Eccentric Weight Housing Oil - Change
Change the Oil
- Take an oil sample from the eccentric weight housing. No flushing is necessary, if the oil sample rating is equal or lower than ISO 18/15. The flushing procedure should be performed if an oil sample rating is higher than ISO 18/15.
- Rotate the drum until the welded item is at the bottom of the drum. The fill/drain plug is at the top of the housing.
Show/hide table
Illustration 1 | g00679425 |
- Place a suitable container under the drain plug. Remove the drain plug. Drain the housing completely.
- Clean the plug. Install the plug.
- Rotate the drum until the welded item is at the bottom of the drum.
- Remove the filler plug.
Show/hide table
Illustration 2 | g00679425 |
- Remove the level check plug. Fill the housing with oil. Refer to the Operation and Maintenance Manual, "Lubrication Viscosities" and Operation and Maintenance Manual, "Refill Capacities". Maintain the level of the oil to the bottom of the level check opening.
Show/hide table
Illustration 3 | g00661118 |
- Clean the plugs. Install the plugs.
Flush the Housing
- Perform the following procedure for the housing.
Show/hide table
Illustration 4 | g00675839 |
- Drain the oil from the eccentric weight housing.
- Pump 151 L (40 US gal) of a suitable hydraulic oil into a 208 L (55 US gal) drum.
Show/hide table
Illustration 5 | g00411939 |
- Use the 127-8781 Transfer Cart Group in order to flush the oil in the 208 L (55 US gal) drum. Filter the oil for 30 minutes. The particle count of the clean oil must be a maximum of ISO 18/13.
Show/hide table
Illustration 6 | g00684344 |
(1) 8C-6875 Connector (2) 8B-5774 Reducer Bushing (3) 9U-6989 Head (4) 9U-6983 Filter Element (5) 6V-3965 Nipple Assembly (6) 8T-4834 Swivel Orifice Tee (7) 127-8781 Filter Cart (8) 2.4 m (8 ft) of 25 mm (1 inch) hose (9) 3B-6498 Elbow (10) 3L-7024 Street Elbow (11) 127-0593 Connector (12) 3B-7728 Elbow (13) 3B-7265 Pipe Nipple (14) 940 mm (37 inch) of 25 mm (1 inch) pipe |
- Raise the machine. The drum and tires must not be in contact with the ground or the floor. Support the machine on stands.
Show/hide table
Illustration 7 | g00411939 |
- Start the engine. Release the parking brake and rotate the drum until the fill/drain plug is at the top of the housing. Remove the plug. Install the valve and fitting assembly that is appropriate for your machine.
Show/hide table
Illustration 8 | g00412139 |
- Assemble the 126-7187 Adapter (17) into the male end of the 5R-3796 Quick Coupling Assembly (16). Install the adapter into the hole for the oil fill/drain plug. Assemble the 8T-0198 Seal Connector (15) onto the female end of the quick coupler. Attach the female end of the quick coupler to the transfer cart suction hose in order to drain the flushing oil from the housing.
Show/hide table
Illustration 9 | g00698763 |
- Rotate the drum until the fill/drain plug is at the bottom. Put a mark on the surface of the drum at the top of the drum. The mark will help identify the position of the fill/drain plug.
Show/hide table
Illustration 10 | g00661111 |
- Remove the level check plug. Connect the quick coupler (16). Fill the housing with 22 L (6 US gal) gallons of clean oil. Install the plug.
Show/hide table
Illustration 11 | g00412139 |
- Run the first flush cycle.
- Start the engine. Release the brake.
- Set the travel speed control to low speed. In order to rotate the drum, move the propel control.
- Set the vibratory amplitude control to the low position.
- Turn on the vibratory system. Run the vibratory system for 5 seconds. Turn off the vibratory system. Repeat the cycle for three minutes.
Note: For each cycle, do not run the vibratory system more than 5 seconds.
- Stop the drum. Position the drum in order to drain the housing.
Show/hide table
Illustration 12 | g00670156 |
- Install the transfer cart. Pump the oil out of the housings. Cycle the oil through the filter for 30 minutes. Cycle the oil until the oil is cleaned to a rating of ISO 18/13 or better.
- Install the transfer cart to the housing. Pump the oil into the housing. For the second cycle, repeat steps 6 through 9. After the second cycle, take an oil sample before filtering the oil. No further flushing is necessary, if the oil sample rating is equal or lower than ISO 19/16. Another flushing is necessary, if the oil sample rating is higher than ISO 19/16.
- When the flushing is complete, rotate the drum to the position in order to drain the housing. Remove the valve and fitting assembly. Drain as much of the oil as possible.
- Rotate the drum until the fill/drain plug is at the top. Remove the level check plug. Fill the drum to the correct level. Refer to the Operation and Maintenance Manual, "Refill Capacities". Refer to the Special Publication, SEBU6250, "Lubricate Specifications".
Note: The new oil must have a oil sample rating that is equal or lower than ISO 18/15.
Caterpillar Information System:
2000/03/20 Parts Kits Improve Comfort and Productivity {1353, 3030, 4304, 4334, 5004, 5051, 5057, 5059, 5063, 5133, 7320}
2000/05/22 A New Housing for the Thermostat Is Now Available {1361}
2000/04/17 Vertical Wheel Bearing Adjustment Procedures For Cast Wheels And Fabricated Wheels {4001, 4201}
2000/06/05 Improvements To CAT ID {1920}
Field Installation of the 169-0005 Auxiliary Lines Kits on the C-2 Series of the 426C and 436C Backhoe Loaders{5057} Field Installation of the 169-0005 Auxiliary Lines Kits on the C-2 Series of the 426C and 436C Backhoe Loaders{5057}
2000/02/28 New Plates Improve Durability of the Coupler {6129}
12H, 140H and 160H Motor Graders Machine Systems Solenoid Valve (Centershift Lock) - Install
784C, 785C and 785C HAA Off-Highway Truck/Tractors Hydraulic System Bypass Switch (Hoist Screen)
980G Wheel Loader, 824G Wheel Dozer, 825G Soil Compactor and 826G Landfill Compactor Implement Electronic Control System MID 082 - CID 0354 - FMI 06
776D Wheeled Tractor and 777D and 777D HAA Off-Highway Trucks Power Train Gear Pump (Transmission Charging and Scavenge) - Assemble
CB-534C and CB-634C Vibratory Compactors Steering System Hydraulic Oil Contamination - Test
TH62, TH63, TH82 and TH83 Telehandlers Hydraulic System Machine Preparation for Troubleshooting
836G Landfill Compactor and 834G Wheel Dozer Power Train Torque Converter (Lockup) - Assemble
3408E and 3412E Engines for Caterpillar Built Machines Vibration Damper and Pulley
2000/02/14 A New Guard is Used to Help Keep the Radiator Clean {7155}
Caterpillar<COMP-BREAK TAGNAME=cp850>©<COMP-RESUME> AP-900B and Barber-Greene<COMP-BREAK TAGNAME=cp850>©<COMP-RESUME> BG-240C Asphalt Pavers Vibratory System General Information
Caterpillar<COMP-BREAK TAGNAME=cp850>©<COMP-RESUME> AP-900B and Barber-Greene<COMP-BREAK TAGNAME=cp850>©<COMP-RESUME> BG-240C Asphalt Pavers Vibratory System Vibratory Hydraulic System
Caterpillar<COMP-BREAK TAGNAME=cp850>©<COMP-RESUME> AP-900B and Barber-Greene<COMP-BREAK TAGNAME=cp850>©<COMP-RESUME> BG-240C Asphalt Pavers Vibratory System Gear Pump (Vibratory)
Charge Pressure Relief Settings that are Required with New 174-7572 Drive Axle {3278, 5117, 5117} Charge Pressure Relief Settings that are Required with New 174-7572 Drive Axle {3278, 5117, 5117}
Caterpillar<COMP-BREAK TAGNAME=cp850>©<COMP-RESUME> AP-900B and Barber-Greene<COMP-BREAK TAGNAME=cp850>©<COMP-RESUME> BG-240C Asphalt Pavers Vibratory System Relief Valve (Vibratory Pump) - Test
Caterpillar<COMP-BREAK TAGNAME=cp850>©<COMP-RESUME> AP-900B and Barber-Greene<COMP-BREAK TAGNAME=cp850>©<COMP-RESUME> BG-240C Asphalt Pavers Vibratory System Vibratory Shaft Speed - Test and Adjust
725C2 Articulated Truck Secondary Steering
Charge Pressure Relief Setting that is Required with New 174-7573 Pump Group {5058, 5070, 5117, 5117} Charge Pressure Relief Setting that is Required with New 174-7573 Pump Group {5058, 5070, 5117, 5117}
CB-535B Vibratory Compactor Steering System Articulating and Oscillating Hitch - Test and Adjust