Track - Connect
Connection Procedure for the Track on CIPI Undercarriage Arrangements which are Based on 330 Track Type Excavators
Show/hide table
Required Tools     | |||
---|---|---|---|
Tool     | Part Number     | Part Description     | Qty     |
A     | 1P-3545     | Track Chain Coupler     | 1     |
B     | 1P-3533     | Carrier Bar     | 1     |
C     | 1P-7402     | Coupling Tool Group     | 1     |
D     | 1P-3530     | Seal Installation Tool Group     | 1     |
E     | 5P-6214     | Track Block Assembly     | 1     |
F     | 5P-2380     | Master Pin Press Arrangement     | 1     |
4C-4865 | Hand Hydraulic Pump (or Electric)     | 1     | |
G     | 1U-7631     | Impact Socket     | 1     |
- Install Tooling (A) in the track link and on the sprocket, as shown.
Show/hide table
Illustration 1 | g00490683 |
- Start the machine. Move the sprocket forward until the track assembly is pulled up on the sprocket. Move the sprocket forward until the end of the track assembly is past a vertical line through the center of the sprocket. Remove Tooling (A) .
- Install Tool (B) between the first bushing in the track link and the sprocket, as shown.
Show/hide table
Illustration 2 | g00490689 |
- Move the sprocket forward. Use Tooling (B) to guide the track assembly over the track carrier rollers and the front idler.
- Install Tool (C) and pin (1) from Tooling (A) between the track links in the ends of the track assembly, as shown.
Show/hide table
Illustration 3 | g00490692 |
- Move the track assembly forward or backward until the separation in the track assembly is below a horizontal line through the center of the sprocket.
Show/hide table
Illustration 4 | g00921038 |
Typical Example |
Show/hide table
Illustration 5 | g00921039 |
Typical Example |
- Install Tool (E) under the track assembly, as shown. Move the machine to the rear and onto Tool (E) until Tool (C) and pin (1) can be removed. Remove Tool (C) and pin (1) .
- Move the track assembly slightly forward in order to allow installation of washers (2) and spacers (3). Apply 5P-0960 Molybdenum Grease in the bores in the track links. Install washers (2) and spacers (3) in the counterbores, as shown. Use Tool (D) to hold the washers and spacers in place.
- Move the machine backward until the spacers and washers are held in place by the track links. Remove Tool (D) .
- Install the pilot pin from Tooling (F) into the track assembly. Make sure that the pilot pin is centered in the track links.
- Move the track assembly forward until the pilot pin is centered between the two track carrier rollers.
Show/hide table
Illustration 6 | g00921041 |
- Use Tooling (F) and reinstall the master pin in order to hold the track assembly together.
- Use two people to reinstall the two track shoes over the master pin. Install the bolts that hold the track shoes in position. Use Tool (G) to tighten the bolts.
- Tighten the tension of the track. Refer to Operation and Maintenance Manual, "Track Adjustment - Adjust" for the correct procedure.
Connection Procedure for the Track on CIPI Undercarriage Arrangements which are Based on 330B Track Type Excavators
Show/hide table
Required Tools     | |||
---|---|---|---|
Tool     | Part Number     | Part Description     | Qty     |
A     | 1P-3545     | Track Chain Coupler     | 1     |
B     | 1P-3533     | Carrier Bar     | 1     |
C     | 1P-7402     | Coupling Tool Group     | 1     |
D     | 5P-6214     | Track Block Assembly     | 1     |
E     | 1U-7631     | Impact Socket     | 1     |
- Install Tooling (A) in the track link and on the sprocket, as shown.
Show/hide table
Illustration 7 | g00490683 |
- Start the machine. Move the sprocket forward until the track assembly is pulled up on the sprocket. Move the sprocket forward until the end of the track assembly is past a vertical line through the center of the sprocket. Remove Tooling (A) .
- Install Tool (B) between the first bushing in the track link and the sprocket, as shown.
Show/hide table
Illustration 8 | g00490689 |
- Move the sprocket forward. Use Tooling (B) to guide the track assembly over the carrier rollers and the front idler.
- Install Tool (C) and pin (1) from Tooling (A) between the track links in the ends of the track assembly, as shown.
Show/hide table
Illustration 9 | g00490692 |
- Move the track assembly forward or backward until the separation in the track assembly is below a horizontal line through the center of the sprocket.
Show/hide table
Illustration 10 | g00490695 |
- Apply 5P-0960 Molybdenum Grease on two track bushings (2). Install the bushings in the track links, as shown. The grease will hold the bushings in place.
- Install Tool (D) under the rear of the track assembly, as shown. Move the track assembly backward until the separation in the track assembly closes and the pin bores in both ends of the track assembly are in alignment with each other. The machine might need to be moved back and forth in order to align the pin bores.
- Apply 5P-0960 Molybdenum Grease in the master pin bores in the track assembly and on the master pin. Install the master pin with a hammer. Install the cotter pin in the master pin. Remove Tool (D) from the rear of the track assembly.
- If the track shoe on each side of the master pin was removed, reinstall the track shoes. Use Tool (E) to reinstall the track shoe mounting bolts.
- Tighten the tension of the track. Refer to Operation and Maintenance Manual, "Track Adjustment - Adjust" for the correct procedure.
Connection Procedure for the Track on CIPI Undercarriage Arrangements which are Based on 330C Track Type Excavators
Show/hide table
Required Tools     | |||
---|---|---|---|
Tool     | Part Number     | Part Description     | Qty     |
A     | 1P-3545     | Coupler for Track Chain     | 1     |
B     | 1P-3533     | Bar     | 1     |
C     | 3S-6224     | Electric Hydraulic Pump (115 Volt) (1)     | 1     |
8T-0820 | Hydraulic Pressure Gauge     | 1     | |
3B-7722 | Pipe Bushing     | 2     | |
1P-2376 | Quick Connect Coupler     | 2     | |
1P-2377 | Dust Plug     | 2     | |
6D-7726 | Hose Assembly     | 2     | |
5P-2379 | Track Press Tool Gp     | 1     | |
8S-7172 | Double Acting Cylinder     |     | |
8S-9903 | Track Press Rollover Gp     |     | |
D     | 5P-6214     | Track Block Assembly     | 1     |
E     | 1U-7630     | Impact Socket     | 1     |
Show/hide table
( 1 ) | 8S-8033 Electric Hydraulic Pump (230 Volt) is available. |
- Install Tooling (A) in the track link and on the sprocket, as shown.
Show/hide table
Illustration 11 | g00490683 |
- Start the machine. Move the sprocket forward until the track assembly is pulled up on the sprocket. Move the sprocket forward until the end of the track assembly is past a vertical line through the center of the sprocket. Remove Tooling (A) .
- Install Tooling (B) between the first bushing in the track link and the sprocket, as shown.
Show/hide table
Illustration 12 | g00490689 |
- Move the sprocket forward. Use Tooling (B) to guide the track assembly over the carrier rollers and the front idler.
- Use a suitable lifting device to raise the front of the track assembly. Install Tooling (D) in position under the track shoe, as shown.
Show/hide table
Illustration 13 | g00625112 |
Typical example |
- Apply 5P-0960 Molybdenum Grease on two track bushings. Install the bushings in the track links. The grease will hold the bushings in place.
- Apply 5P-0960 Molybdenum Grease in the master pin bores in the track assembly and on the master pin.
- Connect the ends of the track assembly. Make sure that the pin bore in each end of the track assembly is aligned with each other.
- Install the 5F-9447 Pilot Pin in the track assembly. Make sure that the pilot pin is centered in the track links.
- Use Tooling (C) to install the master pin in the track assembly.
Show/hide table
Illustration 14 | g00722410 |
- Install the cotter pin in the master pin. Remove Tooling (D) from the rear of the track assembly.
Note: Refer to Special Instruction, "Track - Assembly" for further information regarding Tooling (C) .
- If the track shoe on each side of the master pin was removed, reinstall the track shoes. Use Tooling (E) to reinstall the track shoe mounting bolts.
- Tighten the tension of the track. Refer to Operation and Maintenance Manual, "Track Adjustment - Adjust" for the correct procedure.
Caterpillar Information System:
3612 and 3616 Engines Aftercooler
797 Off-Highway Truck Braking System Pressure Switch (Service Brake)
CIPI UNDERCARRIAGE Arrangements: 1667049, 2372904, 3Q6481, 6Z7988, 6Z7989, 9Q5032, 9Q5040, 9Q5043, 9Q5046, 9Q5047, 9Q5066, 9Q5074, 9Q5097, 9Q5098, 9Q5116, 9Q5134, 9Q5136, 9Q5142, 9Q5147, 9Q5148, 9Q5149, 9Q5172 and 9Q5204 Track - Separate
CIPI UNDERCARRIAGE Arrangements: 9Q5221, 9Q5234, 9Q5243, 9Q5245, 9Q5246, 9Q5247, 9Q5385, 9Q5433, 9Q5482, 9Q5622, 9Q5661, 9Q5719, 9Q5720, 9Q5721, 9Q5722, 9Q5830, 9Q5840, 9Q5857, 9Q5874, 9Q5883, 9Q5930 and 9Q5940 Swivel - Assemble
CIPI UNDERCARRIAGE Arrangements: 1667049, 2372904, 3Q6481, 6Z7988, 6Z7989, 9Q5032, 9Q5040, 9Q5043, 9Q5046, 9Q5047, 9Q5066, 9Q5074, 9Q5097, 9Q5098, 9Q5116, 9Q5134, 9Q5136, 9Q5142, 9Q5147, 9Q5148, 9Q5149, 9Q5172 and 9Q5204 Swivel - Disassemble
3612 and 3616 Engines Aftercooler
3524B Engines for Off-Highway Trucks Self-Diagnostics
CIPI UNDERCARRIAGE Arrangements: 1667049, 2372904, 3Q6481, 6Z7988, 6Z7989, 9Q5032, 9Q5040, 9Q5043, 9Q5046, 9Q5047, 9Q5066, 9Q5074, 9Q5097, 9Q5098, 9Q5116, 9Q5134, 9Q5136, 9Q5142, 9Q5147, 9Q5148, 9Q5149, 9Q5172 and 9Q5204 Swing Gear and Bearing - Install
3412E, C30 and C32 Marine Engines Engine Support (Front) - Remove and Install
3408E and 3412E Engines for Caterpillar Built Machines Water Pump - Remove
3500B Marine Propulsion Engines Safety Messages
3176B Industrial Engine Overspeed
3600 Diesel Marine Monitoring System Signal Listing
3408E and 3412E Engines for Caterpillar Built Machines Engine Oil Filter Base - Remove
3408E and 3412E Engines for Caterpillar Built Machines Engine Oil Filter Base - Install
3408E and 3412E Engines for Caterpillar Built Machines Engine Oil Filter Base - Disassemble
3408E and 3412E Engines for Caterpillar Built Machines Engine Oil Filter Base - Assemble
3412E, C30 and C32 Marine Engines Engine Oil Cooler - Remove
3412E, C30 and C32 Marine Engines Engine Oil Cooler - Install
3500B and 3500 Marine Propulsion Engines with EUI Option Cooling System Coolant (DEAC) - Change
CIPI UNDERCARRIAGE Arrangements: 9Q5221, 9Q5234, 9Q5243, 9Q5245, 9Q5246, 9Q5247, 9Q5385, 9Q5433, 9Q5482, 9Q5622, 9Q5661, 9Q5719, 9Q5720, 9Q5721, 9Q5722, 9Q5830, 9Q5840, 9Q5857, 9Q5874, 9Q5883, 9Q5930 and 9Q5940 Track Carrier Roller - Remove
CIPI UNDERCARRIAGE Arrangements: 1667049, 2372904, 3Q6481, 6Z7988, 6Z7989, 9Q5032, 9Q5040, 9Q5043, 9Q5046, 9Q5047, 9Q5066, 9Q5074, 9Q5097, 9Q5098, 9Q5116, 9Q5134, 9Q5136, 9Q5142, 9Q5147, 9Q5148, 9Q5149, 9Q5172 and 9Q5204 Track Carrier Roller - Install