NOTICE |
---|
Improper lifting or tiedowns can allow load to shift and can cause injury and damage. |
Illustration 1 | g01062617 |
For the basic specifications of the machine, refer to the Operation and Maintenance Manual, "Specifications".
Lifting Point - In order to lift the machine, attach the lifting devices to the four lifting points. |
Tie Down Point - In order to tie down the machine, attach the tie-downs to the tie down points. |
Use properly rated cables and properly rated slings in order to lift the machine.
Position the crane or the lifting device in order to lift the machine in a level position.
Install the pins in the rear housings.
Illustration 2 | g00799286 |
The width of the spreader bar must be sufficient to prevent the lifting cables or the lifting straps from contacting the machine.
Note: Raise the suspension of the machine to the maximum height when you load the machine with a lifting device or when you unload the machine with a lifting device. When the machine is in place, the suspension must be lowered completely before the machine is secured with tie-downs.
- Place cables in the four lifting eyes that are provided. These lifting eyes are identified on the machine by a symbol of a hook.
- Block the front of the front tires and block the rear of the rear tires. Also, block the outside of the tires.
- Place cables in the four tie down points that are provided.
- Refer to the Operation and Maintenance Manual, "Shipping the Machine" for more information.
Note: Remove the pins from the rear housing before you put the machine back into service.