Assembly Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
(A)  1P-0510  Driver Group 

    Note: The following procedure is for the assembly of a swing motor that has a swing parking brake attachment.

  1. Make sure that all of the parts of the swing motor are clean and free of dirt and debris prior to assembly. Check the condition of all the parts in the swing motor.

    Note: Refer to Guideline For Reusable Parts, SEBF8032, "Piston Pumps and Motors" as a guideline for reconditioning and determining the reusability of some parts.

  2. Check the condition of all the O-ring seals and the backup rings that are used in the swing motor and the relief valves. If any of the O-ring seals are damaged, use new parts for replacement.

  3. Use the following procedure to assemble the relief valves.


      Illustration 1g00515704

    1. Install valve (57) in the body, as shown.


      Illustration 2g00515702

    2. Install retainer (56) on the body, as shown.


      Illustration 3g00515700

    3. Install spring (54) in body (55).


      Illustration 4g00515699

    4. Install backup ring (52) and O-ring seal (53) on body (47). Make sure that the O-ring seal and the backup ring are in the correct positions, as shown.

    5. Install insert (51) and insert (50) in body (47), as shown.


      Illustration 5g00515696

    6. Install ball (49) in the larger hole of the two holes in body (47).


      Illustration 6g00515686

    7. Install retainer (48) on the body assembly, as shown.


      Illustration 7g00515683

    8. Install body (47).


      Illustration 8g00515681

    9. Install locknut (46) in body (47). Locknut (46) must be tightened to a torque of 160 ± 30 N·m (120 ± 22 lb ft) after adjustment of the valve is made.


      Illustration 9g00515680

    10. Install seat (45), as shown.


      Illustration 10g00515676

    11. Install spring (44).


      Illustration 11g00517668

    12. Install O-ring seal (42) and backup ring (43) on plug (41), as shown.


      Illustration 12g00517666

    13. Install plug (41) in relief valve (1). Plug (41) must be tightened to a torque of 120 ± 10 N·m (90 ± 7 lb ft).

    Note: Refer to Testing and Adjusting, SENR8961 for the correct procedure to adjust the pressure settings of each relief valve (1).



    Illustration 13g00515633

  4. Install one of the retaining rings (40) on the drive shaft.

  5. Press the drive shaft into bearing (38) until the drive shaft contacts the retaining ring. Install the other retaining ring (40) on the other side of the bearing.

  6. Install bearing race (39) and retaining ring (37) on the end of the drive shaft.


    Illustration 14g00515627


    Illustration 15g00515601

  7. Install oil seal (36) in front cover (33) with Tool (A). Install the seal so the lip will be facing away from the outside of the front cover, and until the seal contacts the counterbore in the front cover.


    Illustration 16g00518071

  8. Install shaft assembly (32) in the body. Make sure that bearing (38) is seated in the counterbore in the body.

  9. Lubricate the lip of oil seal (36) with clean hydraulic oil. Install front cover (33) over shaft assembly (32) and into the body with a soft faced hammer.


    Illustration 17g00515596

  10. Install retaining ring (31) that holds the shaft assembly in place. Install ring (35) on shaft assembly (32).


    Illustration 18g00515595

  11. Apply a thin coat of 5P-0960 Molybdenum Grease on the back side of plate (34). Install plate (34) in the body.

  12. Install O-ring seals (29) and (30) in the body, as shown.

  13. Use the following procedure to assemble the barrel assembly.


      Illustration 19g00517704

    1. Install spacer (28), spring (27) and spacer (26) in barrel (22). Place the barrel in a press. Install a suitable size drive plate on spacer (26), and compress spring (27) until retaining ring (25) can be installed. Install retaining ring (25).


      Illustration 20g00515587

    2. Install 12 pins (24) in barrel (22).


      Illustration 21g00515539

    3. Install the spacer in bushing (23). Install bushing (23) on pins (24).


      Illustration 22g00515535

    4. Apply clean hydraulic oil on nine piston assemblies (20). Install the piston assemblies in the piston assembly's original bores in plate (21). Install the plate with the piston assemblies in the original bores in barrel (22).


    Illustration 23g00515533

    Note: Do not allow the barrel assembly to fall apart when the barrel assembly is installed in the body of the swing motor.

  14. Place the swing motor on the swing motor's side. Install barrel assembly (18) in body (19).


    Illustration 24g00515522

    Note: Make sure that the four tooth cut locations of each friction plate are in alignment. Also, the four tooth cut locations of each separator plate must be in alignment in the body of the swing motor.

  15. Apply clean hydraulic oil on four separator plates and three friction plates (17). Install plates (17) in alternating order in body (19). Begin with a separator plate, and end with a separator plate.


    Illustration 25g00515494

  16. Install piston (16) in the body of the swing motor in the piston's original position. Threaded holes (X) can be used as a guide during installation. If the piston is difficult to install because of O-ring seal resistance, a soft faced hammer can be used as an aid in installation.


    Illustration 26g00516977

  17. Install 18 springs (14) in the piston.


    Illustration 27g00517524

  18. Install two pins (13) and bearing (12) in head (10).

  19. Install O-ring seal (11) on head (10).


    Illustration 28g00516981

  20. Apply a thin coat of 5P-0960 Molybdenum Grease on the face of plate (15) that contacts the head. The grease will hold the plate to the head. Install the plate on the head in the plate's original position, as shown.


    Illustration 29g00515433

  21. Place head (10) in the head's original position on the body. Install four socket head bolts (9) that secure the head. Tighten the socket head bolts to a torque of 430 ± 43 N·m (315 ± 32 lb ft).


    Illustration 30g00515430


    Illustration 31g00515406

    Note: Be sure to install each makeup valve (4) in the makeup valve's original position in the head.

  22. Install two makeup valves (4) in the head. Install O-ring seals (8) on plugs (5), springs (6) and plugs (7). Tighten plugs (7) to a torque of 220 ± 25 N·m (160 ± 18 lb ft).


    Illustration 32g00515401


    Illustration 33g00515399

    Note: Be sure to install each relief valve assembly (1) in the relief valve's original position in the head.

  23. Install backup ring (2) and O-ring seal (3) on each relief valve assembly (1), as shown. Refer to Illustration 32.

  24. Install relief valve assemblies (1) in the head. Tighten the relief valve assemblies to a torque of 180 ± 12 N·m (135 ± 9 lb ft).


    NOTICE

    To avoid system damage, make sure that the hydraulic motor is properly filled with hydraulic oil before start-up.


  25. Fill the swing drive with oil to the correct level. Refer to Operation and Maintenance Manual, "Lubricant Viscosities" for the proper oil viscosity and Operation and Maintenance Manual, "Refill Capacities" for the correct amount. Refer to Operation and Maintenance Manual, "Swing Drive Oil Level - Check" for the proper filling procedure.

End By:

  1. Install the swing motor. Refer to Disassembly and Assembly, "Swing Motor- Install" in this manual.

Caterpillar Information System:

3114, 3116, and 3126 Industrial and Generator Set Engines Fuel System - Prime
3176C and 3196 Engines For Caterpillar Built Machines Crankshaft Main Bearings - Remove
793C Off-Highway Truck/Tractor Power Train Transmission, Rear Axle Housing, and Wheel Group - Remove
793C Off-Highway Truck/Tractor Power Train Traction Control System (TCS) Wheel Speed Ring - Remove and Install
69D, 769D , 773D, 773E, 776D, 777D, 784C, 785C, 785D, 789C, 789D, 793C and 793D Off-Highway Trucks and 771D, 775D and 775E Quarry Trucks Braking System Automatic Retarder Control (ARC)
583R Pipelayer Power Train Track Carrier Rollers
793C Off-Highway Truck/Tractor Power Train Drive Shaft Guard (Rear) - Remove and Install
793C Off-Highway Truck/Tractor Power Train Drive Shaft Guard (Front) - Remove and Install
793C Off-Highway Truck/Tractor Power Train Gear Pump (Torque Converter and Transmission) - Assemble
793C Off-Highway Truck/Tractor Power Train Gear Pump (Torque Converter and Transmission) - Disassemble
793C Off-Highway Truck/Tractor Power Train Gear Pump (Torque Converter and Transmission) - Remove
554 Forwarder and 574 Forwarder Mounting and Dismounting
824G , 825G and 826G Landfill Compactor Lift Control
824G , 825G and 826G Landfill Compactor Tilt Control
3176C and 3196 Engines For Caterpillar Built Machines Crankshaft Main Bearings - Install
554 Forwarder and 574 Forwarder Engine and Machine Warm-Up
69D, 769D , 773D, 773E, 776D, 777D, 784C, 785C, 785D, 789C, 789D, 793C and 793D Off-Highway Trucks and 771D, 775D and 775E Quarry Trucks Braking System Traction Control System
527 Track-Type Skidder Power Train Power Train Hydraulic System
69D and 769D Off-Highway Trucks and 771D Quarry Truck Power Train Electronic Control Module (Power Train)
69D and 769D Off-Highway Truck and 771D Quarry Truck Air System and Brakes Front Wheel
IT14G Integrated Toolcarrier and 914G Wheel Loader Power Train Piston Motor (Hydrostatic)
574B Forwarder Operation Information
3406C Engines for Caterpillar Built Machines Engine Trunnion
CB-534C and CB-634C Vibratory Compactors Steering System Bypass Valve
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.