Introduction

This Special Instruction contains information to install the advanced productivity wiring kit on the machines listed above.

Do not perform any procedure in this Special Instruction until you have read the information and you understand the information.

Reference

Reference: Special Instruction, M0072768, "Installation Procedure for the Pro Product Link ® PL641 On Certain 773G, 775G, and 777G Off Highway Trucks."

Reference: Special Instruction, REHS8836, "Procedure For Enhancing the Ethernet Adapter For VIMS on Certain Cat® Products."

Safety

------ WARNING! ------

Do not operate or work on this product unless you have read and understood the instruction and warnings in the relevant Operation and Maintenance Manuals and relevant service literature. Failure to follow the instructions or heed the warnings could result in injury or death. Proper care is your responsibility.


------ WARNING! ------

Failure to follow all safety guidelines prescribed in this document and by governing authorities and regulatory agencies may result in severe injury or death of personnel or machine damage.


------ WARNING! ------

Before servicing/performing maintenance on the machine, electrical power must be physically disconnected; battery plugs must be disconnected from the batteries, or the trailing cable must be unplugged, and warning tags and padlocks shall be applied by a certified electrician. Certified electricians shall perform or direct any electrical work, including any energized testing, repair work in controllers, motors, or other approved compartments, and shall insure that all compartments are properly closed and inspected prior to re-energization. All applicable lock out and tag out procedures must be followed.


Required Parts

Table 1
Required Parts 
Item  Qty  Part Number  Part Name 
362-0169  Electronic Control Module 
8C-8451  Bolt 
8C-5608  Spacer 
9X-6165  Washer 
8C-5607  Isolation Mount 
20  7K-1181  Cable Strap 
550-5047  Wiring Harness 
270-2679  Lockwasher 
203-9007  Nut 
10  455-9568  Cap As 
11  9P-6573  Plug 
12  2g-1133  Grommet 

Removal Procedure

Note: If the machine is already equipped with a PL641 system, then proceed to Step 1 of Section "Removal Procedure".

Note: If the machine is not equipped with a PL641, follow Steps 1 through 9, Steps 19 through 20, and Steps 23 through 30 in the Section of "Installation Procedure" of Special Instruction , M0072768 , "Installation Procedure for the Pro Product Link® PL641 on Certain 773G, 775G, and 777G Off Highway Trucks."



    Illustration 1g06332966
    Rear side of the cab
    (A) Rear access panel

  1. Remove and retain rear access panel (A) from the cab arrangement. Refer to Illustration 1.


    Illustration 2g06333568
    (B) Operator Seat
    (C) Plastic Panel

  2. Slide operator seat (B) forwards then remove and retain the plastic panels (C) above the ECM which is above the fuse panel.


    Illustration 3g06332449
    (D) 493-2549 Wiring Harness

  3. Remove wiring harness (D) from the machine (if equipped with existing PL641 system).

    Note: PL641 wiring harness (D) connects at the service port location near the fuse panel in the cab.

    Note: Wiring harness (D) routes out through the cab rear bulk head in the right rear corner and connects to the VIMS main ECM and associated connectors. This would only be present if the machine is already equipped with a PL641 system



    Illustration 4g06332635
    (E) ECM mounting panel.

  4. Remove and retain ECM mounting panel (E) from its base and rotate to gain access to the bottom. Refer to Illustration 4.

Installation Procedure



    Illustration 5g06331222
    (1) 362-0169 Electronic Control Module


    Illustration 6g06334250
    (1) 362-0169 Electronic Control Module
    (2) 8T-0275 Bolt
    (3) 8C-5608 Spacer
    (4) 9X-6165 Washer
    (5) 8C-5607 Isolation Mount
    (6) 7K-1181 Cable Strap
    (7) 550-5047 Wiring Harness

  1. Install Electronic Control Module (1) on the bottom of ECM mounting plate near the Right-hand side of the cab. Refer Illustration 5.

    Secure ECM mounting by using Isolation mount (5), Washer (4), Spacer (3) and Bolt (2). Refer to Illustration 6.



    Illustration 7g06332095
    (7) 550-5047 Wiring Harness

  2. Locate wiring harness (7) and connect to 40-pin connector which is labelled as 'Ethernet switch' to the Ethernet Switch in Electronic Control Module (1). Reinstall the ECM mounting panel (E) that was removed in Step 1 of Section "Removal Procedure".

    Note: Route harness (7) from Ethernet switch module towards the front panel through the same routing as the former harness.

    Note: Use Cable Strap (6) for harness material as needed. Refer to Illustration 6.



    Illustration 8g06334579
    (8) 270-2679 Lockwasher
    (9) 203-9007 Nut
    (10) 455-9568 Cap As
    (11) 9P-6573 Plug

  3. Route the "Service port cab" connector from wiring harness (7) through the hole near the fuse panel where 9-pin "MC-C95" was disconnected, and then secure the "service port cab" connection by using lock washer (8), nut (9), cap assembly (10), and plug (11).


    Illustration 9g06331638
    (F) Service Connector

  4. Attach the removed 9-pin MC-C95 to the mating service connector (F) MC-C80 on the wiring harness (7). Refer to Illustration 9.


    Illustration 10g06332642
    (G) 50.8 mm (2.00 inch) Hole
    (H) Cab harness
    (7) 550-5047 Wiring Harness

  5. Route wiring harness (7) along with existing cab harness (H) into hole (G). Refer to Illustration 10.

    Note: Use Cable Strap (6) as needed. Refer to Illustration 6.

  6. Route the 5 connectors as follows, through the hole and into the right side area of the cab.

    • PL641Radio

    • Ethernet Adapter MC-C97

    • Term Resistor MC-C78 - (1 Male and 1 Female 3-pin connectors)

    • PL641 Satellite Radio MC-C21

    Note: Use Cable Strap (6) as needed. Refer to Illustration 6.



    Illustration 11g06331741
    (12) 2G-1133 Grommet

  7. Insert grommet (12) into hole (G). Refer to Illustration 11.


    Illustration 12g06332213
    (I) (12-pin) PL641 Radio Connector
    (7) 550-5047 Wiring Harness

  8. Secure Radio connector (I) from wiring harness (7) to communication radio group PL641.


    Illustration 13g06331812


    Illustration 14g06331860

  9. Remove and save the terminating resistor MC-C53 from the existing machine cab harness (or from the original PL641 harness) and connect the (female 3 pin) Term Resistor MC-C78 connector from new wiring harness (7) to the existing connector on the cab harness. Refer to Illustration 13 and Illustration 14.


    Illustration 15g06331875

  10. Connect terminating resistor MC-C53 that is saved in Step 9 of Section "Installation Procedure" with the (male 3 pin) Term Resistor MC-C78 Connector from wiring harness (7). Refer to Illustration 15.


    Illustration 16g06331888

  11. Secure the connector labeled PL641 Satellite Radio MC-C21 (12 pin) from wiring harness (7) with MC-C21 PL321 (12pin) satellite connector of the existing cab harness. Refer to Illustration 16.


    Illustration 17g06332066

  12. Secure the connector labelled 'Ethernet Adapter MC-C97' (8 pin) to the connector located on harness (7) below the VIMS Main ECM labelled 'VIMS Adapter or Jumper'.

    Note: If the machine has this 8-pin VIMS Adapter or Jumper harness present it will have a cap attached. Remove the cap from the connector and discard. If the connector is not present, refer to Special Instruction, REHS8836, "Procedure For Enhancing the Ethernet Adapter For VIMS on Certain Cat® Products" to install adapter harness.

  13. Once the installation is finished, then follow Steps 30 through Steps 44 in the Section of "Installation Procedure" of Special Instruction, M0072768, "Installation Procedure for the Pro Product Link® on Certain 773G, 775G, and 77G Off- Highway Trucks" to complete the installation and flashing of the PL641 radio.

Caterpillar Information System:

S3015, S3025 and S3035 Demolition and Scrap Shears Work Tool Troubleshooting
S3015, S3025 and S3035 Demolition and Scrap Shears Visual Inspection
826K Landfill Compactor Brake Discs - Check
Procedure to Rework the Cabin Floor Plate Cracks on Certain 424B Backhoe Loaders {0679, 7301} Procedure to Rework the Cabin Floor Plate Cracks on Certain 424B Backhoe Loaders {0679, 7301}
Procedure to Rework the Cabin Floor Plate Cracks Is Now Used on Certain 424B Backhoe Loaders {7301, 7325} Procedure to Rework the Cabin Floor Plate Cracks Is Now Used on Certain 424B Backhoe Loaders {7301, 7325}
C4.4 Engines for Caterpillar Built Machines Diesel Exhaust Fluid Quality - Test
Improved Stick is Now Used on Certain 424B and 424B HD Backhoe Loaders {6502} Improved Stick is Now Used on Certain 424B and 424B HD Backhoe Loaders {6502}
Improved Lighting Harness Assembly to Improve Worklight Switch life Is Now available for Certain Telehandlers {1434} Improved Lighting Harness Assembly to Improve Worklight Switch life Is Now available for Certain Telehandlers {1434}
24 Motor Grader Machine Systems Brake Accumulator - Remove and Install
New Software Is Now Available For Certain Telehandlers {7610, 7620} New Software Is Now Available For Certain Telehandlers {7610, 7620}
3516E Engine for Tier 4 Final 994K Wheel Loaders Diesel Exhaust Fluid Tank - Flush
980M and 982M Wheel Loaders Engine Oil and Filter - Change
794 AC Off-Highway Truck Systems Brake Valve (Parking)
S3015, S3025 and S3035 Demolition and Scrap Shears Hydraulic System Air - Purge
Diesel Exhaust Fluid (DEF) Pump Filter Maintenance Interval On Certain C4.4 Engines {1000, 108J, 7000} Diesel Exhaust Fluid (DEF) Pump Filter Maintenance Interval On Certain C4.4 Engines {1000, 108J, 7000}
S3015, S3025 and S3035 Demolition and Scrap Shears Hydraulic Rotator Cycle Time - Check
S3015, S3025 and S3035 Demolition and Scrap Shears Speed Control Valve (Hydraulic Cylinder) - Test and Adjust
S3015, S3025 and S3035 Demolition and Scrap Shears Hydraulic Cylinder Leakage - Test
S3015, S3025 and S3035 Demolition and Scrap Shears Control Valve Pressure (Hydraulic Rotator) - Test
Base Edge Center on Fusion Buckets May Bow on Certain Medium Wheel Loaders {6001, 6101, 6801} Base Edge Center on Fusion Buckets May Bow on Certain Medium Wheel Loaders {6001, 6101, 6801}
A New Hose Assembly is Now Used in the Automatic Lubrication Group on Certain 777E Off-Highway Trucks {7510, 7540} A New Hose Assembly is Now Used in the Automatic Lubrication Group on Certain 777E Off-Highway Trucks {7510, 7540}
24 Motor Graders Engine Supplement Turbocharger - Remove and Install - Left Side
24 Motor Graders Engine Supplement Turbocharger - Remove and Install - Right Side
The Hydraulic Oil Lines Group is Improved on Certain 797 Off-Highway Trucks {3101} The Hydraulic Oil Lines Group is Improved on Certain 797 Off-Highway Trucks {3101}
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.