly. A check valve can be relocated to eliminate this problem.AFFECTED PRODUCT
Model | Identification Number |
|
|
988G |
|
834G |
|
|
|
988G |
|
834G |
|
PARTS NEEDED
1 - 8C9029 Union
1 - 3D2824 Seal - O-Ring
3 - 7M8485 Seal - O-Ring
1 - 6V5258 Adapter
1 - 6V8716 Connector
1 - 6V8990 Elbow - 45 Degree (for
834G only)
5 - 6V9746 Seal - O-Ring (only four
are needed for 988G)
1 - 1234021 Hose Assembly (dealer
fabricated)
1 - 1947276 Hose Assembly (dealer
fabricated)
***** Group 2 *****
1 - 8C9029 Union
1 - 3D2824 Seal - O-Ring
3 - 7M8485 Seal - O-Ring
1 - 6V5258 Adapter
1 - 6V8716 Connector
1 - 6V8791 Tee
6 - 6V9746 Seal - O-Ring
1 - 2232111 Hose Assembly (for 988G
only - dealer fabricated)
1 - 2232112 Hose Assembly (dealer
fabricated)
1 - 2253035 Hose Assembly (for 834G
only - dealer fabricated)
ACTION REQUIRED
See the attached Rework Procedure.SERVICE CLAIM ALLOWANCES
Product smu/age whichever comes first |
|
|
|
|||
Parts |
|
|
|
|
|
|
0-24 months |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PARTS DISPOSITION
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling.Attach. (1-Rework Procedure)
Rework Procedure
Illustration 1
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- Remove the existing hoses, seals and fittings from connections B to C and from connections A to D. Do not discard the existing check valve.
- For 6GZ1-Up machines, remove the union assembly at connection C. Install a new 45-degree elbow (8) and seal (7) where the union was removed.
- Install the new Hose Assembly (1) from B to C, as shown in Illustration 1. Use a new seal (7) at both ends of the hose.
- Install new adapter assembly (2) and union assembly (3) at connection A. Install the existing check valve (4). The check valve should flow to connection D and away from connection A. Install new connector assembly (5). Install the new hose assembly (6) to connection D, as shown in Illustration 1. Use a new seal (7) at connection D. Illustration 1 shows the finished installation.
Illustration 2
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- Remove the existing hoses, seals and fittings from connections B to C and from connections A to D. Remove the existing tee at B. Do not discard the existing check valve.
- Install the new tee and seals (8) at connection B. Install the new hose assembly (1) from B to C, as shown in Illustration 2. Use a new seal (7) at the end of the hose near connection (C).
- Install new adapter assembly (2) and union assembly (3) at connection A. Install the existing check valve (4). The check valve should flow to connection D and away from connection A. Install new connector assembly (5). Install the new hose assembly (6) to connection D, as shown in Illustration 2. Use a new seal (7) at connection D. Illustration 2 shows the finished installation.
Illustration 3 - Left side view of cooler core
Additional contributors to core failure can include reverse installation of the core bypass check valves (1) or reverse connection of the hoses to the cooler group (3). Verify that the check valves located just outside of the core face allow flow from the front to the rear of the cores, as they are oriented in the machine. The arrow on the check valve should be checked to make sure that the direction matches Illustration 3. Verify that the hoses are connected such that flow from the pump enters the fan motor (for the rear circuit) and filters before entering the cores.