- Load Haul Dump
- R1700G (S/N: SBR1-UP; XBR1-391; 8XZ1-UP)
Introduction
This Special Instruction covers the procedure to rework the final drive planet carrier on the above serial numbered Load Haul Dump Machines. This supplemental product support literature should be used with the appropriate Service Manual and the appropriate Parts Manual that is available for this standard machine.
Read the entire Special Instruction. Understand the information before you perform any procedures. Understand the information before you order any parts.
Safety Section
Work safely. Most accidents that involve product operation, maintenance, and repair are caused by failure to observe basic safety rules or precautions. An accident can often be avoided by recognizing potentially hazardous situations before an accident occurs. A person must be alert to potential hazards. This person should also have the necessary training, skills, and tools to perform these functions properly.
Safety precautions and warnings are provided in this instruction and on the product. If these hazard warnings are not heeded, bodily injury or death could occur to you or to other persons. Caterpillar cannot anticipate every possible circumstance that might involve a potential hazard. Therefore, the warnings in this publication and the warnings that are on the product are not all inclusive.
Ensure that all personnel are safe when using a tool, procedure, work method, or operating technique not recommended by Caterpillar. Ensure that the product will not be damaged or the product made unsafe by the operation, lubrication, maintenance, or the repair procedures that are used.
Hot oil and hot components can cause personal injury. Do not allow hot oil or hot components to contact the skin. |
Personal injury or death can result from machine articulation or movement. Machine frames can move and a person can be crushed. Connect the steering frame lock link between the front and rear frames before working on machine. |
NOTICE |
---|
Keep all parts clean from contaminants. Contaminants may cause rapid wear and shortened component life. |
NOTICE |
---|
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting, and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Refer to Special Publication, NENG2500, "Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Cat® products. Dispose of all fluids according to local regulations and mandates. |
Reference Section
Reference: Disassembly and Assembly, UENR4845, "R1700G Load Haul Dump Machine Systems".
Reference: Disassembly and Assembly, UENR4838, "R1700G Load Haul Dump Power Train".
Reference: Disassembly and Assembly, KENR6271, "R1700G Load Haul Dump Machine Systems".
Reference: Disassembly and Assembly, KENR6257, "R1700G Load Haul Dump Power Train".
Reference: Disassembly and Assembly, RENR4675, "R1700G Load Haul Dump Machine Systems".
Reference: Disassembly and Assembly, RENR4661, "R1700G Load Haul Dump Power Train".
Required Parts
Parts Required | ||
---|---|---|
Qty | Part Number | Part Description |
3 | Shaft | |
3 | Dowel |
Machine Preparation
Note: Cleanliness is an important factor. Before the removal procedure, clean the exterior of the component thoroughly. Cleaning the exterior will help to prevent dirt from entering the internal mechanism.
- Move the machine to a hard level surface away from operating machines and away from personnel.
- Engage the parking brake. Place wheel blocks in front of the wheels and behind the wheels.
- Stop the engine.
- Connect the steering frame lock. Refer to Disassembly and Assembly, "Steering Frame Lock - Connect and Disconnect".
- Turn the key start switch and the battery disconnect switch to the OFF position. If there is no battery disconnect switch, remove the negative battery cable at the battery.
- Release system pressure. Refer to Disassembly and Assembly, "System Pressure - Release".
Procedure
- Remove the final drive, brake, and wheel. Refer to Disassembly and Assembly, "Final Drive, Brake, and Wheel - Remove".
- Disassemble the final drive planetary carrier. Refer to Disassembly and Assembly, "Final Drive Planetary Carrier - Disassemble".
Show/hide table
Illustration 1 g06152604 (1) Planetary carrier
(2) Shaft
(3) Dowel - Discard three shafts (2) and three dowels (3) from planetary carrier (1).
Show/hide table
Illustration 2 g06174360 View of the planetary carrier
(1) Planetary carrier
(4) Radius5 ± 0.5 mm (0.20 ± 0.02 inch)
(5) Radius3 ± 0.2 mm (0.12 ± 0.008 inch)
(C)47 ± 0.5 mm (1.85 ± 0.02 inch)
(D)18 ± 0.2 mm (0.71 ± 0.008 inch)
(E)12.7 ± 0.1 mm (0.50 ± 0.004 inch) - Rework the three dowel recesses on planetary carrier (1).
Show/hide table
Illustration 3 g06174361 (1) Planetary carrier
(6)9Y-2596 Dowel
(7)468-8213 Shaft - Assemble planetary carrier (1) using three 9Y-2596 Dowels (6) and three 468-8213 Shafts (7). Refer to Illustration 3 and Disassembly and Assembly, "Final Drive Planetary Carrier - Assemble".
- Install the final drive, brake, and wheel. Refer to Disassembly and Assembly, "Final Drive, Brake, and Wheel - Install".