There is a new sequence for adjusting the fuel injectors. The 3508C Engine will not operate correctly if injectors are adjusted using the fuel injector adjustment sequence for the earlier 3508 and 3508B Engines.

Use the new fuel injector adjustment sequence for 3508C Engines on all 3508 and 3508B Engines. Testing has proven that using the new injector adjustment sequence on all 3508 Engines will not affect engine performance or emissions. The tables for the fuel injector adjustment sequence in the "Testing and Adjusting" manuals will be updated to reflect this change.

Current Fuel Injector Adjustment Sequence

Table 1
Counterclockwise rotation (Standard) from the flywheel end of the engine    
Cylinders to Check/Adjust    
Engine     Correct Stroke For No. 1 Piston At Top Center Position (1)     Inlet Valves     Exhaust Valves     Injectors    
3508     Compression     1-2-6-8     1-2-3-7     3-4-5-7    
Exhaust 3-4-5-7     4-5-6-8     1-2-6-8    
( 1 ) Put the No. 1 Piston at the top center (TC) position and identify the correct stroke. Refer to Testing and Adjusting, "Finding the Top Center Position for the No 1 Piston". Find the top center position for a particular stroke and make the adjustment for the correct cylinders. Remove the timing bolt. Turn the flywheel by 360 degrees in the direction of normal engine rotation. This will put the No. 1 piston at the top center (TC) position on the other stroke. Install the timing bolt in the flywheel and complete the adjustments for the cylinders that remain.

Table 2
Clockwise rotation (Reverse) from the flywheel end of the engine    
Cylinders To Check/Adjust    
Engine     Correct Stroke For No. 1 Piston At Top Center Position (1)     Inlet Valves     Exhaust Valves     Injectors    
3508     Compression     1-3-4-8     1-2-7-8     2-5-6-7    
Exhaust 2-5-6-7     3-4-5-6     1-3-4-8    
( 1 ) Put the No. 1 Piston at the top center (TC) position and identify the correct stroke. Refer to Testing and Adjusting, "Finding the Top Center Position for the No 1 Piston". Find the top center position for a particular stroke and make the adjustment for the correct cylinders. Remove the timing bolt. Turn the flywheel by 360 degrees in the direction of normal engine rotation. This will put the No. 1 piston at the top center (TC) position on the other stroke. Install the timing bolt in the flywheel and complete the adjustments for the cylinders that remain.

New Fuel Injector Adjustment Sequence

Table 3
Counterclockwise rotation (Standard) from the flywheel end of the engine    
Cylinders to Check/Adjust    
Engine     Correct Stroke For No. 1 Piston At Top Center Position (1)     Inlet Valves     Exhaust Valves     Injectors    
3508     Compression     1-2-6-8     1-2-3-7     2-3-4-7    
Exhaust 3-4-5-7     4-5-6-8     1-5-6-8    
( 1 ) Put the No. 1 Piston at the top center (TC) position and identify the correct stroke. Refer to Testing and Adjusting, "Finding the Top Center Position for the No 1 Piston". Find the top center position for a particular stroke and make the adjustment for the correct cylinders. Remove the timing bolt. Turn the flywheel by 360 degrees in the direction of normal engine rotation. This will put the No. 1 piston at the top center (TC) position on the other stroke. Install the timing bolt in the flywheel and complete the adjustments for the cylinders that remain.

Table 4
Clockwise rotation (Reverse) from the flywheel end of the engine    
Cylinders To Check/Adjust    
Engine     Correct Stroke For No. 1 Piston At Top Center Position (1)     Inlet Valves     Exhaust Valves     Injectors    
3508     Compression     1-3-4-8     1-2-7-8     2-6-7-8    
Exhaust 2-5-6-7     3-4-5-6     1-3-4-5    
( 1 ) Put the No. 1 Piston at the top center (TC) position and identify the correct stroke. Refer to Testing and Adjusting, "Finding the Top Center Position for the No 1 Piston". Find the top center position for a particular stroke and make the adjustment for the correct cylinders. Remove the timing bolt. Turn the flywheel by 360 degrees in the direction of normal engine rotation. This will put the No. 1 piston at the top center (TC) position on the other stroke. Install the timing bolt in the flywheel and complete the adjustments for the cylinders that remain.

Caterpillar Information System:

CB34, CB34XW and CC34 Utility Compactors Engine Crankcase Breather - Replace
R1300G Series II Load Haul Dump Machine Electrical System Engine Shutdown
2006/02/06 An Improved Drawbar Group Uses Larger Bolts and New Guides {6153}
414E, 416E, 420E, 422E, 428E, 430E, 432E, 434E, 442E and 444E Backhoe Loaders Machine Systems MID 053 - CID 1603 - FMI 12
414E, 416E, 420E, 422E, 428E, 430E, 432E, 434E, 442E and 444E Backhoe Loaders Machine Systems MID 053 - CID 1603 - FMI 09
414E, 416E, 420E, 422E, 428E, 430E, 432E, 434E, 442E and 444E Backhoe Loaders Machine Systems MID 053 - CID 1603 - FMI 02
416E Backhoe Loader Hydraulic and Steering System Control Valve (Lift)
PM-201 Cold Planer Machine Systems Relief Valve (Rotor Clutch Engage) - Test and Adjust
C11 and C13 Engines Turbocharger
CB22, CB24, CB32 and CC24 Utility Compactors Neutral Start Switch - Test
RM-500 Soil Stabilizer Mirror
587R Pipelayer Window Washer Reservoir - Fill
CB-334E and CB-335E Series II Paving Compactors Lifting and Tying Down the Machine - CB-334E
CB-334E and CB-335E Series II Paving Compactors Lifting and Tying Down the Machine - CB-335E
420E, 430E, 432E, 434E, 442E and 444E Backhoe Loaders Hydraulic and Steering System Pilot System Pressure - Test
2006/01/02 New Sequence for Adjusting the Fuel Injectors {1290, 1290}
PM-201 Cold Planer Machine Systems Relief Valve Pressure (Clutch) - Test and Adjust
R1300G Series II Load Haul Dump Machine Electrical System Engine Monitoring
Miswiring Issues with Installation of the Product Link 121 and Product Link 321{7606} Miswiring Issues with Installation of the Product Link 121 and Product Link 321{7606}
Service Parts are Delayed for PR172, PR184, and PR190 Landscape Power Rake{6055, 7000} Service Parts are Delayed for PR172, PR184, and PR190 Landscape Power Rake{6055, 7000}
R1300G Series II Load Haul Dump Machine Electrical System Actual Gear Indicator
R1300G Series II Load Haul Dump Machine Electrical System Torque Converter Oil Temperature
R1300G Series II Load Haul Dump Steering Control
R1300G Series II Load Haul Dump Machine Electrical System Hydraulic Oil Temperature
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.