CIPI UNDERCARRIAGE Arrangements: 1667049, 2372904, 3Q6481, 6Z7988, 6Z7989, 9Q5032, 9Q5040, 9Q5043, 9Q5046, 9Q5047, 9Q5066, 9Q5074, 9Q5097, 9Q5098, 9Q5116, 9Q5134, 9Q5136, 9Q5142, 9Q5147, 9Q5148, 9Q5149, 9Q5172 and 9Q5204 Caterpillar


Final Drive - Disassemble

Usage:

OEMS L5E

Disassembly Procedure for the Final Drive on CIPI Undercarriage Arrangements which are Based on 330 and 330B Track Type Excavators

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
A     1P-2420     Transmission Repair Stand     1    
B     138-7573     Link Bracket     2    
C     1P-1860     Retaining Ring Pliers     1    
D     6B-6682     Full Nut     1    
1P-5546 Crossblock     1    
5P-8248 Hard Washer     4    
5P-8713 Plate     1    
 (1) Threaded Rod     1    
 (2) Spacer     4    
E     138-7574     Link Bracket     2    
F     8B-7561     Step Plate     1    
5F-7465 Puller Assembly     1    
1H-3107 Bearing Puller Assembly     1    
1H-3112 Bearing Puller Assembly     1    
1P-5551 Adjustable Screw Assembly     1    
( 1 ) The 16 NF threaded rod is 280 mm (11 inch) long × 19 mm (0.75 inch) in diameter.
( 2 ) The spacer's outer diameter is 64 mm (2.5 inch). The spacer's inner diameter is 25.4 mm (1.0 inch). The spacer's thickness is 6.4 mm (.25 inch).

Start By:

  1. Remove the final drive. Refer to Disassembly and Assembly, "Final Drive - Remove" in this manual.

  1. Thoroughly clean the outside of the final drive prior to disassembly.

  1. Put an alignment mark across the sections of the final drive for assembly purposes. The parts must be reinstalled in the part's original locations.



    Illustration 1g00511587

  1. Fasten the final drive to Tool (A), as shown. The combined weight of the final drive and final drive sprocket is 531 kg (1170 lb).

  1. Remove 20 bolts (1) and the washers that secure the cover to the final drive.



    Illustration 2g00511600

  1. Use a soft faced hammer and break the seal between cover (2) and the ring gear. Fasten Tool (B) and a hoist to cover (2), as shown. Remove the cover. The weight of the cover is 30 kg (66 lb).



    Illustration 3g00511631

  1. Remove thrust plate (5) from the cover.

  1. Remove 12 socket head bolts (3) and ring gear (4) from the cover.



    Illustration 4g00511636

  1. Remove sun gear (6). Remove carrier assembly (7) by lifting the carrier assembly straight up. The weight of the carrier assembly is approximately 14 kg (30 lb).



    Illustration 5g00511640



    Illustration 6g00572334

    Note: Two spacers (8) are used with carrier assembly (7). One of the spacers fits on the top side of carrier assembly (7). The other spacer (8) is located in the carrier of carrier assembly (15) .

  1. Remove spacer (8) from carrier assembly (7) .

    Note: Planetary gears (11) might have oil grooves "L". Note the position of the oil grooves in relation to the carrier for assembly purposes.

  1. Remove retaining ring (9) with Tool (C). Remove two thrust washers (10) and planetary gear (11) from the carrier. Remove bearing (12) from the planetary gear.

  1. Repeat Step 10 in order to remove the other two planetary gears from the carrier.



    Illustration 7g00511653

  1. Use a screwdriver, and remove retaining ring (13) from the carrier. Remove sun gear (14) from the carrier.



    Illustration 8g00511661

  1. Use two people in order to remove carrier assembly (15). Remove the carrier assembly by pulling the carrier assembly straight up. The weight of the carrier assembly is approximately 25 kg (55 lb).



    Illustration 9g00511682

    Note: Spacer (16) may remain with carrier assembly (15), or the spacer may remain with carrier assembly (24). Refer to Step 19.

  1. Remove spacer (16) from carrier assembly (15) .



    Illustration 10g00511735



    Illustration 11g00572352

    Note: If spring pin (17) is recessed below the outside surface of the carrier, measure the depth of the spring pin and record this measurement for assembly purposes.

  1. Drive spring pin (17) into planetary shaft (18) with a hammer and a punch.

    Note: Planetary gears (20) might have oil grooves "M". Note the position of the oil grooves in relation to the carrier for assembly purposes.

  1. Remove planetary shaft (18), two thrust washers (19) and planetary gear (20) from the carrier. Remove bearing (21) from the planetary gear. Remove spring pin (17) from planetary shaft (18) with a hammer and a punch.

  1. Repeat Steps 15 and 16 in order to remove the other two planetary gears from the carrier.



    Illustration 12g00511788

  1. Use a screwdriver, and remove retaining ring (22). Remove sun gear (23) from the carrier.



    Illustration 13g00511795

    Typical example

  1. If spacer (16) was not removed in Step 14, remove the spacer from carrier assembly (24) at this time.

  1. Slide a piece of steel bar stock between the planetary gears in carrier assembly (24), as shown. Make sure that the bar stock is centered in the carrier assembly. Fasten a lifting sling and a hoist to the steel bar stock, as shown. Slowly lift carrier assembly (24) from the final drive. The weight of the carrier assembly is approximately 36 kg (80 lb).



    Illustration 14g00511799

    Typical example




    Illustration 15g00572382

    Note: If spring pin (25) is recessed below the outside surface of the carrier, measure the depth of the spring pin and record this measurement for assembly purposes.

  1. Drive spring pin (25) into planetary shaft (26) with a hammer and a punch.

    Note: Planetary gears (28) might have oil grooves "N". Note the position of the oil grooves in relation to the carrier for assembly purposes.

  1. Remove planetary shaft (26), two thrust washers (27) and planetary gear (28) from the carrier. Remove two bearings (29) from the planetary gear. Drive spring pin (25) out of planetary shaft (26) with a hammer and a punch.

  1. Repeat Steps 21 and 22 in order to remove the other planetary gears from the carrier.



    Illustration 16g00511809

    Note: It will be necessary to pry ring gear (30) away from main housing (31) in order to install the lifting slings.

  1. Fasten lifting slings and a hoist to ring gear (30), as shown. Remove the ring gear from main housing (31). The weight of the ring gear is 66 kg (145 lb).



    Illustration 17g00511825

  1. Remove O-ring seal (32) from main housing (31) .



    Illustration 18g00511857

    Typical example




    Illustration 19g00511869

  1. Remove socket head bolts (33) from gear (34) .

  1. Use Tooling (D) to remove gear (34) from the housing.



    Illustration 20g00511872

  1. Remove shims (35) from the housing.



    Illustration 21g00511882

  1. Fasten Tool (E) and a hoist to main housing (31), as shown. Separate the main housing and the final drive sprocket from the motor housing. The combined weight of the main housing and final drive sprocket is 191 kg (420 lb).



    Illustration 22g00511906

  1. Remove Duo-Cone seal (36) from the motor housing.



    Illustration 23g00511934



    Illustration 24g00511939

  1. Remove Duo-Cone seal (37) from the main housing.

  1. Use Tooling (F) to remove bearings (38) and (39) from the main housing.

  1. If necessary, remove the final drive sprocket from the main housing. Refer to Disassembly and Assembly, "Final Drive Sprocket - Remove and Install" in this manual for the procedure to remove the final drive sprocket from the main housing.

Disassembly Procedure for the Final Drive on CIPI Undercarriage Arrangements which are Based on 330C Track Type Excavators

Table 2
Required Tools    
Tool     Part Number     Part Description     Qty    
A     1P-2420     Transmission Repair Stand     1    
B     138-7573     Link Bracket     2    
C     1P-1863     Retaining Ring Pliers     1    
D     138-7575     Link Bracket     3    
E     208-6033     Spanner Socket     1    
F     138-7574     Link Bracket     2    
G     5F-7366     Forcing Screw     1    
1P-5546 Crossblock     1    
1U-9889 Crossblock     1    
1P-0520 Driver Group     1    
6V-7888 Puller Leg     2    
1H-3112 Puller Assembly     1    
1P-5551 Adjustable Screw Assembly     1    
H     138-7576     Link Bracket     3    

Start By:

  1. Remove the final drive. Refer to Disassembly and Assembly, "Final Drive - Remove" in this manual.

    Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of the component should be thoroughly cleaned. This will prevent dirt from entering the internal mechanism.

  1. Put an alignment mark across the sections of the final drive for assembly purposes. The parts must be reinstalled in the part's original locations.



    Illustration 25g00892878

  1. Use a hoist and Tooling (H) to position the final drive on Tooling (A). The combined weight of the final drive and final drive sprocket is approximately 550 kg (1200 lb).

  1. Remove bolts (1) .



    Illustration 26g00892883

  1. Use Tooling (B) and a hoist to remove cover (2). The weight of the cover is approximately 32 kg (70 lb).



    Illustration 27g00892888

  1. Remove bolts (3) and gear (4). Check plate (6). Replace the plate if the plate is worn. Remove plug (5) from cover (2) .



    Illustration 28g00892906

  1. Remove O-ring seal (7) from plug (5) .



    Illustration 29g00892930

  1. Remove gear (8) and spacer (9) .



    Illustration 30g00892965

  1. Use Tooling (C) to remove retaining ring (10). Remove washer (11) and gear (12). Remove bearing assembly (13) and washer (14) .

  1. Repeat Step 8 for the additional two gear assemblies.



    Illustration 31g00892968

  1. Remove retaining ring (15) .



    Illustration 32g00892975

  1. Remove carrier assembly (16) .



    Illustration 33g00892977

  1. Remove gear (17) and spacer (18) .



    Illustration 34g00892997

  1. Use Tooling (D), a suitable lifting device, and a hoist to remove planetary carrier (19). The weight of the planetary carrier is approximately 48 kg (105 lb).



    Illustration 35g00893019

  1. Remove retainer ring (21). Lift planetary carrier (19) off sun gear (20) .



    Illustration 36g00896860

  1. Drive spring pin (23) into planetary shaft (22) .



    Illustration 37g00893043

  1. Remove planetary shaft (22) and spring pin (23). Remove the spring pin from the shaft.



    Illustration 38g00896863

  1. Remove washers (24), bearing (25), and planetary gear (26) .

  1. Repeat Steps 15 through 17 in order to remove the other two planetary gears from the carrier.



    Illustration 39g00897431

  1. Remove spacer (27) .

  1. Use a suitable lifting device or two people to remove carrier assembly (28). The weight of the carrier assembly is approximately 38 kg (85 lb).

    Note:




    Illustration 40g00893652

  1. Drive spring pin (30) into shaft (29) .



    Illustration 41g00893658

  1. Remove shaft (29) and spring pin (30). Remove the spring pin from the shaft.



    Illustration 42g00893674

  1. Remove washers (31), bearings (32), and planetary gear (33) .

  1. Repeat Steps 21 through 23 in order to remove the other three planetary gears from the carrier.



    Illustration 43g00893683

  1. Use a suitable lifting device or two people to remove gear (34). The weight of the gear is approximately 41 kg (90 lb).



    Illustration 44g00893694

  1. Remove O-ring seal (35) .



    Illustration 45g00893706

  1. Remove peening operation from stopper plate assembly (36) .

    Note: Removal of the peening operation will allow stopper plate assembly to move without damage to parts.




    Illustration 46g00893837

  1. Install Tooling (E). Remove stopper plate assembly (36) .



    Illustration 47g00893850

  1. Use a hoist and Tooling (F) to remove sprocket housing (38) from housing (37). The weight of the sprocket housing is approximately 385 kg (850 lb).



    Illustration 48g00893858

  1. Remove Duo-Cone seal kit (39) from housing (37) .

  1. Rotate sprocket housing (38) .



    Illustration 49g00893865

  1. Remove Duo-Cone seal kit (40) .



    Illustration 50g00893872

  1. Use Tooling (G) in order to remove bearings (41) and (42) from the housing.

    Note: Sprocket housing (38) must be rotated in order to remove bearing (42) .

  1. If necessary, remove the final drive sprocket from the sprocket housing.

    Reference: Refer to Disassembly and Assembly, "Final Drive Sprocket - Remove and Install" in this manual.

Caterpillar Information System:

3500B and 3500 Marine Propulsion Engines with EUI Option Instrument Panel
G3612 and G3616 Engines Prechamber Ignition Body - Remove
3412C Engine Crankshaft Front Seal - Remove
SR4 HV and SR4B HV Generators Reference Material
SR4 HV and SR4B HV Generators Tools
3408E and 3412E Engines for Caterpillar Built Machines Lifter Group - Remove and Install
3408E and 3412E Engines for Caterpillar Built Machines Rocker Arm and Shaft - Install
3408E and 3412E Engines for Caterpillar Built Machines Rocker Arm and Shaft - Remove
3500 and 3500B High Displacement Engines for Caterpillar Built Machines Fan Drive - Remove
3406E On-Highway Engine Cylinder Liner - Install
3408E and 3412E Engines for Caterpillar Built Machines Rocker Arm - Assemble
3524B Engines for Off-Highway Trucks E190 Engine Overspeed Warning
3606 and 3608 Engines Pressure Transducer
797 Off-Highway Truck Hydraulic System Position Sensor (Truck Body)
3412C Engine Crankshaft Front Seal - Install
3606 and 3608 Engines Pressure Transducer
CIPI UNDERCARRIAGE Arrangements: 1667049, 2372904, 3Q6481, 6Z7988, 6Z7989, 9Q5032, 9Q5040, 9Q5043, 9Q5046, 9Q5047, 9Q5066, 9Q5074, 9Q5097, 9Q5098, 9Q5116, 9Q5134, 9Q5136, 9Q5142, 9Q5147, 9Q5148, 9Q5149, 9Q5172 and 9Q5204 Final Drive - Assemble
3054 and 3056 Industrial and Generator Set Engines Fuel Filter Base - Remove and Install
3054 and 3056 Industrial and Generator Set Engines Fuel Injection Lines - Remove and Install
3500B Marine Propulsion Engines Gauges and Indicators
3054 and 3056 Industrial and Generator Set Engines Fuel Injection Nozzles - Remove
3054 and 3056 Industrial and Generator Set Engines Fuel Injection Nozzles - Install
3054 and 3056 Industrial and Generator Set Engines Fuel Injection Pump - Remove
3054 and 3056 Industrial and Generator Set Engines Fuel Injection Pump - Install
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.