Aftercooler - Install
Show/hide table
NOTICE |
---|
Keep all parts clean from contaminants. Contaminants may cause rapid wear and shortened component life. |
- Inspect the condition of the gaskets and O-ring seals. Replace the gaskets and the O-ring seals, if necessary.
Show/hide table
Illustration 1 g00771580 Show/hide tableIllustration 2 g00771582 - Install O-ring seal (29) in elbows (22) and (20).
Show/hide table
Illustration 3 g00771526 - Position nylon straps (24) and attach a suitable lifting device on aftercooler (25).
- Install the aftercooler on the engine.
Show/hide table
Illustration 4 g00771527 - Install the nuts on two bolts (26) on front side of mounting plate (27) and on the rear side mounting plate.
Show/hide table
Illustration 5 g00771541 - Install two bolts (28) on both sides of the mounting plate for the aftercooler.
- Remove the nylon straps from the aftercooler.
Show/hide table
Illustration 6 g00770312 - Install four bolts (23) that fasten pipe (22) to the turbocharger compressor housing on each side of the engine.
Show/hide table
Illustration 7 g00770311 - Install four bolts (21) that fasten elbow (20) to the throttle control valve.
Show/hide table
Illustration 8 g00770310 - Put the gaskets in position and install elbows (18) and (19) on the bonnet of the aftercooler.
Show/hide table
Illustration 9 g00770309 - Put the O-ring seals on tube assemblies (16) and (17). Install tube assembly (16) and tube assembly (17) in the bonnet of the aftercooler.
Show/hide table
Illustration 10 g00770308 - Position tube assembly (15) and install two brackets (13).
- Install tube assembly (14) on tube assembly (15).
- Install tube assemblies (11) and (12).
Show/hide table
Illustration 11 g00770307 - Put tube assembly (9) in position and install the clamp and support bracket (7).
- Install tube assemblies (8) and (10).
- Position tube assembly (1) and install clamp (6) that fastens the tube assembly to the elbow.
Show/hide table
Illustration 12 g00770306 - Position tube assembly (1) in the elbow and install clamp (2).
- Position tube (4) and install the clamps.
- Install support bracket (3).
- Install tube assembly (5).
End By:
- Install the fuel control valve.
- Install the gas pressure regulator solenoid.
Caterpillar Information System:
G3406 Engine Engine Monitoring System
Unpacking Instructions for the Uninterruptible Power Supply{4480} Unpacking Instructions for the Uninterruptible Power Supply{4480}
3406E Marine Engine Engine Lifting Bracket - Remove and Install
3304B-XQ125 Rental Generator Set Electric Starting
3406E Marine Engine Exhaust Manifold - Remove and Install
2001/09/01 New Cylinder Head Groups Provide Increased Valve Life {1100, 1103, 1104}
2001/02/01 New Cylinder Head Groups Will Provide Improved Reliability {1100, 1103, 1104}
C-9 Industrial Engine Gear Group (Front) - Time
C-9 Engines for Caterpillar Built Machines Basic Engine
3304B-XQ125 Rental Generator Set Reference Material
3126B and 3126E On-highway Engines Inlet Air Temperature Sensor - Remove and Install
3126B and 3126E On-highway Engines Atmospheric Pressure Sensor - Remove and Install
C15 and C18 Generator Set Engines Electronic Unit Injector - Install
3306B-XQ200 Rental Generator Set Engine Model View Illustrations
3306B-XQ200 Rental Generator Set Engine Engine Description
G3516B and G3520B Generator Set Engines Aftercooler - Remove
3306B-XQ200 Rental Generator Set Engine General Hazard Information
PM3516 Power Modules Product Description
PM3516 Power Modules Product Lifting
3306B-XQ200 Rental Generator Set Engine Before Towing
XQ300, XQ400 Rental Generator Sets Safety Signs and Labels
3116 On Highway Engines Fuel Transfer Pump - Remove and Install
PM3516 Power Modules Fan Motor - Lubricate
3306B-XQ200 Rental Generator Set Engine Fuel System Secondary Filter - Replace